Hassan Mohiuddin
(Job Seeker - Active)

Mechanical Engineering
Abu Dhabi


Profile Views 509

Recommendations (1)
Last Seen: 26 June 2020 8:23 AM

Skills
Mechanical Engineer Maintenance Engineer Reliability Centererd Maintenance Power Plants Steam Turbine Oil and Gas Maximo Oracle
  • Experience
    6 Years
  • U.A.E Experience
    1 Years
  • Industry
    Oil , Gas & Energy
  • Nationality
    Pakistani
  • Visa status
    Visit Visa in UAE
  • Qualification
    Bachelor - Mechanical Engineering from University of Engineering and Technology Lahore
  • Driving License:
Other Matching Titles/Position
Industry Titles
Oil , Gas & Energy

Summary of Career

1. Dveloped Execution plans of Planned Maintenances of Wartsila 18V46 c4.


2. Supervised Maintenance staff and divided responsibilities to ensure performance


3. Ensured save execution of all maintenance work in accordance of Osha 14001


4. Keep Inventory of plant consumable and safety stock maintained and place orders when necessary


5. Maintaining a clean and enjoyable working environment.


6. Organizing, arranging and coordinating meetings.


7. Supported budgeting and bookkeeping procedures of the maintenance (CAPEX and OPEX)


8. Submit timely reports and prepare presentations regarding Projects and Executed Maintenance.


9. Worked for Development of CMMS (Maximo 7.6) and Organized the data and updated all W.Os


10. Have Hands on Expereience of peforming Maintenance Jobs and have a Passion for Hands on Experience/Technical Experience.


Work Experience (Employment History)

Experience as Mechanical Engineer- Reliability Centered Maintenance Engineer

  • Employer

    Applus Velosi

  • From

    09 October 2018

  • To

    29 April 2019

  • Detail

    • Completed project of Dragon Oil Turkmenistan (DOTL) of RCM Implementation by FMECA and software module provision related to equipment in Central Processing and Storage Facility (CPSF) consisting of offshore platforms (LAM A, LAM B, LAM 28, LAM 63 etc) and Tank Area. Developed all maintenance strategies for all rotary equipment on Rig.
    • Developing Shutdown Management Plan and Asset Management Plan for MARAFIQ Saudi Arabia (Water and Electricity Utility Company) with 9 GTGs, 5 STGs, 5 Desalination Plants and Sea Water Pumps along with Auxiliary Equipment, also perform Gap Analysis of Existing Implemented RCM during Phase1 and Phase 2 performed by Shell.
    • Leading Rotary Part of FMECA based RCM project contracted by JGC (Japan) of newly build compression and transportation facility (UN-21) in upside North Hassi Massoud SONATRACH facilities. Developing all type of maintenance routines, job plans and major inventory list for two years operation of all mechanical rotating equipment.

Experience as Maintenance Engineer

  • Employer

  • From

    01 November 2016

  • To

    17 August 2018

  • Detail

    • Maintained Wartsila engines 18V46(A), 8MW Dresser Rand Turbine, Unex HRSGs, Fresh and Waste Water Treatment Plants, Oil Separators, Air Compressors, Centrifugal and Positive Pumps (Sulzer, Iron, IMO, KSB, Grundfos etc)
    • Conducted implementation of InforEAM system, inventory description and part codes redefinition along with assigning and verification of asset codes to all plant machinery including preparation of CAPEX and OPEX for Maint. Department.
    • Reduced downtime by 80% through measures such as RCM methodology and FMEA.
    • Successfully executed plant expansion/modification / up gradation projects such as Fabrication and Installation of lines in Engine intake area from Engine hall to reduce intake temperature in winter season and Installation of new paper type charge air filters and many other ones, using design software AutoCad and Solidworks.
    • Escalated Overall Operating Efficiency (OEE) by 15-20% through measures such as redefining maintenance strategies after criticality analysis like installation of newer type of turbo Charger for better fuel consumption and minimum maintenance time and cost.
    • Recognized for increasing plant production by reducing maintenance downtime through effective maintenance.
    • Supported on behalf of mechanical department throughout generator (HSG 1600) core repair and rewinding work.
    • Pivotal in streamlining processes through measures such as Implementation of ISO Standard 14224 and BS EN 60812.
    • Planning, developing, implementing and evaluating maintenance policies, Reliability based improvements & procedures for Engines and Turbine.
    • Providing support in fault and diagnostic analysis.
    • Supervising staff assigned to welding, fabrication & insulation during operations for better performance and productivity while implementing different Kaizens and 5S methodologies.
    • Rendering support in troubleshooting and preparing daily technical reports; periodically reporting to department head.
    • Implementing preventive maintenance programs; executing implementation of special maintenance and control of technical results.
    • Maintaining relations with inspection and technical qualification organizations in reference to the area of responsibility
    • Collaborating for modification to plants and equipment to ensure operating capacity of the same.
    • Spearheading quality of machine, equipment or plant maintenance operations including those conducted by third parties is in line with reference standards.
    • Updating data concerning certification of machines & equipment; making arrangements to check current validity of said certification.
    • Planning and executing preventive maintenance of various equipment/ to increase machine up time and equipment reliability.
    • Coordinating activities right from the conceptualization stage to the execution; involving finalization of technical specifications, scheduling, progress monitoring, workforce planning and so on.

