Muhammad Obaid
(Job Seeker - Active)
Project/Sales Engineering
Dubai
Summary of Career
1. Detail-oriented and meticulous professional with 08 years plus experience working in fast-paced industrial environment of oil & gas industry.
2. Diversified exposure has led to development of excellent problem-solving skills, critical and analytical thinking capabilities as well as effective communication abilities.
3. Focal person for all communication related to engineering and project management for company, covering all interdepartmental and top management coordination.
4. Responsible for ensuring compliance to ITB documents/specifications for all Engineering and Vendor Documentation of EPC Project Life cycle.
5. Monitoring development with respect to cost, resource deployment, time over-runs, quality compliance and evaluating production progress and taking adequate corrective actions.
6. Coordinate to manage detailed design of project, technical design instructions, material specification and discipline work practices/procedures.
7. Preparing RFQ (request for quotation) for all project purchase items and sub-contract works. Also actively Participate in relevant HSE studies i.e HAZID, HAZOP and SIL studies.
8. Collaborate with external and internal contractors and supplier for various construction activities.
9. Prepares, supervises and approves the development of PEP from construction point of view, and its implementation plus ensuring Lessons Learned are properly documented throughout the life of the project including Project Close-out.
10. Coordinate with various teams and participate in all claim resolutions meetings and evaluate work plans for all contractors and ensure completion of all tasks with help of all supervisors.
Experience as Project Coordinator/ Project Lead Engineer/ Planning Engineer / Project Engineer ( Electrical and instrument)
02 June 2014
31 January 2020
Project Association:
1. PAKISTAN PETROLEUM LIMITED EPC CONTRACT of GPF-IV Condensate Storage Facility, working as Project/Design Coordinator with additional responsibilities.
2. ENAR-II REVAMP Project, Manghopir Karachi worked as Planning Engineer.
3. PPL ADHI FIELD Gujjar Khan, Punjab, CONSTRUCTION / WELDING / INSTALLATION OF 6" DIA BURRIED FEEDER LINES FOR ADHI WELL-26 (T/K) AND WELL-27 (T/K) worked as Project Site Incharge.
4. PPL GAMBAT SOUTH GAS PROCESSING FACILITY-01 UP-GRADATION PROJECT at Shahdadpur, District Sanghar, Sindh with Chinese Company JEREH (Involved in Electrical, Instrumentation and Control Activities for its newly added skids in Existing Facility).
5. PPL’s Chachar Gas Field Dismantling and relocation of 30MMscfd Dehydration and Compressor Plant from, District Kashmore, Sindh and reinstallation at PPL’s new Field Gambat South Gas Processing Facility,Shahdadpur, District Sanghar, Sindh worked as Project Engineer (E&I).
My responsibilities include:
• Project Site Incharge with core responsibilities associated to directing, organizing and controlling project activities, under the direction of a management team.
• Planning / reviewing sub-contractor’s daily site activities as well as of project staff. Addressing on behalf of company all weekly / fortnightly / monthly site meetings & preparing needed updates / reports / presentations for management.
• Initiating & participating in design reviews, safety reviews HAZOP, HAZID, Risk & Mitigation review, package close out & as built reviews to ensure timely completion of project deliverables.
Experience as EIP-Internee ( Electronics)
17 April 2013
16 April 2014
• Project Association:
1. Revamping of SCADA system: Working and Installation experience on MTU and RTU panels of SCADA (Motorola and Modicon), Installed for Gas wells flow controlling and shutdown purpose of SSVs & ESD valves at 28 wells.
2. ATA Project: Actively Participated in Annual turn around, Carry out different jobs of Hot Loop testing of Instruments, Inspection and maintenance of UPS (uninterrupted power supply).
My responsibilities included:
• Plan, schedule and execute Preventive & Corrective Maintenance in accordance to HSE and QMS requirements to ensure smooth & reliable station operation at Dehydration Plant & instrumentations installed at wellheads of Kandhkot Gas Field.
• Preparation of BOM & BOQ, technical specifications, contract documents and technical evaluation of bids & proposals for execution of departmental projects.
• Joint monthly calibration of FLOBOSS 407, DANIEL Danalyzer Model 500 Analyzer, Gas Chromatograph PLGC-II and Moisture analyzer AMETEK 3050 OLV with customers.
Experience as Trainee Biomedical Engineer
04 June 2012
16 April 2012
My responsibilities included the installation, maintenance & repairing of following SYSMEX instruments:
• KX-21(Hematology Analyzer)
• POCH 100i(Hematology Analyzer)
• XT 1800i/2000i(Hematology Analyzer)
Matric 18 June 2005
Science Subjects (Board: B.I.S.E Abbottabad)Intermediate 10 September 2007
Pre- Engineering Subjects (Board: B.I.S.E Abbottabad)Matric 31 January 2012
Bachelor of Science in Electrical (Electronics) Engineering from Comsats Institute of Information Technology, Abbottabad Campus