Muhammad Shahzad

Piping Engineer
Ajman


Profile Views 359

Recommendations (0)

Skills
PDMS Piping Desgin & Detail Engineering Steel Structure Design & Detail Engineering Project management Project Liaising QS Piping & Steel Structure Supervision Microsoft Lync SP3D Proposal Estimation Costing AutoCad 2D & 3D Cadworx Isogen Tekla Structures
  • Experience
    13 Years
  • U.A.E Experience
    --
  • Industry
    Oil , Gas & Energy
  • Nationality
    pakistan
  • Visa status
    Visit Visa in UAE
  • Qualification
    Bachelor - B-Tech Mechanical
  • Driving License: Non
Other Matching Titles/Position
Industry Titles
Oil , Gas & Energy

Summary of Career

1. To prepare scope variation/difference sheet as per ITB and as built.


2. To visit project site with client and contractors for TIE-IN study/scheme and battery limits liaison.


3. To prepare feasibility/feed design in plant relocation (e.g. gas processing facility, on & off skid packages, piperack, specification review, utilities, etc.)


4. ? To coordinate IFA/IFC Design Completion with in-house team and foreign designers for (P&IDS Review, On & Off Skid Piping, Pipe Rack, Isogen, Equipment Layout Plan, Isometrics, MTO & BOQs, Specification, DCR Review, etc.)


5. ? To prepare / assist scope of split according to the design and related decision along with BOQ (Bill of Quantities) for quotation and finalizing the contractor with procurement team and prepare primary, secondary & final MTO.


6. To liaise with procurement department for critical spares/items during commissioning phase.


7. ? To manage and allocate project site for contractors’ facilities (Workshop area, yard and residential area) and assist contracts for proposals department.


8. ? To prepare and manage schedule for the design & drafting of complete project and Participate project meetings to provide project engineering status


9. ? To manage shutdown and downtime along with project meetings plus provide project status & assist FEED design team for EPCC developed scope and engineering specifications along with review 3D-Model of complete plant 25% to 100%


10. ? To liaise with AI - ASME Inspector for 3rd party review and approvals, along with leading QA/QC department for project completion documentations.


Achievements
Sucessffuly Completed project detail

• Zoom Pakistan Oil Terminal Project (Terminal Capacity: HSD 1000 M³ Qty. 02, Super Petrol 250 M³ Qty. 03 ground buried, HOBC 250 M³ Qty. 01 Ground Buried, Fire Water Tank 400 M³ Qty. 01 ) • OGDCL Pakistan SOGRI Gas Processing Facility (Plant expansion project) • PEL Pakistan Gas Processing Facility (30 MMSCFD GPF FOR AYESHA-1) • Relocation of REHMAT Gas Plant (RGP) Gas Processing Facility (80 MMSCFD) • MOL Pakistan Well Head Facility (Maramzai-4, MAKORI EAST-6, MARDANKHEL-2 and MARDANKHEL-3) • POGC (Polish Oil And Gas Company) Gas Processing Facility (35 MMSCFD) – PAKISTAN • DEWAN PETROLEUM (PVT) LTD. Pakistan (Amin Stripper Column Replacement Project) • Dense ash plant 84 KTPA. • Refined sodium bicarbonate plant 14 KTPA • 3, 15, 18 mw (CFB) coal fire boiler power plant project. • Soda ash RO-system modification/up-gradation & integration with CFB. • HTM heaters project along with tie-ins shutdown for ICI polyester business • Polymer filters expansion along with tie-ins for ICI polyester • Performed tie-in location phase for complete RO-plant along with EDI unit installation with works and vendors (china) along with 2 NO.S 150m³ water storage tanks (SS-304) • Performed 10 days shut down as a lead engineer for utility & DOW services at ICI polyester business • 110 MW (HRSG) bikki power plant, Pakistan • 120 MW (HRSG) engro, Pakistan • 200 Ton/hour packages, Pakistan • BP-British petroleum, Pakistan • PPL Adhi EPF oil & gas field, Pakistan • MOL Pakistan oil & gas co. B.V. (MOL) makori field development surface facilities, Pakistan • NASHPA oil field OGDCL (98 MMSCFD), Pakistan • Involve in 10 days shutdown for complete up-gradation of tie-In for EPF revamp project (PPL)


Work Experience (Employment History)

Experience as Mechanical Designer (Piping, Equipment, sheet metal works)

  • Employer

    Fabcon Contracting Company

  • From

    01 January 2006

  • To

    31 December 2008

  • Detail

    • To prepare to detail of pressure vessels
    • To review storage tanks drawings
    • To draft heat exchangers & steel structures
    • To prepare the BOM according to design and drawings
    • To ensure that all design inputs and changes are incorporated in drawings
    • To ensure producing quality IFA/ IFR/IFC drawings within proposed time
    • To develop techniques in order to enhance the performance and improve productivity by learning new tools
    • To coordinate and design sheet metal works
    • To prepare General Arrangement Drawings and Assembly Drawings, Shop Fabrication

