Tariq Ashraf
(Job Seeker - Active)

0
Abu Dhabi


Profile Views 443

Recommendations (5)
Last Seen: 10 March 2022 3:35 PM

Skills
Instrumentation INTools (SPI) Administrator AVEVA Instrumentation Administrator Lead Instrument Designer Design Supervisor Engineering Cordinator SPEL Smartplant Electrical AVEVA Electrical
  • Experience
    Fresh
  • U.A.E Experience
    Fresh
  • Industry
  • Nationality
    Pakistani
  • Visa status
    Employment Visa in UAE
  • Qualification
    Other - Diploma in Instrumentation measurement and control
  • Driving License: Active
Other Matching Titles/Position
Lead SPI (INTools) & AVEVA Instrumentation Administrator
Lead Instrument Designer
Design Supervisor Instrumentation
Engineering Coordinator
Industry Titles

Summary of Career

1. 24 Years of specialize experience encompass as Instrumentation & Control System professional in the field of Oil & Gas, Petrochemical, chemical, fertilizer and Power plant industries. To provide conceptual design, Front End Engineering (FEED), detailed engineering, design reviews and studies.


2. Experienced in all design phases, including interpretation and challenges of standards. Hands on experience on state of art technologies e.g. SPI (Intools), AVEVA Instrumentation in capacity of Lead Administrator.


3. Actively communicate with other disciplines to optimize areas of interface, during the design development, review and check processes.


4. Producing all types of detail engineering design deliverables especially related to installation design, such as Instrument Index, I/O List, Architectural drawings, Cable block diagram / schedule, Instrument location plans, Cable routing / tray layouts, Instrument Installation & Hookup drawings, Interconnection diagram, termination details, Loop diagrams, MTO’s etc. as team lead/supervisor and individual.


5. Reviewing project drawings engineered by external contractor, for adequacy, accuracy & completeness of design. Studying the problem faced in the field. Coordinate with the vendors and other related departments to sort out the problem. Site surveying to take necessary information to develop or modify New/Existing Onshore/Offshore Facilities.


6. Experience to lead a team with time bond quality deliverables, manpower planning and scheduling, teambuilding effective communication.


7. Experienced trainer for on job and class room trainings. Developing Company specifications and standards.


8. Responsible for entire setup and development of projects in SPI (IN-Tools) including project setup, naming conversion, customization of database reports/extracts.


9. Responsible for Managing whole project in IN-Tools (SPI) and AVEVA Instrumentation i.e. development of Project including, project setup, naming conversion, developing customized Index reports, Wiring Report, Loop Diagram, Hook Ups, Cable Schedules, MTO etc.


10. SPI and Aveva database trouble shooting fornt end and back end.


Achievements
SPI & AVEVA Database standardization

Developed reference Databases for Technip


AVEVA Instrumentation database Development

Developed & managed the largest database of AVEVA Instrumentation created so far in middle East for ADNOC offshore.


Reference AVEVA Instrumentation database

ADNOC Offshore selected AVEVA Instrumentation Database developed by me for their future project template .


AVEVA Instrumentation & SPI trainer

Delivered successful training sessions (class room & On Job) to more than 80 engineering professionals.


Appreciation for Accomplishing

Received appreciation for accomplishing AS Built Project of termination & generation of ILD in In-Tools in record time (less man hours then the quoted by sub-contractor) of SABIC’s United Affiliate for EG-1 Plant


Special Appreciation Award

As an Electrical and Instrumentation team, bagged a special appreciation award for completing “Hawiyah Gas Plant Project” ahead of schedule and with complete satisfaction of client, in year 2002


The Best Performer award

Achieved “The Best Performer award” in the year 2000 in recognition of Professional attitude .


Work Experience (Employment History)

Experience as QA/QC Inspector and Instrument Technician

  • Employer

    Descon Engineering Services & Technology (Private) Limited

  • From

    05 March 1996

  • To

    01 March 1998

  • Detail

    Department: QA/QC (1997 to 1998)
    Role: QA/QC Inspector
    Responsibilities:
    • Worked in team dedicated to ISO 9001 certification.
    • Responsible for looking after Instrumentation activities, Developing the Instrument testing, Installation, Field & Lab Calibration Procedures.
    • Development of & central calibration lab & Field calibration Labs.
    • Deployed on FJFC project as a QC Inspector.
    • Conducting the Inspections for Lab Calibration, Field instrumentation Installations & calibrations.
    • Conducting inspections in store when Instruments received from Vendor etc.