Experience as Assistant Maintenance Engineer

  • Employer

  • From

    11 April 2013

  • To

    26 October 2016

  • Detail

    • Performed and planned preventive & corrective maintenance of:
    o 11 x 18V46 Wartsila Diesel Engines
    o 14 MW Dresser-Rand Steam Turbine and its supported 11XAV-6N Aalborg HRSGs and Fresh Water Supply RO Plant
    o 11 x AV-6N Aalborg HRSGs
    • Managed plant auxiliaries like Alfa Laval SA846 & SA 866 Separators, Sperre and Gardner Denver Compressor, ABB Turbo Chargers TPL 76c and other pumps of different types
    • Defined all plant locations on basis of Wartsila Coding process, Assets, reports for generation and consumption and work Flows for implementation of IBM MAXIMO 7.6
    • Analyzed vibration on routine readings of Steam Turbine and Supported Pumps
    • Maintained demands and arranged supplies of consumable tools & parts while coordinating with purchase department and inventory controller
    • Ensured quality of fuel oils same as per engine manual definition, for that including various types of detail testing even Plasma Emission spectroscopy
    • Identified cooling tower plume grounding & effects and for rectification installation and design study of funnel extensions of cooling tower fans on all cooling towers of SPX
    • Installed:
    o Steam trap in steam drums of all HRSGs and proposed design to avoid mixing of HP steam outlet to superheater and steam entering in steam drum from HP superheater
    o Low expansion foam extinguishing system which was not part of the project for plant installation
    • Coordinated with Dresser-Rand Personnel in installation project of new rotor of steam turbine also cyclone separator in superheated line
    • Performed installation activity of replacing seven Converteam generators with ABB Generators of capacity 21345 KVA; replaced steam turbine Converteam generator replacing with Jeuomont generator of capacity 17000 KVA
    • Managed outsourcing of parts which were previously in practice to be purchased from Wartsila; searched on a comparative basis, parts purchased and used
    • Provided schedules for normal operating periods, planned & forced outages to maintenance team and contractor personnel
    • Identified areas to improve operations & maintenance; provided operational reliability & availability

Experience as Intern

  • Employer

    Kapco (kot addu power company)

  • From

    15 June 2011

  • To

    29 July 2011

  • Detail

    Learned about plant maintenance and operation routines and generc overview. Plant has overall capacity of 1600MW and was allocated in section bearing capacity of 397MW working on combined cycle mode forced by two Siemens V94.2 gas Turbines.

Academic Qualification

Bachelor 22 December 2024

Mechanical Engineering from University of Engineering and Technology Lahore
Certifications
Recommend Hassan Mohiuddin
Profile Recommendations (1)
Liaqat Ali
Mechanical Enigeer
Related UserList of Members
Mentor
Rana Shahid

Lead Piping Engineer
Dubai

Last Login: 14 June 2020 8:57 AM
Profile Answers
Related Professionals
Profession: Document Controller
Current City: Al Nahda

Profession: Sales & Customer service Manager
Current City: Sharjah

Profession: Production operator wireline operator floor man roustabout chemical operator machine operator
Current City: Abudhabi

Profession: QA / QC E&I
Current City: Multan

Profession: Accounts Assistant
Current City: abu dhabi

Profession: Engineer
Current City: Lahore