Summary of Career
1. Over 10 years of demonstrated experience in quantity surveying, cost estimation, and project documentation, primarily in infrastructure and hydropower projects.
2. Currently working with National Development Consultants (NDC) on the World Bank-funded Dasu Hydropower Project, handling interim payments, quantity verification, and contractual support.
3. Collaborated with a Joint Venture of international firms (Nippon Koi, Dolsar, PES, DMC, and NDC)—indicating strong exposure to multinational project environments.
4. Skilled in preparing and issuing Interim Payment Certificates (IPCs), quantity justifications, and rate analysis for scheduled and non-scheduled items.
5. Proficient in on-site quantity verification, AFIs (Available for Inspection) updates, and validation against contractor submissions.
6. Well-versed in engineering documentation, variation orders, technical reports, and maintaining project records for audits and client reviews.
7. Competent in AutoCAD 2D, Planswift, and Microsoft Office tools, enabling clear documentation, drafting, and quantity take-offs.
8. Recognized for teamwork, collaboration with engineers and site teams, and effectively communicating with subcontractors and project stakeholders.
9. Proficiant in both Pre-contract (Estimation) and Post-Contract (Billing)
10. Proficient in Price Escalation
Experience as Sr. Quantity Engineer
National development Consultants (private) limited
18 January 2023
To date
Project: Dasu Hydropower Project (World Bank Funded), (JV of Nippon koi, Dolser, PES, DMC & Ndc)
• Responsible for complete working and issuance of interim payment certificates IPCs and the justification letter.
• The justifications and confirmation of payment items numbers as per contract measurement and payment clauses.
• The concept and confirmation of provisional payments of those items, which are not the part of BOQ till finalization of VOs.
• Perform Rate Analysis and Assessment of Non-Schedules Items.
• Verifying the monthly Work done submitted by contractor according to drawings.
• Provide assistance to Foreign Experts in Variation Order Assessment and Finalization.
• Verifying of As Build Drawings Quantities.
• Updating AFIs Records with ID and Dates corresponding to the Monthly Payment.
• Updating Measurement Sheets in relation to monthly AFIs Chainage wise coverage for IPCs.
• Verification of Quantities as Per Site/Actual Execution.
• Jointly Working With the Contract Section in Time and Cost Claims on the Behalf of Section.
• Monitoring the daily progress report of work for verification of contractor submitted record.
• Monitoring the daily manpower and equipment record to verify the contractor submitted record.
• Monitoring the explosive record for verification of contractor submitted record.
• Preparing daily activities report and cycle time record of section’s structures.
Experience as Quantity & Estimation Engineer
Saba Associates
28 October 2020
15 December 2022
• Worked on rate analysis for both Boq as well as non0boq items.
• Prepared IPC of projects on monthly basis.
• Prepared detailed cost estimate of the project.
• Prepared tender documents and bill of quantities of the project.
• Reduced estimation errors by conducting thorough reviews and revisions of project scopes and specifications.
• Developed long-term relationships with suppliers, securing favorable pricing agreements that benefited both parties.
• Procured or agree the services of contractors and subcontractors for the project.
• Measured and valued the work done on site.
• Reviewed the bills of subcontractors as per site execution.
• Calculated the materials from drawings for quotation.
• Managed site visits to check progress and execution of work if required
• Prepared the bar-bending schedule to calculate steel.
• Liaised with the client and other construction professionals, such as site managers, project managers and site engineers.
Experience as Estimation Engineer/Quantity Surveyor
Sundas Builders
24 July 2016
31 July 2020
• Worked on rate analysis for both Boq as well as non0boq items.
• Prepared IPC of projects on monthly basis.
• Prepared detailed cost estimate of the project.
• Prepared tender documents and bill of quantities of the project.
• Reduced estimation errors by conducting thorough reviews and revisions of project scopes and specifications.
• Developed long-term relationships with suppliers, securing favorable pricing agreements that benefited both parties.
• Procured or agree the services of contractors and subcontractors for the project.
• Measured and valued the work done on site.
• Reviewed the bills of subcontractors as per site execution.
• Calculated the materials from drawings for quotation.
• Site visits to check progress and execution of work if required.
• Prepared the bar-bending schedule to calculate steel.
• Liaised with the client and other construction professionals, such as site managers, project managers and site engineers.
Experience as Site Engineer
Al Khoos General Maintenance and Contonstruction
25 November 2015
18 June 2016
• Executed the work according to drawings and specifications.
• Prepared the IPC of the executed work.
• Prepared the bar bending schedule of structure’s components as required.
• Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.
• Recorded daily events and activities in site diary to evaluate process and improve productivity.
• Ensured project completion in timely manner.
Experience as Site Engineer
Sundas Builders
21 August 2014
16 September 2015
• Executed the work according to drawings and specifications.
• Assist in preparing the IPC of the executed work on monthly basis.
• Prepared the bar bending schedule of structure’s components as required.
• Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.
• Recorded daily events and activities in site diary to evaluate process and improve productivity.
• Prepared the sub-contractor bills as per site execution.
• Ensured the quality control of materials at site.
• Measured the quantity of material provided by suppliers.
• Co-ordinated with client and sub-contractor.
• Prepared and maintained executed project cost estimation as needed.
• Ensured project completion in timely manner.
Matric 01 August 2008
SSC, Science BISE Sargodha, Pakistan Percentage: 88%Intermediate 04 September 2010
HSSC, Pre-Engineering BISE Sargodha, Pakistan Percentage: 84.454%Bachelor 10 July 2014
B.Sc., Civil Engineering UET Taxila, Pakistan CGPA: 3.61