Muhammad Nadeem
(Active Recruiter)

Experienced
Dubai


Profile Views 225

Recommendations (0)
Last Seen: 13 February 2021 8:35 PM

Skills
Power plant Experience Oil and Gas Experience Electrical panel Installation Operation and Maintenance Experience Offshore project oil and Gas Experience Substation Project Experience
  • Experience
    More than 15 Years
  • U.A.E Experience
    2 Years
  • Industry
    Oil , Gas & Energy
  • Nationality
    Pakistani
  • Visa status
    Employment Visa in UAE
  • Qualification
    Intermediate - DAE Electrical Three Year Diploma
  • Driving License: No
Other Matching Titles/Position
Electrical Supervisor
Electrical Forman
Power Plant Technician
Electrical Technician
Others
Industry Titles
Oil , Gas & Energy

Summary of Career

1. Electrical supervisor


2. Electrical Forman


3. Electrical Technician


4. Power Plant Operator


5. Shift Supervisor


6. Operator


7. Trouble shooting


8. Installation


9. Erection


10. Diesel generator services


Achievements
Technical

Hand on Experience in Installation and Operation Maintenance


Work Experience (Employment History)

Experience as CRO Control Room Operator

  • Employer

    AM Group of Industries(pvt) Limited, Lahore

  • From

    11 November 2002

  • To

    10 November 2004

  • Detail

    AM Tex Spinning Energy Plant:
    Worked as a C.R.O from Nov2002 to Nov2004.
    6x1 MW Jenbacher Gas Engine JGS320 V type Alternator Stamford
    PLC control system inParallel operation Cooling Tower Cooled.
    1x1 MW Caterpillar Diesel Engine D3512 V type Radiator Cooled.
    Responsibilities:
    To maintain the load, auxiliaries and system.
    Troubleshoot of diesel & gas Generator,s and power panel issue.
    Maintenance of LT/HT Panel, LV/MV Switch Gear Panel,
    Maintenance of Diesel & Gas Generator,
    Maintain Record Of Preventive and Corrective Maintenance
    Maintenance of Exhaust fan motor’s, Cooling Tower Fan Motors
    Make Daily Generation and Consumption Report,

Experience as Electrical Supervisor

  • Employer

  • From

    11 November 2004

  • To

    31 January 2005

  • Detail

    BB Jaan Fiber pvt Ltd
    3x1 MW Caterpillar Gas Engine 3516A V type PLC control system
    Parallel operation Cooling Tower Cooled.
    2x1 MW Caterpillar Diesel Engine D3512 V type Radiator Cooled.
    Responsibilities:
    To maintained Electrical auxiliaries,cooling tower and Load variation
    Fault finding in diesel & gas generators, LT & Synchronize panel.
    Maintenance Of Cooling Tower Fan Motor’s, Water Circulation Pumps motor’s.
    Maintained Its Load and Maintenance Data Sheet,

Experience as Electrical Supervisor

  • Employer

    Interloop limited

  • From

    02 February 2005

  • To

    10 April 2008

  • Detail

    x1 MW Jenbacher Gas Engine JGS 320 PLC control systemcooling Tower Cooled.
    2x1 MW Cummins Diesel Engine Kta50 V type Radiator Cooled
    1x500Kva Cummins Diesel Engine Kta19 V type Radiator Cooled.
    1x300Kva, 210Kva Siemens Diesel Engine IFJ6354-4 Inline
    Alternator Siemens Radiator Cooled.

    Responsibilities:
    Responsible for effective development, implementation, installing and maintaining power house equipment
    Participate in Asset care (preventive and predictive maintenance) of all Generator Equipment and HT/LT switch gears available
    Ensure building and facility is maintained according to standard
    Attempts all possible means of reducing equipment downtime, prevent shutdowns, performs troubleshooting activities as necessary
    Troubleshoot & fault finding of diesel and gas generators’
    Troubleshoot & fault finding of LT & Power Panel.
    To maintained the Electrical system & check the Load calculation,
    Maintenance of Water Circulation, Exhaust Fan Motor’s and Cooling Tower fan Motor’s
    Maintained The Power House Utility & Generation Consumption Record,
    Manage The Load On LT Panel and Bus Bars
    Preventive& Corrective Maintenance Record,

Experience as Sr. Electrical Technician

  • Employer

    MobiServe Pakistan Limited M.P.L

  • From

    01 September 2009

  • To

    31 March 2015

  • Detail

    Mobilink Project in O&M department on BTS/BSC/MGW sites
    Responsibilities:
    Control and Manage the Team, Documentation & presentation of activities
    Performed. Escalation& Rectification of issues using expedient approach.
    Managing the team & assigning the tasks to each team member.
    Managing & documenting the spare parts, tools and junk material
    Check the batteries Load & fault finding of Power cube.
    Informed to Wapda SDO, XEN about wapda Issues Daily Basis and Monthly Basis,
    Fault finding of Rectifier’s Batteries (ACB&FCB)
    Emerson 3600, 1800, Eltek 1500, Delta 2000, 1200, Power Cube1000
    Diagnosis of major and minor faults as below Diesel Generator,s
    ATS panel & distribution panel.
    Installation and Commissioning of Different types Diesel Generator,s
    (Johndeere31Kva, Perkin’s 400Kva, 150Kva , 20Kva, 09Kva, Olympian 27Kva,
    FG Wilson Engine Perkin & Alternator FG Wilson, Cummins QSK15,
    Maintenance & Trouble shooting of Diesel Generator,s, ATS Panel, Distribution
    Panel, Rectifiers, UPS & AVR,
    Trouble Shooting of Link system of Dishes and Antenna, 3G & 4G System Card,

Experience as Supervisor power Generation and Electrical Operation

  • Employer

    MAS Associates (Pvt.) Ltd.

