SAMI UR REHMAN KHURAM
Project Engineer MEP
Dubai
Summary of Career
1. Familiar DEWA, SEWA, ADCO and IEEE, IEC regulation. Able to work Multiple Projects simultaneously and complete them on time and under budget; Ensure compliance with Project Technical Specifications, International Standards, and OEM procedures and specification
2. Familiar with all MEP & Electrical methodologies as well as corresponding equipment, material, tools and manpower allocating related to activities
3. Good Experience in both Contracting & Consulting Field with Clear Understanding of Each Side Scope and Responsibilities
4. Planning and implementing preventive maintenance schedules of various machineries and instruments to increase machine up time and equipment reliability. Ensure Resource Availability And Allocation, Report And Escalate To Management As Needed.
5. Expertise in Designing, installing, testing, commissioning & maintenance of electrical equipment, BMS system, fire alarm systems, CCTV Cameras, telecom & intercom
6. Responsible for Planning & execution projects by coordinating/managing design, engineering, project Planning & scheduling, monitoring, construction and commissioning activities
7. Excellent communication and project management skills, High ability to conduct good working relationships with contractors, supplier, clients and other departments
8. Commissioning, Testing, Preventive and Breakdown maintenance of HT/LT Motors, ACB/VCB, HT/LT Panels, HVAC, UPS, DC System, ATS & VFD’s, EDG system and Gen set CATERPILLER, Compressors.
9. Instrumentations: Temperature controllers, thermocouples, Tension controllers, Pressure controllers, Line Position Controller, different type of switches, Edge position controllers ,RTD, Transmitters, transducers, resolvers and encoders, Pneumatic Valves, Load cells, etc.
10. Maintenance planning to reduce downturn & optimizing plant availability; Root cause analysis of breakdowns, trips & equipment failure; Modification & engineering of Plant Systems for betterment
Experience as Asst. Electrical Engineer
WESTPOINT - INDUS HOME LIMITED
01 June 2004
27 January 2010
As an Asst. Electrical Engineer my duties were involving complete Engineering, Procurement, Construction, Commissioning activities, installation, troubleshooting, Erection and cabling of Power Station, Boiler and Water Treatment Plant
Experience as Electrical Engineer
Olayan Descon Engineering Company
20 July 2010
26 August 2013
As an Electrical Engineer my duties were Preventive & Breakdown maintenance of HT/LT Motors up to 1000 KW, ACB/VCB, HT/LT Panels, HVAC, Switchgear, Hydraulic Valves, Different types of Instruments and support in-house modification and upgrading projects by either modifying existing drawings or developing new drawings, Maintain and updating records as per the audit requirements, organizing skilled personnel for the job, Sequence of activities to be carried out for work as per Method of Statement, Ensure all personnel involved are in safe working condition, Assignment of daily activities to workers, Development of daily work progress
Experience as Automation Engineer
Saudi Binladen Group
08 November 2013
16 May 2016
As an Electrical Site/ Automation Engineer my duties were Responsible for all work from Execution till Commissioning & post-Commissioning activities, reporting to Manager (E & I), leading a team of engineers, supervisors & technicians, Prepare MEP & Electrical Maintenance, Automation, Installation, Commissioning and Operation. I have been lead several projects of electrical, MEP& automation and completed as per international, regional and client standards and requirements. I upgraded LIEBHER, OCMER &HARRIER of concrete batching plant, WIBAU asphalt plant and repaired PUTZMEISTER concrete pump and I got my promotion as a MAINTENANCE HEAD in my 1st year of joining
Experience as MEP ENGINEER
QBG Group
08 July 2016
19 September 2018
As a MEP ENGINEER my Responsibilities are Full Involvement in Handing over of project from Contractor to Client ensuring all documents are available and also ensure the quality of work are effected on site; Checking and Commenting on Final submitted As-Built Drawing of External MEP services such as LV Network, ELV network, Solar Network, Drainage, Water Supply HVAC and Internal Electrical Services in individual buildings such as Lighting, Power, BMS, Fire Alarm, CCTV, WIFI, Telephone, Access Control and Emergency lighting Systems
Experience as SENIOR PROJECT ENGINEER
Al Bonian Intl LLC
12 October 2018
To date
As a SENIOR PROJECT ENGINEER my Responsibilities are responsible for smooth execution, commissioning & maintenance of Electrical systems and involvement in Planning Stage of the project in coordination with the planners involvement in the Material Submittal and ensuring that the material selected is complying with Project Specifications and get approval on all Material submittal , Manage MEP & ELV Activities (such as A/C Load, Plumbing, HVAC, Fire Fighting, Switch gear, Transformer, Emergency Generator, UPS system, Substation, Size and route of cable, conduit/Cable tray, Grounding, Earthing, CCTV, ACCESS control, Fire alarm system, Home Automation system, BMS, ..etc.) And monitoring the work according local, national code and customer specification to ensure project and develop company standards under time schedule and cost. Preparing the bids, Quotations, BOQ, BOP and manage the workforce. Conduct the Inspection with Consultants and get all works Approved as per Approved drawing
Matric 03 June 1998
ScienceIntermediate 14 June 2001
Diploma Of Associate EngineeringBachelor 16 June 2009
B-Tech (HONS)