Aburrehman Shamshad
Project Electrical Engineer
Dubai
Summary of Career
1. Review and analysis all MEP drawing(Power, Light, Load Calculation, Load Schedule, Fire Alarm, Water System, HVAC, Plumbing, Central Battery system and Low current), materials, Schedules/programs of work, etc.
2. DM/Dewa Approved and Familiar with DEWA Rules and Regulation
3. Reporting to Project Manager, lead electrical & Instrumentation discipline related project scope of works starting from engineering up to final handover stage of project.
4. Strong relationship management, communication skills with the ability to network with Project Manager, Technical Managers, Consultants and Clients.
5. Knowledge of IEC, IEEE, BS, NEMA and relevant local Engineering standard and specifications.
6. Holding expertise in the maintenance of the Equipment’s and machinery installed.
7. Comprehensive experience in reviewing of Engineering Submittals i.e. Project Drawings, Vendor Drawings and Vendor material submittals.
8. Coordinating office activities and operations to secure efficiency and compliance to company policies.
9. Regular project status reports; budget monitoring and trend tracking; bill of materials creation and maintenance.
10. Assist colleagues whenever necessary.
I was relied upon to manage vendors and execute projects and maintenance strategies within a budget of around $29 million.
Experience as Maintenance Engineer
Glow Pak International
01 January 2015
25 July 2016
Experienced in giving proper product presentations to customers and company staff. Learned client and system needs by working closely with the company sales team and engineers, collaborating on promotion and customer support. I also served as maintenance Engineer.
Key Projects Supervised and Installed:
Supervised the maintenance of Chashma Hydal Power Plant Generator 8.
Installed Material Testing Equipment’s & Machines of MATEST (Italy) in GCT Rasool.
Installed the first and only light testing Equipment “Goniophotometric System & Integrated Sphere” in PCSIR Laboratories Complex, Lahore with the collaboration of Chinese Engineer of SENSINGM (China).
Supervised the installment of Quantachrome U.S.A machinery in Polymer Dpt. Lab UET.
Training on “Traceability” from Bureau Veritas in collaboration with UNIDO & European Commission (EC).
Experience as Electrical Engineer
Tobishima Corporation
08 August 2016
30 July 2019
Working as a Project Electrical Engineer in Tobishima Corporation Japan for the project “THE PROJECT FOR ENERGY SAVING IN WATER SUPPLY SYSTEM IN LAHORE” aided by JICA to WASA, LDA, Lahore, Pakistan.
Key Responsibilities:
Supervised the installation of ABB Motors, Pumps, Control panels, Power cables and Power Distribution boards.
Coordination of the implementation of a project, ensuring it is being built correctly.
Project status reports; budget monitoring and trend tracking; bill of materials creation and maintenance.
Designing of electrical single line diagrams (SLD). MEP along Testing & commissioning of 105 Tube well Pumping Stations.
Submit timely and accurately; service reports, time sheets, expense reports film badges and other paper work as assigned.
Experience as Electrical Engineer
Funoon Al Amarar
14 September 2019
To date
*G+2P+8+HC Residential Building Satwa, Dubai.
*Ahmad Bakerat G+1 Villa, Peral Jumerah.
*M32, Animal Facility Building, University of Sharjah.
*Maintenance of Villa and Buildings.
*Zabeel one Tower
*Juma Al Majid & Al Futtaim Buildings Maintenance
Designing and Supervising Electrical works, CCTV, CBS & Fire alarm work and MEP Drawings and Designing.
Key Responsibilities:
*Review and analysis all MEP drawing(Power, Light, Load Calculation, Load Schedule, Fire Alarm, Water System, HVAC, Plumbing, Central Battery system and Low current), materials, Schedules/programs of work, etc.
*Convene and chair special meetings with the service authorities, the contractor, subcontractors and other parties related to his work.
*Estimation of
*Review the shop drawing construction details, product data, material samples, inspection plans, method statements, delivery schedules to confirm compliance with the requirements of the project.
*Prepare / Assist in the preparation of Weekly and Monthly progress reports.
*Ensure the civil obstruction have been cleared to the MEP contractors with MEP activities.
*Coordinating between MEP and civil drawings at the site. Coordination and attending meeting with subcontractors, contractor & consultant, client, supplier.
*Procurement of all MEP material along with the management of supplies.
Matric 15 May 2008
733/850 Marks. 86% BISE Gujanwala, PakistanBachelor 31 August 2014
Electrical Engineer UET Lahore, PakistanIntermediate 11 May 2010
Punjab College of Science