Humair Ahmed

Piping supervisor
Fujairah


Profile Views 93

Recommendations (0)
Last Seen: 16 November 2020 6:08 PM

Skills
 Auto-CAD  Microsoft Office Suite  Manpower allocation/handling  Iso-metric & P&ID understanding  Piping & Structure  Communication Skills  Inter-person skills  Technical Report Writing  Pressure Handling  Safety at construction sites  Well-ver
  • Experience
    5 Years
  • U.A.E Experience
    4 Years
  • Industry
    Oil , Gas & Energy
  • Nationality
    Pakistani
  • Visa status
    Employment Visa in UAE
  • Qualification
    Other - D.A.E. Civil Engineering. 2015 Govt. College of Technology, Sialkot. (Punjab Board of Technical Education) 3-Year Diploma in Civil Engineering with 'A' Grade.
  • Driving License:
Other Matching Titles/Position
Piping Supervisor
Piping Supervisor
Piping Supervisor
Site Supervisor
Industry Titles
Oil , Gas & Energy

Summary of Career

1. Deploy crews on different tasks in accordance with weekly and monthly plan.


2. Explaining tasks to general foreman as per I.F.C Drawings and giving targets to general foreman.


3. Monitoring and coordinating installation of weekly quotas of piping, steel preassembly/erection and mechanical equipment’s.


4. Ensure implementation and compliance of project safety procedures within areas of responsibilities including my own.


5. My direct reports involvement in various weekly safety walk downs, pre-start participation, JHA and start card reviews to ensure hazards are identified and controlled.


6. Other responsibilities include permit co-ordination on daily basis with client.


7. Manpower handeling


8. Prepare daily progress report.


9. Materials handeling


10. Work always with safety


Work Experience (Employment History)

Experience as Piping Supervisor

  • Employer

  • From

    01 July 2018

  • To

    To date

  • Detail

    Major responsibilities are to deploy crews on different tasks in accordance with weekly and monthly plan. Explaining tasks to general foreman as per I.F.C Drawings and giving targets to general foreman. Monitoring and coordinating installation of weekly quotas of piping, steel preassembly/erection and mechanical equipment’s. Other responsibilities ensure implementation and compliance of project safety procedures within areas of responsibilities including my own and also my direct reports involvement in various weekly safety walk downs, pre-start participation, JHA and start card reviews to ensure hazards are identified and controlled. Other responsibilities include permit co-ordination on daily basis with client (Total & CBI) to get construction work started.

Experience as Site Supervisor (piping)

  • Employer

  • From

    01 December 2016

  • To

    30 June 2018

  • Detail

    Major responsibilities were managing a subcontractor with a multicultural workforce in six of the projects facilities. These facilities include 73km of large and small-bore piping, 8500t of structural steel erection and various tank agitators, pumps and vessels. Monitoring and coordinating installation of weekly quotas of bulk piping, steel preassembly/erection and mechanical equipment’s. Managed and coordinated the two project SMPT heavy transport machines which were used to transport large tanks, vessels and pre-assembled steel structures from assembly yards to work fronts. Ensure implementation and compliance of project safety procedures within areas of responsibilities including my own and also my direct reports involvement in various weekly safety walk downs, pre-start participation, JHA and start card reviews to ensure hazards are identified and controlled as well as supporting project safety campaigns. Other responsibilities include permit co-ordination on daily basis with client (Bechtel & Petrofac Joint Venture, BPJV) to get construction work started.

Experience as Site Supervisor (piping)

  • Employer

  • From

    01 May 2016

  • To

    30 November 2016

  • Detail

    Major responsibilities were to deploy crews on different tasks in accordance with weekly and monthly plan. Explaining tasks to general foreman as per I.F.C Drawings and giving targets to general foreman. Other responsibilities include maintain daily progress report.

Experience as Site Supervisor

  • Employer

  • From

    25 March 2015

  • To

    02 April 2016

  • Detail

    Major responsibilities were to supervise the construction work as per I.F.C Drawings and giving targets to general foreman for piping works according to planed schedule. Other responsibilities included preparing BOM for any as-built drawings and coordinating with procurement department and my job was not limited to this but, water distribution plant construction and supply line construction also.

Academic Qualification

Matric 01 July 2012

Matriculation (Higher Secondary Education) 2012 Govt. High School Shahzada, Sialkot.

Other 01 August 2015

D.A.E. Civil Engineering. 2015 Govt. College of Technology, Sialkot. (Punjab Board of Technical Education) 3-Year Diploma in Civil Engineering with 'A' Grade.
Certifications
Recommend Humair Ahmed
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Instrumentation and Control Engineer
Current City: Jubail

Profession: Senior Technician Mechanical
Current City: Karachi

Profession: Operator
Current City: abu dhabi

Profession: Lawyer
Current City: Hannover, Germany

Profession: floorman
Current City: rawalpindi

Profession: QA/QC Electrical and Instrumentation
Current City: Abu Dhabi