SAQIB SHIRAZI
Mechanical Engineer
ABU DHABI
Summary of Career
1. Developed project objectives by reviewing project proposals and plans; conferring with management, in order to understand scope of deliverable s
2. To familiar with scope of work, all relevant contractual documents, Budget, Work Breakdown Structure and Organization Breakdown Structure (OBS) etc.
3. Developed the project master schedule and project execution plan. Plan and purchase of materials/equipment’s and miscellaneous items, Established control and verification of materials for the section. Maintaining registers and records of Work Package and associated documents
4. Developed project baselines while monitoring and controlling projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure its satisfactory execution
5. Coordinated with field engineering, procurement &commissioning team regarding their plan schedule and material availability.
6. Analyzed project requirements and reviewing all the project proposals wherein mapping requirements of manpower/ materials resources in which ensuring cost effective execution as per schedule
7. Maintain the as built record for piping isometrics & pipe supports drawings as per agreed design modifications with design consultant
8. Maintained and monitor document library of project & Making work packages for execution team in closed coordination with Client.
9. Developed and maintained a detailed project schedule, which includes administrative tasks as well as all sites involved in the project.
10. Responsible for counter checking by Isometric/Piping plan for the spools, Structure, Equipment’s erected in the correct location, orientation, alignment.
Experience as Sr. Project Engineer
Archirodon Construction Overseas.Co.SA Abu Dhabi
01 September 2017
30 November 2018
• Developed project objectives by reviewing project proposals and plans; conferring with management, in order to understand scope of deliverables
• To familiar with scope of work, all relevant contractual documents, Budget, Work Breakdown Structure and Organization Breakdown Structure (OBS) etc.
• Developed the project master schedule and project execution plan. Plan and purchase of materials/equipment’s and miscellaneous items, Established control and verification of materials for the section. Maintaining registers and records of Work Package and associated documents
• Developed project baselines while monitoring and controlling projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure its satisfactory execution
• Coordinated with field engineering, procurement &commissioning team regarding their plan schedule and material availability.
• Analyzed project requirements and reviewing all the project proposals wherein mapping requirements of manpower/ materials resources in which ensuring cost effective execution as per schedule
• Coordinate with client’s representatives regarding schedule of delivery and anticipated delays
• Liaison with FEDC and Design team to ensure proper calculation of BOQ & BOM as per client provided Drawings and properly understanding the scope of work. Ensure that Project progress reports are timely and regularly prepared.
• Preparation of Daily, Weekly & Monthly Progress reports against based plan
• Working on new modification jobs for the plant improvement. Prepared plan for Piping and structure, fabrication as per drawings.
• Maintain the
Experience as PIPING MANAGER
Al Hassan Engineering Company Abu Dhabi LLC
01 January 2016
31 August 2017
• Provide Engineering and Supervision to site construction team, Planning and verify the resources like Manpower, Construction Equipment’s, Materials and IFC (Issued for construction) drawings etc. earlier to scheduled activities in order to ensure the sequence of construction activities moves smoothly without jeopardize,
• Identified updated requirement of labor, direct materials, direct consumable and equipment based on 3-months look-ahead plan.
• Maintained and monitor document library of project & Making work packages for execution team in closed coordination with Client.
• Developed and maintained a detailed project schedule, which includes administrative tasks as well as all sites involved in the project.
• Ensure timely mobilization of resource for routine site jobs as per Schedule
• To carry out necessary revisions in execution plan and resource deployments
• Provides engineering support to field staff and subcontractor’s
• Follow up with inspections and approval for method statements
• To carry out necessary revisions in execution plan and resource deployments.
• Provide support to all expense projects and maintain accuracy in all piping project and ensure compliance to all piping material specifications and maintain knowledge on all orders
Pipe support based on the priority and material availability.
Experience as Sr. Project Engineer
01 January 2014
31 December 2015
• Raising Technical queries for any technical issues and discussing with the clients to sort out the technical Problem.
• Make sure that all piping welding been carried out as per ASME Section IX or Client specs.
• Make sure that all the personnel involved in the welding and piping are qualified as per ASME Section IX.
• Make sure that all the NDE works been carried out as per ASME Section VIII.
• Review P&ID, GAD and isometrics, structural and civil foundation drawings.
• Coordinate with technicians and provide support to all teams and maintain quality of all work processes in systems
• Perform quantity tracking and progress monitoring on piping, steel structure activities and static equipment installation.
Experience as Sr. Project Engineer
Engineering kinetics pvt ltd (EKL)
01 April 2009
31 December 2013
• Preparation of AS BUILT Drawings for site implementation.
• Responsible for counter checking by Isometric/Piping plan for the spools, Structure, Equipment’s erected in the correct location, orientation, alignment.
• Material Take-off (MTO) Preparation, Coordination with warehouse and Material control Department to control the budget.
• Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics.
• Closely follow the Test-Packs & Preparing punch list as per Client Specifications.
• Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
Experience as Project Engineer
Descon Power Solutions
02 February 2008
31 March 2009
• Ensure that hydro test & reinstatement is to be done as per procedure.
• Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
• Preparation of all project reports required, internally and externally, with the assistance of Project Support Services where required.
• To prepare project close out report and material reconciliation
Bachelor 31 December 2007
BE MECHANICAL ENGINEERING