NISHANT KUMAR
MEP Electrical Engineer
Abu Dhabi
Summary of Career
1. Experience in Brown & Green field (Refinery) for all the MEP activities.
2. Experience in installation of lighting works in gas pipe racks and in Incinerator.
3. Providing technical advice to staff designer, supervisor, inspector and contracting service provider, regarding installation and maintenance of MEP System.
4. Planning, organizing the review and evaluate the work of consultants, contractors, and others. knowledge of MS Office, AutoCAD and Project management software.
5. Reporting to the Director, Project Manager for the latest updating on the drawing submissions, Daily Reports, monthly reports, Material status etc.
6. Wrote protocols, qualification documents, test plans and test reports for quality assurance purposes
7. Liaising with the local authority / Municipality / Civil Defense (where appropriate to the project i.e. Fire Alarm Cause and effect, BMS, HV/LV Packages) to ensure compliance with local construction regulations and by-laws.
8. Expert in electrical power, lighting, Fire Alarm & Energy Management.
9. Planning, organizing the review and evaluate the work of consultants, contractors, and others. knowledge of MS Office, AutoCAD and Project management software.
10. Analyzing mechanical, Electrical and Plumbing engineering problems and formulate solutions.
Experience as Jr. Electrical Engineer
02 June 2014
25 December 2015
• To provide the entire electrical solutions as per requirement.
• Carry out all the works related to MV & LV.
• Familiar with NEC & industrials wiring methods, including materials take off.
• Plan and supervise the work of electricians.
• Carry out all the works related to Fire alarm systems.
• Carry out all the Electrical works as per the approved drawings.
• Gain approved Electrical Shop Drawings, MEP- Coordination Drawings, Work method statement and Project Specification from Contractors Project Engineer.
• Ensure all Electrical Containment, Cable / Wiring, Fittings, and accessories are available and approved by Inspection department prior to installation
• Coordinate with other disciplines and ensure site clearance is available to start the HV/LV Activities
• Check for the sufficient workforce such as Supervisor, Foreman, etc.
• To maintain safe all construction HV/LV activities are carried out in accordance with the Company’s safety policies and procedures; ensure that Company & Contractor staff uses appropriate safety and protective equipment.
• Closely monitor site activities to ensure quality of work follows approved shop drawing and Specification and get daily progress report from site supervisor or Foreman and update to project Manager or construction Manager.
• Preparing relevant documents to conduct inspection for completed installation activities
• Carry out all planned site inspections as per the intervention points marked in the relevant drawing and standards
• Preparing the relevant documents to Conduct Testing and inspection.
• Carry out all planned site inspections as per the intervention points marked in the relevant drawing and standards
• Preparing the WIR (Work Inspection Report) to Conduct Testing and inspection.
Experience as MEP Project Engineer
Dome international LLC
04 February 2020
To date
• Experience in Brown & Green field (Refinery) for all the MEP activities.
• Experience in installation of lighting works in gas pipe racks and in Incinerator.
• Experience in installation of all GIS, Switchgear and panel installation in refinery substation as per ADNOC requirement.
• Providing technical advice to staff designer, supervisor, inspector and contracting service provider, regarding installation and maintenance of MEP System.
• Analyzing mechanical, Electrical and Plumbing engineering problems and formulate solutions.
• Planning, organizing the review and evaluate the work of consultants, contractors, and others. knowledge of MS Office, AutoCAD and Project management software.
• Continually review the contractor’s construction schedule during the progress of the site works with regards to MEP services and report to the Project Director on the same.
• Undertake general project site observation/inspection of the mechanical services works for Contractor’s adherence to the approved shop drawings and Consultant’s specification, good working practices, and construction schedule.
• Expert in electrical power, lighting, Fire Alarm & Energy Management.
Experience as Electrical Site Engineer
ANEL EMIRATES GENERAL CONTRACTING LLC
06 January 2016
03 February 2020
• Reporting to the Project Manager for the latest updating on the drawing submissions, Daily Reports, monthly reports, Material status etc.
• Active involvement in weekly meetings with the Project management & QC Supervisors and manager to resolve the site related issues.
• Designed and approved power distribution requirements for construction of high tech manufacturing facilities.
• Site supervision / Agreement with Contractor, Client, and Design Disciplines.
• Wrote protocols, qualification documents, test plans and test reports for quality assurance purposes.
• Continually improved methods and procedures for processes, measurement, documenting and work flow techniques.
• Carry out all the works related to SWGR, SMDB, DB, FDB, DGP, VESDA, and RPS.
• Determine procedures for maintenance, installation, modification and repair of electrical assignments jobs and assign to appropriate personnel.
• Analyzing power systems and technical drawings for electrical systems upgrade projects, and to resolve field problems.
• Supervising and commissioning of all electrical systems installations
• Conducting and handling the inspections with AECOM and ADDC.
• Follow-up and checking interface data with client, partners, equipment suppliers, piping, civil etc.
• Liaising with the local authority / Municipality / Civil Defense (where appropriate to the project i.e. Fire Alarm Cause and effect, BMS, HV/LV Packages) to ensure compliance with local construction regulations and by-laws.
• Communicating with clients and their representatives including attending regular meetings to keep them informed of progress.
• Overseeing quality control and health and safety matters on site.
• Assist the Commissioning Team in Pre-commissioning & Commissioning stages of all Electrical installations and Equipment’s.
• Assist the Project Engineer during Preparation of final Test Reports, as built drawings, Operation & Maintenance manual and handing over the project to client
Other 05 June 2014
Bachelor of Technology in Electrical and Electronics Engineering from JNTU, Hyderabad (India)