  • From

    01 April 2015

  • To

    14 October 2019

  • Detail

    worked in Mas Group Hi-Tech Lubricant Oil & Gas Plant(ZIC OIL)
    Supervisor Power Generation&Electrical Operation from April2015 to October 2019
    Power Plant Capacity2MW 3x 810Kva Caterpillar Diesel Engine D3412C,
    Radiator Cooled System and Three Generator,s Operation in Parallel Mode on auto.
    Synchronization System of Enercon.
    All Generators Operation on Parallel and shut down one by one as per Load adjustment.

    Erection HI-Tech Lubricant Oil &Gas Plant:
    Hand on experience complete Installation Including Cable Tray & Cables Laying, Erection & Commissioning of Power Plant (Diesel Generators),
    LT&HT Panel Installation, Cable Termination, Synchronization panel(ENERCON ), Transformer& Lighting DB,s Installation and Cable Termination,
    Boiler, Chillers, Atlas Copco Compressor, EBM Machines, IMM Machines Installation
    And Commissioning,
    HVAC Sys, Fire Alarm&CCTV Camera, Filling Machine Installation and Commissioning
    Electrification of Power Plant, MCC Panel, LDB,S and Distribution Panel,
    Installation and Commissioning of Base Oil, Additive Tank & Blending Kettle,
    Installation and Commissioning of Oil Transfer Pumps, Furnace & HSD Pumps
    Motors,
    Installation of Level Switch, Temperature Control Valve, Level Transmitter Switch and Desk top system of Blending Plant,
    Installation & Commissioning of Fire water Pumps, & Motor’s.
    Other System. Related to Oil Process,
    Installation & Commissioning of pneumatic Positioner Valve.
    Installation & Commissioning of Agitator Motor & Fans for Blending Kettles,

    Responsibilities:
    To Maintain all Electrical Load on L.T Panel, HT Panel and Bus bar.
    Prepare daily Power Generation & Consumption report of utility and Generation,
    Responsibility of Complete Plant Electrification & manage the Future Electrical Plane,
    Trouble shoots of Chillers, Compressor, Boiler, EBMMachines, Diesel Generator,s
    Troubles shoot of Electrical Fault in ATS, LT&HT Panel, Genset & Synchronize Panel,
    Maintenance of VCB, ACB, Motor’s, Machines, Generator,s,
    Fault finding in Power and Control Circuit, UPS & AVR.
    Earthing System at Site Project,
    Fault Finding of Level Switch, Level Transmitter Switches and Temperature Control Valve.
    Installation, Maintenance and Trouble shooting of Pneumatic Positioner Valve & Agitator Motors,
    Maintenance and Trouble shoot of MV, LT Switch Gear and Motor Control Circuit,
    Maintenance & Trouble shoot of Diesel Generators’ 810Kva,33Kva,30Kva,

Experience as Electrical Technician

  • Employer

    Drydocks World Dubai

  • From

    15 November 2019

  • To

    To date

  • Detail

    DRY DOCKS WORLD DUBAI:
    Currently I m Working in Dry Docks World Dubai as a Electrical Technician from
    16Nov2019 to Present.
    Working on JOHAN CAST BERG (Turret Mooring System) Offshore Project Oil&Gas
    Installation & Cable Termination Of all Instruments (LT, LST, PT, PST, TST, Actuator
    Fire & Gas Detector, Smoke Detector, Space Heater, Thermocouple and Other Electrical
    Equipment.
    Installation and Termination of Lighting, Transformer, ACB & Motors,
    Also working in Commissioning Department checked Continuity, Maggering and Loop
    Checking of Cable and Equipment.
    Also working on cable tray and Laying of cable
    Installation of DB and instruments.

Academic Qualification

Intermediate 08 August 2002

DAE Electrical Three Year Diploma
Certifications
Recommend Muhammad Nadeem
Related UserList of Members
Mentor
Hafiz Saad Mudassar

Electrical Engineer
Sahiwal

Last Login: 14 April 2021 3:34 AM
Profile Answers
Related Professionals
Profession:
Current City: Dubai

Profession: Surface Well Testing Chief Operator - Asset Management Leader
Current City: Malang

Profession: engineer
Current City: Lahore

Profession: Sales & Business Development (Digitalization & Automation)
Current City: Dubai

Profession: Production Operator
Current City: Mumbai

Profession: Electrical Forman
Current City: Doha Qatar