    Department: Instrumentation
    Role: Instrument Technician Site Location: ICI Polyester Sheikhupura Pakistan
    Responsibilities:
    • Assigned on Project site of DESCON the project was ICI Polyester Expansion Project, my responsibilities are as under:
    • Lab & field Calibration.
    • PSV Calibration,
    • Cable tray and conduit Installation and Cable lying,
    • JB Installation and termination,
    • Field Instruments Installations and Pressure lead tubing and piping,
    • Member of Pre-commissioning, loop testing Team,
    • Supervising the team.

Experience as Inspector

  • Employer

    Inspectest (Pvt) Ltd

  • From

    02 March 1998

  • To

    02 March 2001

  • Detail

    Responsibilities:
    • In-charge for SCL (Site Calibration Laboratories) and SCT (Site calibration Teams).
    • Team Leader on Various Projects of Calibration, Commissioning and Shutdowns (Instrumentation scopes)
    • Communication with clients.
    • Utilizing testing of DCS by Loop testing, Sequence testing, Drive testing of field Instruments in Pre-commissioning phases and start-ups after shutdowns of different clients
    • Calibration, testing and repairing for Field Instruments, i.e. local Instruments, Transmitters, Controllers, control valves, PSV & PRV and recorder etc.
    • Calibration of Field Analysers & Instruments for Flow, Temperature, Level & Pressure etc.
    • Coordination with several Vendor package specialists for Commissioning of skids & their package units
    • Following were the main activities with some of the major clients of INSPECTEST

Experience as Instrument Designer SPI (INtools) Domain Administrator

  • Employer

    JGC-DESCON (Pvt.)Ltd

  • From

    06 August 2001

  • To

    15 March 2005

  • Detail

    Project Worked on
    1. BAB Field Extension Project, ADCO, Abu Dhabi, UAE.
    2. Engineering & Construction of the “CS-7 (Compressor Station), BANAGAS, Bahrain.
    3. JUBAIL Chevron Philips Petro-Chemical Project (JCP)
    4. Haradh Gas Field Project by Saudi Arabian Oil Company (ARAMCO)
    5. Hawayiah Project by Saudi ARAMCO
    6. Miano-Kadanwari Upgrade and Development Project, Pakistan.
    7. Atyrao Refinery Project, Kazakhstan
    Responsibilities:
    • Prepared Instrument Installation Work Specification and Material specification.
    • Received piping layouts from piping design department and prepared instrument Layout drawings.
    • Developed Instrument Wiring Layout by deciding Junction Box locations & instrument grouping by signal type.
    • Prepared Instrument Air Supply layout and coordinated with piping department for instrument requirements.
    • Prepared Inst Wiring Connection List, Hook-up drawings, Installation details & standards.
    • Prepared Instrument & Electrical Cable Schedules, MTO & BOQ.
    • Prepared LC/LG Arrangements and perform Nozzle calculation studies. Inter discipline Communication.
    • Performed Technical bids evaluation of the quotations received from various vendors around the globe. Such as Fisher, Foxboro, Yokogawa, Panamatrics, etc.
    • Responded to technical clarifications by the client & vendors.
    • Prepared “As Built” drawings after completion of the project.

Experience as SPI (INtools) Domain Administrator and Senior Instrument Designer

  • Employer

    SABIC

  • From

    10 March 2005

  • To

    28 February 2008

  • Detail

    Affiliates Worked in
    1. Petrokeyma
    2. Keyma
    3. United
    4. Yenpet.
    5. Ibn-Rushud
    Responsibilities:
    • Mainly Responsible for IN-tools by providing my services directly or by providing backup support to other personnel working on IN-tools hence solving problems they face, backing up them. also Directly Interacting to Intergraph KSA for solution of problems etc.
    • Reviewing, Marking up and Updating P&IDs and PFDs in SP-P&ID (Smart Plant P&ID)
    • Study and understand the scope of work and specifications for each project, specially related to installation design.
    • Undertake pre-engineering site surveys.
    • Reviewed and resolved Modelling Clashes.
    • Cable tray routing, sizing and supporting.
    • Design / Prepare Instrument Index, Instrument specifications, Wiring & termination Diagrams, Loop Diagrams, Instrument Hook up details, Instrument installation standards, Instrument / F&G layout, MCT layout, Cable Schedules, etc.
    • Prepare the MTO.
    • Resolve Yard queries within level of capability that might arise during construction phase to ensure work being carried conforms to drawings.
    • Prepare As-Built Documents and Drawings.

