KURALARASAN SOLAIMALAI
QA/QC WELDING INSPECTOR
ABU DHABI
Summary of Career
Experience as
05 March 2016
19 February 2018
? Inspection of final weld quality for Visual Defects, weld face and root appearance, reporting the welded joints at Fabrication Shop.
? Inspection and verification of instrument and Equipment orientation, prior to start full penetration welding.
? Raw material inspection : Visual, dimension, verification of correctness, identification and correlation with manufacturer’s test certificate
? Inspection of weld edge preparation as per approved drawings, fit-up, preheating.
? Coordinate with clients and subcontractor representatives on daily basis to resolve any quality problems or issues.
? Analyzing & maintaining welder performance records.
? Weld Visual and Evaluation of welder performance with statistics report.
? Monitor and carry out day to day fabrication and inspection activities on welding
? Witnessing of subcontractor welder qualification test and evaluation of test results
? Inspection of welding before, during and after welding
? Execution of inspection at various stage of construction as per ITP
? Checking Specification compliance and compliance with Approved drawing
?
? Ensure the rotating equipment inspection auxiliary piping, conduit, instruments, coolers , seal pot consoles shall be mounted separately from the machine & driver. These items do not interfere with the removal of the machine or driver with access to the machinery for normal operation &maintenance.
? Ensure before pipe connection pipe flange face serrations are free from damage and meting to the standard of B16.5 Table3
? Surveillance and checking the site for the conformity of works as per specifications
? Raising the non-conformance if any violations/deviations found with reference to specification and procedures.
? Follow up inspections to implement the corrective actions.
? Ensure to avoid the reoccurrence of violations and implementation of preventive actions.
? Responsibilities include monitoring and inspection of rotary &static equipment’s.
? Ensuring the works are performed in accordance with the specification procedures, inspection and test plan procedures
Bachelor 09 September 2009
MECHANICAL ENGINEERING