Bilal Hassan Baryar
Service Engineer
Riyadh
Summary of Career
1. Comunicating with cutomers regularly
2. Securing technical sales by endorsing customers to keep backup of parts and change as recomended
3. Coordinating with all team members
4. Sharing outcome with Colleagues
5. Monthly report writing
6. Leading a team of 5 Technician
7. Sharing usefull information
8. Responding timely to all emails and regular phone calls
9. Keep in touch with customers to be aware if there is any breakdown
10. Cost controling project to project
During my tenure in Sealed Air i was able to recognised as “ Expert Service Engineer” twice(2015, 2017) in Switzerland.
Experience as Technician
Siemens
11 April 2007
30 April 2009
Main Duty was to maintain power supply either from Grid or Generators to Support Construction Site Capacity of Substation was 1 MW (megawatt).
Installation of Power Panels including HT and LT distribution panels were installed on different locations throughout the site
Installation of 2 Diesel powered Generators with Auto Change overs.
Routine Maintenance of transformer, generators & power factor.
Experience as Service Engineer
Universal Engineering
05 May 2009
30 November 2011
Was working in Universal engineering as service engineer in the field of power generation. ? Installation of Generators (natural gas fueled) up to 3MW (megawatt).
Coordinating with Sales team and streamlining the installation schedules. ? Working with Mechanical team to meet timelines.
Assembling of control panel as per design.
Installation of Auto Transfer Switch (ATS).
Synchronization of more than 2 Generators.
Synchronization with grid station.
Routine Maintenance of Alternator and other Electrical/Electronic parts periodically.
Routine Maintenance of PLCs.
Troubleshooting of Control system.
Signal Communication between Power houses to Control room.
Experience as Project Engineer
Roken Sanabel Engineering
20 January 2012
31 July 2013
I was responsible from installation to handing over the Chillers, HVAC & related utilities and that was including following works.
According to project Drawings installation of control Panels of Chiller (about 500 tons).
Installation AHU, FCU & cable trays as per design from Consultant/customer.
Termination of power and control cables to operation panel.
Signal communication of HVAC/Chillers with BMS's main computer.
Installation of Power supply panels according to layouts.
Acceptance of all installed units to the consultant according to local standards.
Experience as Service Engineer
Sealed Air
06 August 2013
31 December 2017
Sealed Air Corporation is Major Supplier of Food Packaging materials and equipment and having global partnership with other Food Packaging companies.
My duties were to maintain Safety standards and professional operations procedures.
I was responsible for the Presale, Installations, commissioning & troubleshooting of the Equipment also I
was Responsible for the line.
Acceptance on factory floor including general maintenance and troubleshooting additionally trained
cleaning staff for how clean the equipment hygienically without disturbing the
Electrical/Electronics/Mechanical system.
I had responsibility to attend Emergency breakdowns either on phone or by visiting the customer.
Marinating the Equipment under preventative Maintenance contracts every 3 months doing complete
checkup of the equipment and recommend some spares to change if necessary
In 2013 when I joined the corporation I was assigned to Sealed Air's sister company "Diversey".
I was responsible for the customers in beverage and food sectors.
I was leading the team of 5 Technicians to deliver highly professional service to our customers.
I was also responsible to Design and installation of Automated Conveyor lubrication systems (it was
operated by Siemens step 7-300 PLC) we had installed few CIP (Cleaning in Place) mobile stations with
different customers.
We installed automated air disinfection system by using PLCs.
We installed Disinfection gates to ensure micro cleaning on all passing vehicles.
Installation of Automated chemical delivery systems by using PLCs.
Installations of automated filler cleaning with different beverages customers.
Other 01 July 2006
Diploma of Associate Engineer in ElectronicsMatric 01 June 2003
Matric in scince