Salman Akhtar
Electrical engineer
Sharjah
Summary of Career
1. Handling sites
2. Supervision
3. Procurement
4. Manage contractors
5. Manage to work with other departments
6. Prepare reports
7. Assist teams
8. Follow ups on going project with different departments
9. Available on phone calls
10. Management of office equipment
Experience as Electrical engineer
03 September 2017
To date
Responsible for
Manage Maintenance/Engineering team staff including periodic feedback and performance management, leave planning, work plans, update tasks and responsibilities.
Manage the request process for all maintenance works in the field.
Act as the focal point for requests for the improvement of the infrastructure.
Prepare engineering reports by collecting, analyzing and summarizing data and trends, generating reports and presentations and performing calculations.
Maintain and improve the quality of results by completing quality assurance tests, following standards, studying, evaluating and re-designing processes.
Liaise with project partners and coordinate as necessary to meet all site objectives.
Respond to any security incidents by following strict NRC internal Security management procedures and ensuring the safety of staff on site.
Keep supplies ready by inventorying stock, placing orders and verifying receipt.
Overall management of on-site services, as well as provision of tools and safety equipment. Ensure payment requests are completed and processed in a timely manner in line with the project’s work plan and commitments.
Determine engineering requirements by conducting inspections and analytical tests, analyzing and synthesizing data, maintaining control charts, preparing bid specifications.
Maintain project team accomplishments by communicating essential information, coordinating actions, obtaining expert input, reviewing open issues and action items, contributing information to team meetings and reports, escalating project completion impediments.
Enhance engineering and organization’s reputation by accepting owner
Experience as Electrical engineer
Izhar group of companies
06 May 2014
06 June 2017
Conducted site surveys and prepared feasibility reports.
Preparation and verification of BOQ
Drawing study and verification.5
Maintained and reported protocols of preventive measures
Prepared final punch list and its rectification as per standard specification
Implementation of installations and commissioning executions:
Cable Tray and Cable Ladder
Bus Tie Duct System
Life Safety Genet
Energy Management System
Hazards Area Lights
Different Types of Earthling System
Variable Frequency Drives
Fire Retardant Cables
Specialist lighting
Site Testing of Electrical system
LV and MV panels
PFI panels
Security systems
Experience as Electrical engineer
04 April 2012
07 February 2014
Responsible for:
Troubleshooting of CISCO systems
Completed structural designing and installation of security system
Coordinated with control room of multiple cities, operations, planning & other execution departments to improve efficiency of systems.
.
Matric 07 December 2011
Bachelor of technology Electrical