Experience as SPI (INtools) and Senior Instrument Designer

  • Employer

    LITWIN PEL LLC, Abu Dhabi, UAE

  • From

    01 April 2008

  • To

    07 April 2009

  • Detail

    Project Worked on
    1. ADMA OPCO Replacement Telemetry units
    Responsibilities:
    • Assigned as Domain Administrator and responsible for entire setup of IN-tools including account creation, access right control, Importing, Exporting and front end user trainings.
    • Responsible for generation of Instrument Indexes, I/O Lists, Wiring & Termination Diagram, Loop Diagrams through IN-tools.
    • Review the Instrument Hook up diagram, Cable block Diagram and Typical Installation Diagram.

Experience as SPI (INtools) and AVEVA Instrument Administrator Plus Senior Instrument Designer

  • Employer

    Consolidated Contracting Int’l Company

  • From

    12 April 2009

  • To

    15 May 2012

  • Detail

    Project Worked on
    1. Ras Laffan Port Expansion of Qatar Petroleum situated in Doha
    2. GASCO Habshan Flare Gas Recovery
    3. GASCO Al-Hosan Sulfur Recovery
    4. ADMA-OPCO +100 MBD DAS Island
    Responsibilities:
    • Assigned as Administrator for IN-Tools (SPI) and AVEVA Instrumentation.
    • Responsible for entire setup of IN-Tools (SPI) and AVEVA Instrumentation including account creation, access right control, Importing, Exporting, merging, taking Backup and front end user trainings, Project control, User problem Interface with Client for both software.
    • Responsible for Managing whole project in IN-Tools (SPI) and AVEVA Instrumentation i.e. development of Project including, project setup, naming conversion, Developing customized Index reports, Wiring Report, Loop Diagram, Hook Ups, Cable Schedules, MTO etc.
    • generation of Instrument Indexes, I/O Lists, Instrument Data Sheets, Wiring & Termination Diagram, Loop Diagrams through IN-tools.
    • Review the Instrument Hook up diagram, Cable block Diagram and Typical Installation Diagram.
    • Checking the Instrument layouts, cable routing drawing and JB Assignment.
    • Developing Typical Installation Specifications, Instrument Cable & JB Specifications, Installation & Commissioning Procedures Generating Checking Instrument Index in excel from P&ID.
    • Developing the Engineering Indexes (Device Index, cable schedules). Developing & checking the Instrument Data Sheets.
    • Coordination with 3D administrator and 3D drafting team for extraction of MTO, interface with SPI and AVEA Instrumentation for Cables and Cables trays information.

Experience as Senior SPI (INtools) and AVEVA Instrumentation Administrator and Instrument Engineer

