Muhammad Atif Munir

Engineer
ISLAMABAD


Profile Views 172

Recommendations (0)

Skills
Expert user of MS Office & Utilities MS Project AutoCAD 2002 Maximo ISO 9001:2015 QMS
  • Experience
    11 Years
  • U.A.E Experience
    --
  • Industry
    Oil , Gas & Energy
  • Nationality
    PAKISTANI
  • Visa status
    Not Applicable
  • Qualification
    Bachelor - BSC ELECTRICAL ENGINEERING
  • Driving License: YES
Other Matching Titles/Position
Industry Titles
Oil , Gas & Energy

Summary of Career

1. Installation of new equipment in existing plant aimed at process optimization and variation


2. Design modification at site


3. Review of project documents


4. Material BOQs preparation


5. E&I material procurement for different projects


6. Technical evaluations of material


7. Material reconciliation from Contractor


8. Interfacing with vendor technical teams for the solution of discrepancies in different equipment/material


9. Inspection/testing/simulation of procured Electrical material


10. Inspection/testing/simulation of procured Instrumentation material


Work Experience (Employment History)

Experience as Shift Engineer

  • Employer

  • From

    15 January 2009

  • To

    09 February 2011

  • Detail

    Worked as Shift Engineer at Hashir Textiles (Pvt.) Ltd on Gas & Diesel engines. It is 50MW project of Orient Energy Systems. This is latest technology engines generators installed
    at this Power Plant.
    ? Take over charge of the power plant from his counterpart of outgoing shift.
    ? Supervise the plant during complete shift hours for safe, efficient and smooth operation taking care of load demand, according to OEM recommendations.
    ? Manage Personnel & technical management for smooth, trouble free operation of plant.
    ? Analyze the fault from the history of machine data and to minimize deprecation of plant.
    ? Handle emergency condition in case of machine breakdown.
    ? Manage maintenance team work and assure QHSE standard scope of work.

Experience as QA/QC Engineer E & I

  • Employer

  • From

    10 February 2011

  • To

    15 March 2013

  • Detail

    Previously, worked at UCH Power Limited (UPL) adjacent 404MW expansion Power project with Hyundai Engineering. Been part of Quality Assurance and Control (QA/QC) department for Electrical & Instrumentation Scope. I am quite familiar with Project Management, Project Quality Plan and Engineering controls, Construction and Procurement activities during different phases of project. ? Carried out all inspection and testing requirements of the UCH-II Power Project at all stages as per approved method statements and E&I Specifications.
    ? Assisted in the initial assessment of the Contractor’s Project Quality Plan (PQP), Request for inspection and testing (RIT’s) & control procedures as they relate to this specific E&I discipline.
    ? Responsible for monitoring of Contractor to ensure the resolution of Preventive Action request (PAR), Non Conformance Report (NCR) and Corrective Action request (CAR) within specified time which is raised for compliance of quality works.
    ? Progress reporting of QA/QC works to Manager.
    ? Carried out surveillance and witness inspections of ongoing E&I installations.
    ? Implement Integrated Management System (IMS) in my area of responsibilities.
    ? Responsible for schematic drawings interpretation & manipulation accordingly.
    ? Preventive maintenance & asset management of power plant.

Experience as Senior Electrical & Instrument Engineer

  • Employer

  • From

    26 March 2013

  • To

    17 December 2019

  • Detail

    Currently, working as Senior Engineer Electrical & Instrument in Projects & Facilities Engineering department at MOL Oil & Gas Pvt. Ltd (Pakistan) through BUERAU VERITAS Pvt. Ltd which is the fastest growing Exploration & Production (E&P) Company in Europe. As a member of the Projects and Facilities Engineering Team, the responsibilities include Working and Leading of different ongoing projects mainly construction of Gas Processing Facility (LPG plant) , Tolanj Early Processing Facility (TPF), Well Head Surface Facilities, Valve Assemblies, installation of new equipment in existing plant aimed at process optimization and variation, design modification at site, review of project documents, material BOQs preparation, E&I material procurement for different projects, Technical evaluations of material, material reconciliation from Contractor, interfacing with vendor technical teams for the solution of discrepancies in different equipment, inspection/testing/simulation of procured Electrical & Instrument material.

Academic Qualification

Intermediate 10 June 2004

PRE ENGINEERING

Bachelor 20 December 2008

BSC ELECTRICAL ENGINEERING
Certifications
Recommend Muhammad Atif Munir
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Mechanical Supervisor
Current City: Hubli

Profession: Quality Health Safety & Environment
Current City:

Profession: Project Engineer
Current City: Dubai

Profession: Project Engineer
Current City: Sharjah

Profession: Field Engineer - Turbine Operations
Current City: Hyderabad, Sindh

Profession: Engineer
Current City: Lahore