MUTHUKUMAR
Senior Electrical Designer
Sharjah
Summary of Career
1. Proficient with SP3D2016, SPEL, E3D, PDMS, AutoCAD applications, Microstationv8i, DIALux, Calculux, Navisworks, Smart Plant Review (SPR) and MS OFFICE.
2. Electrical Design, Sizing and 3D Modelling of Cable ladder/Tray, Cable Trench, Electrical Duct bank/Conduits, Electrical Equipment modelling (Like Transformer, Panel boards, Lighting, LCS etc.) and Manhour Estimation.
3. Preparation of 2D Cable ladder/tray layout, Underground cable Trench, Electrical Duct Bank & Conduit layout/ Detail.
4. Preparation of General Arrangement, MCT Sizing calculation, MCT layout/Details, Cable Penetration Layouts.
5. Preparation of Lighting calculation (Overall Plant, Indoor & Outdoor), lighting Layout, Lighting panel Design, panel location & Installation Details.
6. Preparation of Earthing/Grounding Calculations, layouts and Lighting protection layouts.
7. Preparation of Single Line Diagrams, Schematic Diagrams, Block Diagrams, Interconnection & Termination Detail Drawings, Metering & Protection Drawings and Emergency Shutdown System (ESD) Drawings etc.
8. Preparation of various system layouts for Fire and Gas, PA/GA, Telephone/Entertainment etc.
9. Interdisciplinary co-ordination & Participation in inter-discipline review meetings.
10. Involved in site Visit and Data collection, Preparation of MR/MTO. Review the vendor Drawings / documents. Preparation of Cable Sizing calculation and Cable Schedule. Responding to Site Queries and solve the construction related issues with client and Contractors. Preparation of As-Built Drawings. Knowledge in International standards like BS / IEC / IEEE / NEC / ADNOC/Aramco Standards etc
Experience as Electrical Supervisor
01 July 1999
02 July 2002
Supervised the erection of ~ HV Transformers ~ MV Generators ~ DP Structures ~ All types of Circuit Breakers ~ MV Panel Boards ~ Fuse Distribution Boards ~ Laying and Termination of HT and LT Cables.
Experience as Project Engineer
02 September 2002
04 July 2004
Erection of Wind Turbine Generators (750KW 690V, 950KW 690V, 1650KW 690V)
Precommissioning and Commissioning of Wind Turbine Generators, Internal OH Lines (11kV, 22kV, 33kV & 110kV).
Experience as Engineer cum AutoCAD Operator
10 April 2005
18 December 2020
Designed new substations and substation bay extensions (230/33 KV, 110/66 KV, 110/33 KV, 110/22 KV, 110/11 KV, 66/33 KV, 66/22 KV)
Designed the 110 KV, 230 KV Transmission Lines.
Liaised with Nodal Agency/SEB’S Office and collected the relevant information and drawings.
Prepared the Schematic Layout / Plant Layout drawings.
Prepared Bill of Materials and Bill of Quantity.
Experience as Electrical Draftsman
Lamprell
28 January 2006
10 August 2008
Projects involved:
Rig NOBLE GENE HOUSE.
Rig NOBLE DHABI II.
Rig SNEFERU & RIG SENUSRET.
Rig TRANSOCEAN – C.K. RHEIN JR.
Rig NABORS RIG-660.
Rig NDC RIG AL-GHALLAN.
Experience as Senior Designer - Electrical
04 January 2009
04 June 2020
Projects Involved:
Project Name: UMM AL DALKH Early Production Combined Concept and FEED Project for ADNOC.
Project Name: FEED Services of UMM SHAIF Long term Development Plan for ADNOC.
Project Name: HAIL Full Field Development (FFD) FEED for ADOC.
Project Name: Master Gas System Expansion Project – Phase 2, BGCS#1 at KSA for Saudi Aramco.
The Master Gas System Expansion Project – Phase II (MGS Expansion – II) includes one new Booster Gas Compressor Station (BGCS) which is to be located at East-West Pump Station 1 (EWPS-1). This compressor station is designed to produce compressed hydrocarbon gas to meet the requirements of pipeline transfer from upstream sources to downstream destinations.
Project Name: Master Gas System Expansion Project – Phase 1, BGCS#3 &5 at KSA for
Saudi Aramco.
The Master Gas System Expansion Project – Phase I (MGS Expansion – I) includes new Booster Gas Compressor Stations (BGCS-3 & 5) which are to be located at East-West Pump Station 3 & 5 (EWPS-3 & 5). The compressor stations are designed to produce compressed hydrocarbon gas to meet the requirements of pipeline transfer from upstream sources to downstream destinations.
Client Name: Dubai Supply Authority (DUSUP), Margham Plant
I am deputed to DUSUP, Margham plant for Design and Drafting assignment around 4 months
Project Name: Abu Tubul (ABB) Block 60 – Detailed Engineering of Gas Processing Plant (GPP) at Oman, for Oman Oil Company Exploration & Production LLC (OOCEP).
Project involves Detailed Engineering of new Gas Processing Plant in Oman, which includes design of slug catcher, three phase separators, dew point control unit, condensate stabilization unit, propane refrigeration unit, gas compression and export, condensate storage and export.
Project name: Cellar & Main Decks Extension Project at UMM AL-DALK FACILITIES, ZADCO.
Project name: Replacement of Al-Hyleh barge AFT Crane Project, ADMA-OPCO.
Project name: KAIA Jeddah Expansion Project – Fuel Farm & Fuel Hydrant Network – Detail Design, Client: SBG, Saudi Arabia / GACA, Saudi Arabia.
Project involves Detailed Engineering of new jet fuel farm and fuel hydrant distribution network inside airport.
Project name: FEED for Malange Tank Farm Expansion Project at Malange, Angola for SONAGOL.
Project name: Iranian Offshore Oil Company – Reshadat renovation and development project.
Project includes Detailed Engineering of 1 process platform, 1 living quarter platform, 1 Flare platform, 2 Well heads platforms and connected bridge.
Bachelor 01 April 1999
I am completed Diploma in Electrical and Electronics Enineering (DEEE) with 81%