Experience as Piping Designer / Engineer

  • Employer

    Descon Engineering Services & Technology (Private) Limited

  • From

    01 January 2009

  • To

    13 March 2013

  • Detail

    • To prepare detailed engineering design projects for oil & gas
    • To visit the project site with client and contractors for TIE-IN study/scheme
    • To prepare P&IDs, plot plans, and standard drawings
    • To prepare & develop piping layout plans
    • To prepare information drawings to other disciplines
    • To coordinate with piping stress analysis team and other disciplines
    • To prepare and select piping standard supports
    • To check isometric drawings and piping Layout plans and providing feedback
    • To prepare & review QA/QC red mark-up drawings and incorporate in As?Built for Process, Mechanical, E&I, Civil, etc.
    • To check and provide feedback on all the vendor data and design output
    • To prepare primary, secondary and final piping, valves and pipe supports MTO for procurement & construction BOQ
    • To prepare RFQ & material requisites for pipe, fittings, flanges, valves and special items
    • To review vendor quotes according to project specifications/data sheets and prepare technical clarification sheets to coordinate with vendors
    • To develop comment resolution sheet and technical bid evaluation for client
    • To schedule Brown & Greenfield with the client according to design

Experience as Piping Design & Construction Engineer

  • Employer

    ICI Pakistan

  • From

    15 March 2013

  • To

    31 December 2015

  • Detail

    • To develop project costing sheet & assist in monitoring key payment milestones
    • To review & develop coordinator for engineering services and equipment supply contract with technology supplier (China)
    • To develop scope & outsource battery limit
    • To develop selection criteria for contractors and vendors
    • To support in evaluating and awarding bids with contractors
    • To assist the commissioning team for the development of punch lists
    • To review P&ID'S diagrams
    • To calculate the construction volume of a complete project; e.g. Dia-inches, steel structure tonnage
    • To prepare the bill of quantities
    • To prepare estimation of project cost, time and budget
    • To prepare 3D-Modeling of plants using CadWorx & Navisworks Manage
    • To provide Delta quantities regarding piping, paint & insulation
    • To technically verify vendor quotations

Experience as Engineer III (Piping & Steel Structure Design, Proposal & Estimation with Construction Liaison)

  • Employer

    AESCON Engineering previously PSSA / Project Support Services Asia

  • From

    01 January 2016

  • To

  • Detail

    - To prepare scope variation/difference sheet as per ITB and as-built.
    - To visit the project site with client and contractors for TIE-IN study/scheme and battery limits liaison.
    - To prepare feasibility/ feed design in plant relocation (e.g. Gas processing facility, skid packages, utilities, etc.)
    - To coordinate IFA/IFC Design Completion with the in-house team and foreign designers for (P&IDS Review, On & Off Skid Piping, Pipe Rack, Isogen, Equipment Layout Plan, Isometrics, MTO & BOQs, Specification, DCR Review, etc.)
    - To prepare/assist scope of split according to the design and related decision along with BOQ (Bill of Quantities) for quotation and finalizing the contractor with the procurement team and prepare primary, secondary & final MTO.
    - To liaise with the procurement department for critical spares/items during the commissioning phase.
    - To manage and allocate project site for contractors’ facilities (Workshop area, yard and residential area) and assist contracts for proposals department.
    - To prepare and manage schedule for the design & drafting of complete project and Participate project meetings to provide project engineering status
    - To manage shutdown and downtime along with project meetings plus provide project status
    - To liaise with AI - ASME Inspector for 3rd party review and approvals, along with leading QA/QC department for project completion documentations.
    - To liaise with plant operations team for smooth flow of plant operation
    - To assist FEED design team for EPCC developed scope and engineering specifications
    - To review 3D-Model of complete plant 25% to 100%
    - To review prepare and firm-up the execution and mobilization plan.

Academic Qualification

Bachelor 01 September 2009

B-Tech Mechanical

Intermediate 01 October 2006

Master craftsman Mechanical

Intermediate 15 September 2003

Detail Engineering & Drafting Techniques Mechanical

Matric 01 September 2000

Science
Certifications
Recommend Muhammad Shahzad
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession:
Current City:

Profession: Sr. Mechanical Technologist
Current City: Kot Addu

Profession: QA/QC Welding inspector
Current City: Abudhabi

Profession: Mechanicla QA/QC piping supervisor
Current City: Patna

Profession: Production Engineer
Current City: Sahiwal

Profession: Instrument technician
Current City: Pind Dadan Khan