Zeeshan Farid

Electrical Engineer
Multan


Profile Views 800

Recommendations (0)
Last Seen: 26 August 2020 5:41 PM

Skills
AutoCad Drawing Making Design Calculations Equipment Selection Technical Troubleshooting Technical Audit Safety Audit Awareness of local regulations related to HSE Implementation of safety procedures Reading / making of electrical drawings Instrumentatio
  • Experience
    6 Years
  • U.A.E Experience
    --
  • Industry
    Engineering
  • Nationality
    Pakistan
  • Visa status
    Not Applicable
  • Qualification
    Bachelor - B.Sc. Electrical Engineering & Honoured To Have been Registered With Engineering Accreditation Authority, Pakistan Engineering Council, PEC.
  • Driving License: Pakistani Driving License Holder
Other Matching Titles/Position
Industry Titles
Engineering

Summary of Career

1. Presenting 07 Years of diversified experience within various legendary industrial environments, including FMCG Sector.


2. A devoted Engineering professional having intensive hands on experience of working on Electrical Building Designs, Layouts, Generation, transmission & Distribution schemes.


3. I have added & enhanced value in the organization by delivering on variety of Multi Million projects including Cost Cutting & energy efficient projects from their feasibility reports to complete execution.


4. Versatile experience of Managing Contractors to support operation of the machines from EH&S Perspective


5. I have led the project of SAP PM Module implementation across the plant in the capacity of key user while migrating 10 years of Historical Data from Legacy System to SAP PM Module.


6. Proficient in the use of MS Excel, MS Word, MS PowerPoint, MS Visio, ERP AutoCAD, and SAP PM Module.


7. Prepare Electrical Drawings as per IEC & IEEE Standards.


8. Ensuring Continued Drive For EHS Improvements, Risk Assesments & 5S Implementation.


9. Managing Spare Parts Optimized Inventory to Ensure High Service Level Of Machinery.


10. Experience in leading a Technical team of 25 to 30 People (Technicians, Foremen, and Supervisors).


Achievements
Cost Saving Through Chiller Run on steam generated by Flue Gases

Successfully implemented the scheme of cost saving of worth of Rs. 20 Million/Annum by energy saving (1296000 Kwh) through chiller run on steam generated by flue gases.


Installation of HT AVR Project on 11KV Mepco Feeder

Planned & executed installation Project of 300 Amp, 11KV Auto Voltage regulator (Siemens) on Mepco Feeder which resulted in cost saving of Rs 4 Million/Annum.


Improvement in System Load Efficiency

Increased System Load Efficiency from 75% to 85% Through Proper forecasting of Load Management.


Plant Load Extension project of Mepco Feeder

Planned & executed Plant Load Extension Project of Mepco Feeder from 3200 KW to 4300 KW.


Load Synchronization Project on Both HT & LT Side

Synchronization & Load Distribution on both HT and LT Network with 4*1 MW Gas Engines (jenbacher 320), 3*1 MW Diesel Engine (CAT 3512). MEPCO 4.3 MW WIth CompAp Synchronization Module by RA Engineering.


Migration of Technical Data from Legacy System to SAP PM Module.

Here in this Project, As a SAP PM Key User, i implemented SAP PM Module Across the plant through Migration of Data from Legacy System to SAP PM module which included a constant team effort in Preparing Master Data Plans, Maintenance Schedule Plans & integration with other Modules.


Installation Project of Energy Analyzers Across Whole Plant

Established the Line Level Standards (LLS) by istalling the energy meters across the whole plant to monitor and record the energy consumption while launching numerous projects in minimizing their consumption.


Installation Project of Energy Analyzers Across Whole Plant

Established the Line Level Standards (LLS) by istalling the energy meters across the whole plant to monitor and record the energy consumption while launching numerous projects in minimizing their consumption.


Major Overhauling 60K(60000) Hours of Gas Generator Jenbacher320

Successfully carried out Major Overhauling (60000 HRS) of Gas generator Jenbacher320.


