Khuram Shahzad

Instrument and Control
Multan


Profile Views 305

Recommendations (0)
Last Seen: 10 May 2022 1:05 AM

Skills
o A performance-driven multi discipline professional engineer qualified in Instrumentation with expertise in project execution inspection commissioning of Hydro carbon (green field & brown field) Onshore & Offshore projects and with expertise in operat
  • Experience
    More than 15 Years
  • U.A.E Experience
    10 Years
  • Industry
    Oil , Gas & Energy
  • Nationality
    Pakistani
  • Visa status
    Others
  • Qualification
    Other - Associate Engineering Diploma in Electronics (3 Years D.A.E. Electronics)
  • Driving License: Nill
Other Matching Titles/Position
Instrument Supervisor
QA\QC Instrument
Instrument Engineer
Instrument Foreman
Sr. Technician Instrument
Industry Titles
Oil , Gas & Energy

Summary of Career

1. o A performance-driven multi discipline professional engineer qualified in Instrumentation, with expertise in project execution, inspection, commissioning of Hydro carbon (green field & brown field) Onshore & Offshore projects and with expertise in operation & maintenance of Hydro carbon production plant as well


2. o During 16 years’ experience, acquire thorough knowledge of process control instrumentation, F&G instrumentation maintenance/ installation / inspection & calibration, commissioning and troubleshooting that associated with different control systems (PLC & DCS, ESD, SCADA, IPCS, Relay logic, Hydraulic & Pneumatic) and well familiar with philosophy, application, construction and inspection of different E&I supporting systems like earthing system, lighting system, HVAC system, HSSD system, CCTV, HV


3. o Well familiar for the requirements of E&I buildings like IES buildings, substations, RIE shelter, LOR, LCR, LER, MSS, MCR etc.


4. o Sound knowledge and experience in Risk assessments for hot/cold activities


5. o Healthy experienced in Planning site activities, execution, and pre-commissioning & commissioning activities for new drilled wells wellhead, hook-up with production flow line.


6. o Healthy experienced and having Leading approach for Project execution, pre-commissioning & commissioning activities.


7. o Developed cohesive project execution/ management teams, planned and safely executed projects ahead of schedules. Leading approach and understanding of P&ID’s & Isometrics, PFD’s, ILD’s, SLD’s, IHD’s, C&E drawings, Plot Plans, layout drawings, GA drawings, cable schedule, Tubing Schedule, I/O list, logic diagrams, alarm schedule, cable block diagram, data sheets & wired loop philosophies and Hydraulic Tubing looping Philosophies.


8. o Experienced in preparation of method statement and procedures under the guidelines of applicable codes and standards as per project scope of work.


9. o Experienced in preparation & review of inspection and test plans (ITP’s), quality control procedures (QCP’s), and check lists (ITR’s) for different works (Instrumentation, Electrical, Telecom). Having good knowledge and experience for installation & inspection, process control system panels, Local control panels, process instruments, F&G devices & panels, IPCS panels, power distribution board panels, switch gear, transformer, plant earthing including lightning, lighting system, LV, MV & HV cab


10. o Leading approach for review of Mechanical completion dossier subject to RFC certification. Also, well familiar in internal walk downs, Tri Party Walk downs, for offering completion of entire sub system mechanical works.


Work Experience (Employment History)

Experience as Project Supervisor (Instrument Supervisor)

  • Employer

    Descon Engineering Services & Technology (Private) Limited

  • From

    14 June 2016

  • To

    02 July 2018

  • Detail

    Pak Arab Fertilizer Ammonia Plant DCS Phase 2 EPC Project
    Worked as Site In charge and report to Directly Maintenance Zone Manager and client management
    Responsible for Project Planning, Designing, Execution, routing, Inspection and HSE policies and team
    Attend daily and weekly management meetings and solve the all project Issue’s and delay factors
    Lead the project Structure and Cable Tray Fabrication and Installation team
    Lead the Panel and J. B’s Installation work in the field and Control room
    Lead cable pulling, glanding, termination work of primary and Offshoot cables as per NEC, IEC and ITP

Experience as Instrument Commissioning Supervisor

  • Employer

    Hyundai E&C Abu Dhabi

  • From

    05 July 2018

  • To

    22 November 2018

  • Detail

    Supervise the Commissioning activities and worked on loop checking, trouble shooting, maintenance, function test (Cause and Effect) and lineup the field instrument for plant startup
    Worked on wellhead, LCP, hydraulic control, valve station, flare, riser platform and Pig station Process and Fire and Gas Instruments in Bu-Sakeen Island
    Worked on Processing train, Gas treatment & Condensate areas Instruments Loop checking in Zirku Island
    Prepare the Loop folders, Daily Progress reports to meet the target within deadline

Experience as QA/ QC Inspector E&I

  • Employer

    Intecsa Industrial S.A.

  • From

    02 January 2020

  • To

    27 May 2020

  • Detail

    Worked in Takreer Beaat Expansion EPC Project ADNOC
    Inspect and record the construction works carried out by contractor on site and resolve the site generated Issues.
    Ensure performance of work in strict accordance with the drawings and specification
    Monitor contractor’s work for conformance with contract plans and specifications, approved drawings and approved work plans
    Execute in-house surveillance inspection and follow up
    Compiling weekly quality reports for site work
    Review and Compile the Loop Folders and M.C. Dossier and submit to Client for final submission
    Reporting of all problems in connection with the other discipline works to Resident Engineer
    Prepare the Loop folder, Daily Progress reports to meet the target within deadline

Academic Qualification

Other 20 November 2003

Associate Engineering Diploma in Electronics (3 Years D.A.E. Electronics)
Certifications

Computer Software cert.

  • Duration
    4 Months
  • Description
    Computer operating short course

T-BOSIET

  • Duration
    3 Days
  • Description
    proof for offshore Optima Card

ADNOC PTW

  • Duration
    4 Days
  • Description
    Approved GASCO, ADCO and Al-Hosn Gas Field JP and Picws

PLC

  • Duration
    2 Week
  • Description
    PLC hardware and software
Recommend Khuram Shahzad
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Civil Construction Manager/ Supervisor
Current City: Hooghly, West Bengal, India

Profession: Chartered Accountant
Current City: Jeddah

Profession: Instrumentation Supervisor
Current City: Kuwait

Profession: Planning Engineer
Current City: Abu Dhabi

Profession: Petroleum Inspector
Current City: Dubai

Profession: Assistant Manager Electrical & Instruments
Current City: Lahore