  • Employer

    TechnipFMC

  • From

    01 June 2012

  • To

    02 August 2018

  • Detail

    Project Worked on:
    1. ADCO Jarn Yaphour Accelerated Depletion Development Project (Feed).
    2. ADMA-OPCO EPC work for Umm Lulu Phase II Full Field Development Project Package 2.
    3. ADMA-OPCO Additional Gas Supply to Onshore & Flexibility Assurance at USSC
    4. ADMA-OPCO EPC work for Flares Revamp/Modification Project – Das Island.
    5. ADMA-OPCO Zakum Oil Lines Replacement Project - Phase 1 - FEED Services.
    6. Qatar Petroleum EPC work for FMB offshore project.
    7. ADCO Rumaitha & Shanayel Phase I & III Development Feed Project.
    8. BAPCO Replacement of Steam Turbo Generators at No. 2 Power Plant.
    9. BAPCO SRU (Sulphur Recovery Unit).
    10. ZADCO EPC Works for SATAH Full Field Development Project.
    11. ZADCO EPC for UZ750K Sub-Sea Pipelines, Cables, Offshore Structures, Brownfield Works & IP Facilities (Epc-1) Project.
    12. SABIC Kemya Halobutyl (Saudi Elastomers Project).
    13. Serving Qatar office for day to administration related activities.
    14. Supporting in FEED Projects.
    Responsibilities:
    • Assigned as Administrator for IN-Tools (SPI) and AVEVA Instrumentation.
    • Responsible for entire setup of IN-Tools (SPI) and AVEVA Instrumentation including account creation, access right control, Importing, Exporting, merging, taking Backup and front end user trainings, Project control, User problem Interface with Client for both software.
    • Responsible for Managing whole project in IN-Tools (SPI) and AVEVA Instrumentation i.e. development of Project including, project setup, naming conversion, developing customized Index reports, Wiring Report, Loop Diagram, Hook Ups, Cable Schedules, MTO etc.
    • generation of Instrument Indexes, I/O Lists, Instrument Data Sheets, Wiring & Termination Diagram, Loop Diagrams through IN-tools.
    • Review the Instrument Hook up diagram, Cable block Diagram and Typical Installation Diagram.
    • Checking the Instrument layouts, cable routing drawing and JB Assignment.
    • Developing Typical Installation Specifications, Instrument Cable & JB Specifications, Installation & Commissioning Procedures Generating Checking Instrument Index in excel from P&ID.
    •Developing the Engineering Indexes (Device Index, cable schedules). Developing & checking the Instrument Data Sheets.
    • Coordination with 3D administrator and 3D drafting team for extraction of MTO, interface with SPI and AVEA Instrumentation for Cables and Cables trays information.

Experience as Senior SPI (INtools) and AVEVA Instrumentation Administrator and Instrument Engineer

  • Employer

    Mott Macdoland Dubai

  • From

    05 August 2018

  • To

    04 August 2019

  • Detail

    Project Worked on:
    1. CPE (Dubai) project for Bab Integrated Facilities Project (BIFP).
    Responsibilities:
    • Assigned as Administrator for IN-Tools (SPI).
    •Responsible for entire setup and development of projects in SPI (IN-Tools) including project setup, naming conversion, customization of database reports/extracts, Wiring Reports, Loop Diagram, Hook Ups, Cable Schedules, MTO’s, account creation, access right control, Importing, Exporting, merging, taking Backup and front end user trainings, Project control, database upgradation, resolving user problems, Interface with Client, vendor and contractors and subcontractors.
    • Supervising design team for all design deliverables and issuing Interconnection loop diagram and hook-up diagram through IN-tools, LC/LG arrangements, data sheets generation, reviewing project specification, support on bulk material, cables and field instruments procurement.
    • Retrieving P&ID data from SPF.

Experience as Lead SPI (INtools) and AVEVA Instrumentation Administrator and Design Lead

  • Employer

    MUC MIDDLE EAST ENGINEERING CONSULTANCY ABU DHABI

  • From

    04 August 2019

  • To

    To date

  • Detail

    Project Worked on:
    1. EPC for Rumaitha Thamma Zone B Phase III Expansion Development & conversion of RA Phase I/II CO2 Affected Wells
    2. EPC for Call-out contract for Bu Hasa wellhead remote monitoring and control implementation and construction of oil network over pressure protection – Long Term
    Responsibilities:
    • Assigned as Lead Administrator for IN-Tools (SPI).
    • Supervision of SP-PID and PDMS and SP3 administrators and Design team.
    • Supervising design team for all design deliverables.
    • Inter-discipline Coordination & communication with subcontractors, vendors and client.
    • Responsible for entire setup and development of projects in SPI (IN-Tools) including project setup, naming conversion, customization of database reports/extracts, Wiring Reports, Loop Diagram, Hook Ups, Cable Schedules, MTO’s, account creation, access right control, Importing, Exporting, merging, taking Backup and front end user trainings, Project control, database upgradation, resolving user problems, Interface with Client, vendor and contractors and subcontractors.

Academic Qualification

Other 28 February 1996

Diploma in Instrumentation measurement and control
Certifications
Recommend Tariq Ashraf
Profile Recommendations (5)
Neethu Anzar
Sr. HR Executive
Liaqat Ali
Mechanical Enigeer
Nidhi Jairth
Admin & HR
Mariam Wajid
Human Resource management
Mazhar Adeel
Accounts professional with 7+ years Experience
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals