Adnan Qadeer
(Job Seeker - Active)
B.Sc Chemical Engineer
Lahore
Summary of Career
1. Prepare and maintained monthly progress, operational and consumption reports including variable and capex cost reports
2. Prepare, review and finalized the annual shutdown plan with plant managers.
3. Coordinate with plant managers to discuss and resolve the site issues like monthly reports, monthly cost, inventory status and other site activities.
4. Ensure the availability of required spare parts, consumables, fuels, tools and any other material required to perform day to day and periodic/shutdown jobs at site.
5. Review and finalized the shutdown material list as prepared by site team.
6. Review daily plant operational parameter reports.
7. Arrange third party to conduct the relevant testing of plant equipment during shutdown
8. To present monthly site reports KPIs to higher management.
9. Maintain overall inventory control status.
10. Responsible for maintained and keep the management site operational reports.
Experience as PROJECT PLANNING ENGINEER
01 August 2007
28 February 2010
• CLIENT: EngroFertilizer Limited
• PROJECT: enven 1.3(The World’s Largest Single Train Urea plant – 3,835 T/day Urea Capacity) at Contractor side
ROLE AND RESPONSIBILTIES:
• Planning and scheduling of mechanical construction, installation of equipment and all piping jobs of assigned utility area in primavera P3.
• Resource loading in P3 plan against each activity on standard productivity norms.
• Prepared a progress monitoring reports and generate progress “S” Curves percentage in accordance with planned and actual works and also represent MPW Histograms.
• Coordinated with site engineers to execute the activities as per planned schedule.
• Planned and monitored above and underground piping according to isometric drawing including fabrication, sandblasting, insulation, hydro-testing and erection.
• Monitoring of test pack preparation of utilities area before hydro testing of under and above ground piping.
• Monitoring and kill all punch list point of respective area.
• Completed studying and understanding of all piping drawings including piping isometrics, piping layouts, P&ID’s, Key plans, plot plans.
• Directed interaction with client regarding clarifications/revision of drawings, material issues, routine inspection, progress and meeting etc.
• Planned and executed NDT activities like UT, RT, DPT and MPT of piping joints.
• Overall responsible for the organization and smooth execution of the assigned project as per quality standards and delivery schedule committed with the Client.
Experience as PROJECT PLANNING COORDINATOR (BOILER PROJECTS DEPARTMENT)
01 March 2010
31 August 2013
Major Boiler Projects: Fire Tube Boiler, Water Tube Boiler, HRSG, Sugar Boiler including Engineering, Procurement, Fabrication, Erection & Commissioning.
ROLE AND RESPONSIBILITIES:
• Working as a Project & SAP coordinator (PS) module.
• Prepare a level three plan of all boiler projects with the coordination of project leaders in primavera P6.
• Prepare and transferring a budget of all existing boiler project in SAP for indenting of raw materials and invoicing.
• Prepare a latest forecast cost plan of all boiler projects on quarter base like direct raw materials, labor, sub-contracting, erection and commissioning.
• Prepare a monthly progress reports (KPI) of all existing boiler projects.
• Prepare financial package of all boiler project and also making an invoice plan with the coordination of project leaders.
• Monitor all boiler projects cost like labor, materials sub-contracting, consumables and other manufacturing expenses on monthly basis in SAP.
• Raise an invoice to client as per contract miles stone requirement with the coordination of project leaders.
• Coordinate with design department for the issuance of fabrication drawings on timely.
• Prepare a procurement status of all boiler projects with the coordination of project leaders.
• Involves in all projects review meeting with fabrication, design and procurement, finance department and erection and commissioning department.
• Responsible for the completion of all documentation.
DESIGNATION: LEAD PROJECT PLANNING ENGINEER (PRODUCTION DEPARTMENT)
Descon Engineering Limited (Manufacturing Division)
ROLE AND RESPONSIBILTIES:
• Planning and scheduling & managing the assigned piping projects in primavera with existing resources, including sub-contracting.
• Planning and successfully lead the execution of planned activities of assigned projects within the approved schedule/ milestone and budget.
• Prepared a progress monitoring reports and generate progress “S” Curves percentage in accordance with planned and actual works and also represent MPW Histograms.
• Productivity analysis on weekly basis and control of man hours with respect to work progress.
• Issued level-3 & Level-4 plan to shop supervisors for execution and resolving technical issues in regards to execution, manpower and equipment with regards to scope of work.
• Coordinating with Project Leader for receiving project specific documents like drawings, specs, budget, materials procurement plan etc. necessary for job execution within budget and given time schedule.
• Coordinating with Welding Engineer to ensure timely execution of welding procedure and performance qualification tests and troubleshooting potential bottlenecks.
• Coordination with Welding Engineer for receiving welding documents like weld matrix, welding procedure specification (WPS) and welding consumable estimation.
• Coordinating with quality control department, third party representatives and the Client for Inspection of the fabrication activities.
• Estimating consumables and tools to the store for timely arrangement
• Planning and execution of NDT activities like UT, RT, DPT and MPT of piping joints.
• Hand over the final move order of the completed job to project leader for onward shipment to customer and afterward arrange loading/ packing if any.
• Taking Ownership of Company’s Quality and HSE policies, core and operating values and ensuring their implementation.
MAJOR PROJECTS:
Worked as “Project Planning Engineer” for various clients on different projects onsite with prominent projects being
• CLIENT: 225MW CCPP HALMORE BHIKKI
Total Dia Inches 4500 according to ASME B31.1 (CS & Alloy Piping).
• CLIENT:BHP Billiton ZAMZAMA GAS FIELD DADU
Total Dia Inches 34000 according to ASME B31.3 (CS & Duplex Piping).
• CLIENT:PPL (Pakistan Petroleum limited)
Total Dia Inches 3500 according to ASME B31.3 (CS & Duplex Piping).
• CLIENT: OGDCL (Oil and Gas Development Company Limited)
Total Dia Inches 2000 according to ASME B31.3 (CS & SS Piping)
• CLIENT: FFC (Fuji Fertilizer LTD)
Total Dia Inches 2500 according to ASME B31.1& B31. 3(CS & Alloy Piping)
• CLIENT: Bosicor Oil Refinery (BYCO)
Total Dia Inches 2000 according to ASME B31.3 (CS & SS Piping)
• CLIENT: Parco Refinary (Mid Country)
Total Dia Inches 2000 according to ASME B31.3 (CS & SS)
• CLIENT: Gul Ahmed Textile
Total Dia Inches 2000 according to ASME B31. 1(CS Piping)
Experience as LEAD PROJECT PLANNING ENGINEER
01 September 2013
31 May 2015
• CLIENT: ADGAS (Offshore) Das Island Abu Dhabi TA Mar-Apr 2015, TRAIN-1 (Duration: 35 Days)
Major Works: Heat Exchanger, Vess1els, Columns, Valves, Piping.
• CLIENT: QAFAC (Qatar Fuel Additives Company limited) Mesaieed Plant TA 2104, (Duration: 45 days)
Major Works: Heat Exchanger, Vessels, Columns, Heater, Piping.
• CLIENT: ADGAS (Offshore) Das Island Abu Dhabi TA Oct-Nov 2013, TRAIN-3 (Duration: 35 Days)
Major Works: Heat Exchanger, Vessels, Columns, Valves, Piping.
ROLE AND RESPONSIBILTIES:
• Successfully lead and execute the shutdown activities jobs of respective areas.
• Prepare progress monitoring reports of respective area for shutdown activities.
• Monitoring and control shutdowns activities with respect to the approved schedules/milestones and providing S-curves, percentage variance reports in accordance with planned and actual works.
• Present daily manpower figure status to the management in daily progress review meetings and share the same with respective areas.
• Study, review and fully understand job package contents and work scopes within the area.
• Perform job walk /site verification to ensure job packages are fully complete and satisfactory.
• Identify/review require material.
• Identify resource and equipment requirement.
• Working closely with Material Coordinator to ensure all ordered materials are according to specification and delivered on schedule
• To ensure all the task in his area are schedule properly.
• Ensure team members are aware their duties and responsibilities.
• Ensure safety, quality plan, procedures and instruction are fully complied with.
Experience as Sr. Planning Engineer
01 September 2015
• Prepare and maintained monthly progress, operational and consumption reports including variable and capex cost reports.
• Prepare, review and finalized the annual shutdown plan with plant managers.
• Coordinate with plant managers to discuss and resolve the site issues like monthly reports, monthly cost, inventory status and other site activities.
• Ensure the availability of required spare parts, consumables, fuels, tools and any other material required to perform day to day and periodic/shutdown jobs at site.
• Review and finalized the shutdown material list as prepared by site team.
• Review daily plant operational parameter reports.
• Arrange third party to conduct the relevant testing of plant equipment during shutdown.
• To present monthly site reports KPIs to higher management.
• Maintain overall inventory control status.
• Responsible for maintained and keep the management site operational reports.
Matric 15 July 2006
B.Sc. Chemical Eng. (Specialization in Petroleum and Gas