Ahmed Hassan
Electrical Engineer
Karachi
Summary of Career
1. Inspection, Testing, verification and Condition assessment of Electrical equipment (Power/Auto Transformer, Circuit Breaker, Rotary Machine, Medium Voltage Cables etc) using advance diagnostic tools and international guides
2. Cost estimation, Techno-commercial proposal preparation, Tender submission, Client coordination from execution till report submission
3. Project coordination, Project planning, creating schedules, preparing method statement, Permit to Work. Job safety analysis (JSAs) and Risk Assessment
4. Good proficiency in advance testing equipment include CPC-100 with all accessories, MPD-600 with UHF and Drain Valve Sensor, VLF HiPot, CT Analyzer, CIBANO , FRANEO, DIRANA, MEGGER FREJA 549
5. Review primary and secondary design layouts and schematics of newly proposed grid stations or extension works and coordinate with vendor to incorporate changes as per company’s requirement
6. Manage a team of 40+ staff including (Associate Engineers, Supervisors, and Electricians) for predictive and preventive maintenance of 18 out of 64 Grid Stations up-to 220KV.
7. Plan and organize technical training and assessment of junior staff to evaluate their technical capabilities
8. Up gradation of control schematics(as per requirement), plan maintenance schedule, maintain tripping records, plan major installation shutdowns to replace old fatigue equipment and submit daily/weekly progress report to line manager.
9. Designing of control and protection scheme of LCC and duplex panel for 132kV trafo bay
10. Arrangement of resources (both manpower & material), planning of complete project including management of shutdowns, safety at site, tracking project progress and ensuring the safe work and successful completion of project under stipulated time and budget
Experience as Assistant Manager - Grid System Maintenance Department
K-Electric Ltd
19 December 2016
09 February 2018
Managing a team of 40+ staff including (AEs, Supervisors, and Electricians) for smooth operation and maintenance of 18 out of 64 Grid Stations up-to 220KV.
Review primary and secondary design layouts and schematics of newly proposed grid stations or extension works and coordinate with vendor to incorporate changes as per company’s requirement.
Up gradation of control schematics(as per requirement), plan maintenance schedule, maintain tripping records, plan major installation shutdowns with prior notification to our valued customers and reporting daily/weekly progress report to line manager.
Up gradation and replacement of old fatigue EHV equipment like (CT, PT, Isolator, and Breaker) with new one at various grids.
Preparation of procurement cases of HV and LV equipment and technically evaluates the offers to ensure compliance with company specs.
Experience as Senior Electrical Engineer
SGS Pakistan
12 February 2018
31 December 2020
Inspection, Testing and Health assessment of Electrical equipment like Power/Auto Transformer, Circuit Breaker, Motor, Generator, Medium Voltage Cables etc as per IEEE/IEC standards and guides
Advance diagnostic testing includes Partial Discharge measurement and analysis of MV Motors, Switchgears and MV cables. PD sensors include TEV, Q-charge and VLF technology for MV cables
Cost Estimation, Proposal preparation, Tender Submission, Client coordination from execution till Report Submission
Plan, organize and coordinate visits and technical meetings with BD team to meet the annual targets
Matric 31 May 2007
Science SubjectsIntermediate 30 May 2009
Pre-EngineeringBachelor 30 May 2014
Electrical Engineering