Shamraiz Aslam
Quantity Surveyor
Ras Al khaimah
Summary of Career
1. Monthly IPC's
2. BOQ Preparation
3. VO's Preparation
4. Rate Analysis
5. Material Reconciliation
6. Labor Reconciliation
7. Project Budgeting and Monitoring
8. Bar Bending Schedules
9. Sub Contractors Bill
10. Technical Presentation
Experience as Senior Quantity Surveyor
Usman Engineers
12 February 2024
27 April 2024
Re-Construction of Old P&D building lahore secretariat project (2 Basements, G+10) under the Consultancy of IDAP and Turkpak-Nespak JV. Core responsibilities are as follows:
1. Payment Certificates
2. Variation Orders Preparation
3. Rate Analysis of Extra item
4. Reconciliations (Material & Labor)
5. Claims
Experience as Quantity Surveyor
Qavi Engineers
02 March 2016
07 February 2024
Package #1: Infrastructure work of Bholari Tachnical Area. (Road, HDPE Water Supply System, OHWT's, Sewerage System, Drainage System, HT & LT Electrical System, 1.6M Gallon Waste Water Treatment Pond, Directional Drilling, Base Monument, Base Entrance Gate).
Package # 2: Fuel Storage Tanks (7x 50k and 1x 100 Gallons), Fuel Pipe Lines for Filling and Decanting, Bowser Decanting Shed, Bowser Filling Shed, Allied Services and Buildings.
Package # 3: Bholari Base Flood Protection Works (30m wide PCC Drain, Connencting Channels and Bridge Structure).
Package # 4: Building Works (FM Approved Seemlock System PEB Structure for Rescue Hange C. Area 21,500 Sft, Fazaia College C. Area 123,000 and Flight Line Building).
Package # 5&6: Building Works (Officer's Mess, Officer's Flats, Airmen's Flats, Jamia Masjid and Defense Related Buildings).
Package # 7: Karachi Shipyard & Engineerin Works Building (PEB Shed weight 1387 Ton and Defense Related Buildings)
Package # 8: Karachi Shipyard & Engineering Works Main Store Extension
Responsibilities:
• Interim Payment Certificates
• Variation Orders Preparation and Extra Items Rate Analysis
• Reconciliation Reports (Material & Labor)
• Bar Bending Schedules
• Checking & Verification of Sub Contractor Bills
• Internal Financial Reporting to Head Office
• Drawings Site Coordination
Experience as Site Supervisor
Potential Engineering PVT LTD, Pakistan
01 October 2014
20 February 2016
Survey Works (Building and Infrastructure)
• Supervision of Building works
Matric 01 June 2011
ScienceIntermediate 01 July 2014
3 Year Diploma of associate Engineer