Installation of Gas Generator Jenbacher320 & Diesel Generator Caterpillar3512

Successfully completed installation of Gas Generator Jenbacher320 & Diesel Generator Cat3512


Designing of HT Scheme at Substation

Designed HT Scheme in Substation at Plant site with two Transformers 2500KVA (PEL) for HFO/MEPCO and Diesel/Gas Gensets with Bus Coupler on HT while on LT side, two 4000Amp ACB for source and one Bus Coupler with Synchronization Module for Load Shifting.


Work Experience (Employment History)

Experience as Executive Engineer-Electrical

  • Employer

    Volka Food International

  • From

    03 December 2012

  • To

    13 December 2019

  • Detail


    1-Operation, Maintenance and Technical Inspection of Whole Network across the Plant that includes Power Generation Station of 07 MW Capacity (Diesel Generators & Gas Generators), 11KV Substation, MV & LV panels and also managing he operation of Compressors, Cooling towers, Testing of Earthing Schemes, Transformers installed ranging from 1500KVA to 4000KVA, Solar Plant installed of 500 KW capacity.

    2-Responsible for Planning Electrical Projects by determining Plant Requirements & Specifications, Establishing Installation Schedules and also planning Shutdowns.

    3-Responsible for Monitoring, Operating & Controlling System’s Parameters for smooth operation of the plant to minimize the down time & maximize the plant availability.

    4-Responsible for Energy Management & Load Calculations to Distribute Load Across the Plant.

    5-Responsible for carrying out technical investigations as required to identify RCA for resolving Operational & Maintenance issues.

    6-Responsible for Co-ordination with Government Authorities like MEPCO & SNGPL for Communicating & Handling Complaints.

    7-Responsible for Resolving Problems, Completing Audits, Identifying Trends, Determining Technical System Improvements & Implementing Changes.

    8-Leading, managing, developing and implementing preventative maintenance strategies for increased plant availability, reliability and reduction in failure rate and maintenance predictive costs.

    9-Preparing & Maintaining SOP’s For Maintenance Records, Work Permits & Reports on daily basis.

    10-Implementation of TPM (Total Productive Maintenance) for best results.

    11-Prepare Electrical Drawings As Per IEC and IEEE Standards.

    12-Preparing, tracking and controlling revenue budgets for Engineering and Utilities.

    13-Ensure continued drive for EHS improvement; Risk Assessments& 5S Implementation.

    14-Managing Electrical Spares optimized inventory to ensure high service level to the machinery.

    15-Managing Contractors to support operation of machines with timely execution of tasks from EH&S aspects.

Experience as Electrical Trainee-Technical Operations

  • Employer

    Coca Cola Beverages Pakistan Limited

  • From

    03 September 2012

  • To

    30 November 2012

  • Detail

    1-Learned about the measurements and procedures taken during the Annual Shut Down of plant.

    2-Prepared SOP’s for regular maintenance of Utility Section.

    3-Maintaining HSE requirements in assigned area.

Academic Qualification

Bachelor 18 November 2024

B.Sc. Electrical Engineering & Honoured To Have been Registered With Engineering Accreditation Authority, Pakistan Engineering Council, PEC.

Intermediate 18 November 2024

Passed it With A+ Grade.

Matric 18 November 2024

Passed it With A+ Grade.
Certifications
Recommend Zeeshan Farid
Related UserList of Members
Mentor
Muhammad Maaz Ahsan

Inspection Engineer
Lahore

Last Login: 07 September 2020 10:31 AM
Profile Answers
Related Professionals
Profession: Engneer
Current City: Chennai

Profession: Mechanical Engineer
Current City: Bhimber azad kashmir

Profession: Mechanical Engineer
Current City: sharjah

Profession: Project Manager-MEP
Current City: Sharjah

Profession: QC & QA Mechanical
Current City: Lahore

Profession: Electrical Engineer
Current City: Abu Dhabi