Liaqat Ali
(Mentors)
Instrument & Electrical Designer
Abu Dhabi
Summary of Career
1. Presenting 16 Year diversified experience, within various legendary industries environments, including oil & Gas, Onshore and offshore.
2. Having experience of producing all type of detail engineering design deliverables specially related to instrument installation design in oil & gas industry. Such as Instrument Index, Loop diagrams,
3. Reviewing project drawings engineered by external contractor, for adequacy, accuracy & completeness of design.
4. Studied and solved the problem faced in the field. Coordination with vendors, piping and other departments for instrument requirements and Inter discipline Communication.
5. Having PDMS, PDS, AVEVA Instrument, Microstation, AutoCAD, and INtools experience.
6. Proficient in the use of MS Excel, MS Word, MS PowerPoint, Outlook and Project Electronic Correspondence (EC) Database software’s.
7. Excellent communication skills, both verbal and written.
8. Experience in leading a team of 5 to 10 draftsmen (Draughtsman)
9. Certified by AVEVA Instrumentation and AVEVA P&ID.
10. Developed the Design & Draugting Standards for the Company.
I would like to appreciate Navafiz Volunteer team and Thanks for sharing useful informations. Keep it up with good work and let me know if I can help you in this regard.
Experience as Instrument Designer
NPCC
01 January 2009
18 March 2014
NPCC is an international (EPC) contractor, capable of providing the Offshore and Onshore Oil & Gas industry.
I was the part of its Engineering department in the capacity of E&I Designer. During this period I utilized PDS, micro-station and AutoCAD for the following projects:
MAERSK OIL QATAR, Offshore Project Offshore project of ARAMCO (Safaniya), Saudi Arabi
ADCO (OGD III Upstream Project).
Summary of my responsibilities is as under:
Study and understand the scope of work and specifications for each project, especially related to installation design.
Undertake pre-engineering site surveys.
PDS Modeling of Cables Trays. Reviewed and resolved Modeling Clashes.
Cable tray routing, sizing and supporting.
Design / Prepare Instrument Index, Instrument Hook up details, Instrument installation standards, Instrument / F&G layout, MCT layout, Cable Schedules, etc.
Prepare the MTO.
Resolve Yard queries within the level of capability that might arise during the construction phase to ensure work being carried conforms to drawings.
Prepare As-Built Documents and Drawings.
Experience as Instrument Designer
Saudi Aramco
12 May 2004
09 February 2005
In-house expansion & modification project Executed in Saudi Aramco Mobil Refinery as an Instrument & Electrical Designer in Technical/Drafting Department.
Scope of Job involved the following responsibilities:
Received project scope of work from Project Engineer in the form of written document & verbal instructions. Reviewed and employed those documents and commented if necessary.
Conducted site surveys & collected the necessary design data for the specified project.
Executed man-hour estimation.
Assist in the technical development of assigned project P&ID.
Developed Instrument & Electrical Layouts such as Location Plans, Wiring Layouts, Air Supply Layouts, by deciding that which (existing) Junction Box & Air supply header to be utilized.
Prepared Wiring Connection Lists & Instrument Loop Drawings, Hook-up Drawings, and Installation Standards & Details.
Review & check the technical vendor submittals for installation requirements.
Prepared single line diagrams of main LV/MV panels, and sub-distribution boards, schematics diagrams for low and high voltage switchgear and motor control centres.
Based on drawings & details, Prepared Material Take Off.
Communicated with other disciplines, for related design data, the scope of work & supply. Identified and solved design & construction problems.
Reviewed comments of Project Engineer and Maintenance Group on “Issued for Review” packages, discussed and explained the design basis and finally issued the Construction Packages.
Developed “AS Built” drawings as per completed construction.
Bachelor 03 January 1999
Diploma of Associate Engineer (Electronics)Matric 27 December 1993
Test onlyMaster 10 October 2019
test