ahmad rizwan
quality control engineer / inspector
Dubai
Summary of Career
1. enusre of Implement procedures according to (MS, ITP, checklists, IR, MIR), drawings, and technical submittals
2. ensure of Material inspection (MAR & MIR) for incoming material. Ensure proper storage of material
3. ensure of stage wise inspection (IRs) from start to finish and follow up for approval
4. Governing the various sites as well as laboratory tests to maintain the strict Quality Control
5. Reporting to management and conduct internal quality meeting and attend client quality meeting
6. Raising & Report (NCR &CAR) to related material or workmanship, and monitor action until closeout
7. Ensure tool box talk conducted prior to start activity to avoid any rejection and proper workmanship.
8. Follow up and & preparation of final hand over documents(SNAG,DESNAG, PUNCHLIST) and submission of quality related documents
9. Conduct internal Audits to ensure continuous compliance with the contractual & ISO requirements
10. Ensure that the daily site reports, weekly monthly report and test results are recorded and all technical documents relative to site quality control are up to date and submitted to client
Experience as site engineer
15 May 2005
15 March 2008
Execution of works with approved drawings
Effective Coordination with the Sub contractors
Continuous supervision of Works to obtain Maximum Productivity
Achieving Targets given by the project manager
Efficient Usage of materials, tools and equipment available
Pre planning of the consequent activities which is to be performed on next day
Maintaining quality in the works involved
Requirement of safety in works proceeding
Timely Delivery of materials to the sub-contractors to avoid delays
Awareness of MEP Services in every stages of Works
Experience as quality supervisor
Bauer Abu Dhabi UAE
16 May 2008
15 March 2010
as above
Experience as senior level quality control engineer
15 May 2010
15 April 2018
as above
Experience as senior level quality control engineer
15 May 2015
15 March 2018
as above
Experience as senior level quality control engineer
15 May 2018
To date
Monitor the implementation of approved Project Quality Plan and coordinate with all Project Team on all quality issues and ensure that the quality related site activities
Review IFC drawing, specs, shop drawing with MEP drawings
Prepare and Implement procedures(MS, ITP, checklists, IR, MIR), drawings, and technical submittals,
Submission and assurance of stage wise inspection (IRs) from start to finish and follow up for approval
Give direct guidance to the project engineer with regard to daily in-house inspection
Completion of necessary documentation to verify the work Performed.
Submission and raise inspection (MAR & MIR) for incoming material. Ensure proper storage of material
Liaise with third party/ client inspection on witness of site inspection, and approval
Governing the various sites as well as laboratory tests to maintain the strict Quality Control
Raising & Report (NCR &CAR) to related material or workmanship, and monitor action until closeout
Analyze non-conformances and preventive actions implemented at site
Monitoring and reporting project metrics to the management
Attend client quality meeting and discussed quality matters, follow up and solutions
Coordinate with site team and provide guidance for implementations of site inspection and control
Confirm and analyze that the installer’s / subcontractors quality control procedures are carried out
Submitting Measuring score card and KPI’s. MBO
Reporting to management and conduct internal quality meeting
Maintain all quality records in a retrievable manner.
Ensure that the daily site reports, weekly monthly report and test results are recorded and all technical documents relative to site quality control are up to date and submitted to client
Ensuring latest and proper controlled documents and drawing, procedures are being used at site
Ensure tool box talk conducted prior to start activity to avoid any rejection and proper workmanship.
Conduct internal Audits to ensure continuous compliance with the contractual & ISO requirements
Follow up and & preparation of final hand over documents(SNAG,DESNAG, PUNCHLIST) and submission of quality related documents
Bachelor 15 September 2011
civil engineering and technologyOther 15 September 2000
Diploma of associate engineering and technology civil