BABAR ALI
Profile Views 92

Electromechanical Engineer
Abu Dhabi

Skills
1- Electrical Installation and troubleshooting, 2- Testing and Commissioning, 3- Power and Control drawings, 4-Instrumentation and electrical measurments, 5- Single Line Diagrams, 6- Designing and Estimation, 7- Selection of Electrical Equipments, 8- Site manag,

  • Experience
    3 Years
  • Nationality
    Pakistani
  • Visa status
    Employment Visa in UAE
  • Qualification
    Bachelor - Bs in Electrical Technology
Summary of Career
Work Experience (Employment History)
Experience as Electro mechanical Engineer
  • Employer
    STYRO Insulation material Industries LLC
  • From
    2018-05-15
  • To
    2019-11-10
  • Detail
    • Supervise the MEP work installation, maintenance, repair, and testing of a wide range of electrical equipment’s including Low voltage (LV), Medium Voltage (MV), Extra Low Voltage (ELV), Generators, Motors, Transformers, Batteries, General lighting, Cables and Control Panels of Plant area.
    • Monitor work execution and provide guidance to ensure company safety regulations.
    • Deal personally with more complex maintenance and participations in breakdowns.
    • Preparation of daily, monthly work schedule for all repair, preventive and corrective maintenance.
    • Follow up on the execution of maintenance, installation, schedule, coordinating as necessary with operation technicians and supervisors.
    • Ensuring installation, reliability, availability and maintainability of electrical power and instrument equipment is optimized, so that safety & production targets can be achieved.
    • Identify and troubleshooting electrical problems with a variety of testing devices.
    • Direct and coordinate the activities of process and plant area.
    • Installation and troubleshooting of power and control circuit of different types of motors and instruments.
    • Work on pneumatic system of plant area.
    • Installation and maintenance of Pneumatic actuators, sensors and different types valves like as (gate valves, directional valves, sliding valves, butterfly valves.
    • Controls and Monitor Programmable Logic Controller (PLC) SIMATIC S7-500 by WAGO.
    • Troubleshooting of alarms from PLC system and continuous monitoring HMI monitor.
    • Work on proximity sensor, rotary paddle level switches, limit switches, magnetic level indicators.
    • Troubleshooting of Automation system of plant.
Experience as Electrical Site Engineer
  • Employer
    Ocean-us offshore Engineering services
  • From
    2017-08-01
  • To
    2018-04-30
  • Detail
    • Making relevant documents (data sheets, specifications) for approval of all electrical items using as per project
    requirements.
    • Issuance of Permit to work(PTW) according to work schedule and daily TBT before starting work.
    • Coordination with vendor for material procurement of project as per specifications and approved sheets from
    client.
    • Preparing reports and planning schedule of project.
    • Acting as Technical Authority of Electrical Power Systems.
    • Installation of Generators (60 KVA,500KVA,1000KVA) and their maintenance.
    • Ensuring all electrical lightings, cable rout, earthing as per drawings.
    • Coordinating with operations personnel for planned and corrective maintenance of Electrical equipment.
    Upgrading redundant equipment.
    • Ensuring that all switching of LV is in accordance with operational procedures, safety principles, legal requirements
    and that all registers are maintained accurately.
    • Responsible for all Electrical construction and decommissioning at site.
Experience as Line Supervisor (11 KV Overhead Lines )
  • Employer
    Gujranwala Electric Power Company ( GEPCO )
  • From
    2016-08-01
  • To
    2017-07-01
  • Detail
    • Responsible for carrying out all operation on 11KV distribution network.
    • Attend all kinds breakdowns and tripping occurrence of distribution feeder on urgent basis and restoration of supply.
    • Preventive and Corrective maintenance of all Overhead lines according to the monthly maintenance schedule.
    • Issuance of work permit (PTW) from related substation to work on 11 KV feeders.
    • Inspection and installation of Single phase and three phase KWH meters.
    • Ensuring all HSE rules and safety procedures in all distribution field operation activities with PPE.
    • Installation and modification of distribution lines as per recommendation of project divisions.
    • Prepare technical reports regarding to maintenance and modifications.
    • Identify electrical problems and its solutions.
    • Proper sag of 11 KV feeder and low-tension lines.
    • Inspect electrical components, such as transformers, circuit breakers and Relays.
    • Installation of poles and replacing of conductor of Overhead lines.
    • Estimation and installation of new connections.
    • Reduction of line losses.
Academic Qualification
Bachelor 2016-08-01
Bs in Electrical Technology
Matric 2012-08-01
Diploma of Associate Engineer Electrical ( DAE Electrical )
Matric 2009-03-31
Secondary School Certificate ( SSC )
Achievements