SNGPL Service Line Material & Line Pipe Inspection
QA/QC Inspector
Projects Manager
PRESSURE VESSEL INSPECTOR
Profile Details
Experience
3 Years
U.A.E Experience
Fresh
Industry
Oil , Gas & Energy
Nationality
Pakistan
Visa Status
Others
Qualification
Master - MS Engineering Management
Driving License
Car
Industry Titles
Oil , Gas & Energy
Summary of
Career
Inspection Engineer with a demonstrated history of working in the international inspection industry having 3 years of practical experience in oil and gas industry.
Having experience in Inspection of Pressure Vessels, Storage Tanks and Piping in different Oil & Gas Power Plants.
Pressure Vessels Shell & head thickness calculations, maximum allowable working pressure, static head pressure, Hydrostatic, pneumatic test pressure calculation as per ASME Sec VIII Div I.
• Report writing, Calculation of Corrosion rate, Remaining life and Next inspection interval.
Review of Hydrostatic test procedure, Repair Procedure, PMI Procedure, test packs.
Monitoring all repair activities execution to ensure the repair was done as per actual recommendations.
TPI during Fabrication of Pressure Vessels, Heat Exchanges, Storage Tanks & Pressure Piping.
Work as Third Party Inspection of Polyethylene and Mild Steel Pipe Lines & Fittings at SNGPL project.
Poly Ethane Pipe Lines & PE Fittings Inspection
Also Having a Professional Degree with strong quality assurance of focusing on products and their efficiency, safety, and optimal performance as well as having experience of product examination, highlight their defects and suggest their solutions.
Responsible for in-service & off-stream inspection of Pressure Vessels in Petrochemical Industry and Power Plants in compliance with API-510.
Internal inspection of Pressure vessels, Heat exchangers, Columns & Storage Tanks during Shutdown and reporting of abnormal findings.
Review of thickness data, Short term & long-term corrosion rate and remaining life preparation of inspection report and finalization of corrective inspection recommendations based on inspection findings.
Monitoring all repair activities execution to ensure the repair was done as per actual recommendations.
Welder Qualification test inspection as per ASME section IX.
Review and verified WPS & PQR as per ASME section IX.
Remote visual inspection (Bore-scope) of the Boiler and Heat exchanger tubes.
Witnessing NDT and Hydro-test for Pressure vessel.