Muhammad Azeem
Electrical Engineer
Karachi
Summary of Career
1. • A competent professional with seven (7) years’ experience in Power Plants; Plant Operations, Preventive and corrective maintenance of Combined Cycle and Wind Power Plants and also EPC Projects; Monitoring Installation/construction, Planning, Engineering, QA/QC, Testing & Commissioning.
2. • Steering successful rollout of Power Plants or EPC projects with accountability of defining scope, setting Time-lines, Analyzing requirements, Prioritizing tasks and identifying dependencies.
3. Proficient in performing & supervising in Operations, Maintenance, installation/construction, Engineering, QA/QC, testing, pre-commissioning and commissioning of 132KV Grid Station,22KV,11KV System, Gas Engines, Steam turbine, Wind Turbine, Cooling towers, ACS, Public automatic box exchange (PABX), VSAT System, Radio communication System, Fire protection system, CCTV system, RO/Water boosting system, Lighting and small power.
4. • Good knowledge of Engineering, Procurement requirements and well versed with MS Office (Excel, Word, and PowerPoint).
5. • Good understanding of O&M Manuals, Technical Equipment’s Data, QA/QC Documents, FAT Documents, Layout Drawings, Schematic drawings, SLDs, Control and interlocking diagrams, Protection and Logic diagrams enabling to get deep insight of construction, O&M stage quickly and clearly.
6. • Deft in liaising with Consultants, Contractors, Sub-Contractors for Plans, Progress reporting, Monitoring and Plant/Project issues.
7. • Excellent Communication, Verbal & Written, Skills, enabling to communicate effectively at all levels within the organization.
8. • Performing FAT for electrical OR Instrument Equipments AS PER STANDARDS.
9. • Responsible for QHSE Policies and procedures and also for cost controlling.
10. • An Innovative, Devoted & Result-Orientated Professional With Strong Planning, Communication, Interpersonal, Presentation & Negotiation Skills; Ability To Meet And Surpass Targets Within Given Deadlines, Regardless Of Pressure.
It was great task to complete the Electrical Works ( 132KV Grid Station) with installation, testing and commissioning as per project schedule. But, the milestone was accomplished before the schedule and plant was energized successfully. This same task was targeted for five EPC Projects and simultaneously were completed before the schedule. On that behalf it was presented Best Leader and Best Performance Award.
Master 03 April 2017
Masters-Management BS-Electronics University of Sindh, JamshoroBachelor 31 December 2011
BS-ElectronicsIntermediate 05 May 2007
Pre-EngineeringMatric 05 April 2005
Science