Mohammad Aurangzeb
(Job Seeker - Active)
Rotating equipment engineer Reliability
Bahrain
Summary of Career
1. 10 Years diversified experience, within various legendary industries environments, Including oil & Gas, Thermal power plant, Petrochemical &refinery etc. Testing & commissioning, troubleshoots of rotating equipment’s. Equipment specification/data sheet for rotary machine and package
2. Projected for the (month, Quarter, half year, annual) and report generation according to the requirements of Projects.
3. Predictive and Preventive Maintenance of major rotary equipment’s like Steam Turbines, Gas turbines, Turbo expenders, Pumps, Compressors, Motors, Gear Boxes, Rotary Kilns, ID & FD Fans, Agitator, Chiller, Chlorine compressor, Recycle gas blower & compressor, Boiler feed water pump.
4. Managed Communication with the Client and continuous implementation on change management, knowledge management, integration and interface management, stakeholder management.
5. Planned and prepared Look ahead program (LAP) for the specific period of times for strategy development and operations management.
6. Requisition, Technical Bid Evaluation for rotary machine and package. Vendor documents review/comments and Inspection. Schedule control for issuing all of design documents. Check the design outputs of rotary machine and package such as project specification, data sheet, requisition, TBE report.
7. API, ASME, SEAL PLAN. FAT, SAT, preparing HAZOP reports.
8. Lube Oil Testing & Analysis, Fault Severity Determination, Acceptance Testing, and Proactive maintenance. Handle CSI 2130 & 2140, Bentley Nevada SCOUT 100 & System1, UE 1500 ultrasound.
9. EAM,SAP,EMPAC,PRIMAVERA, PDMS, MSP
10. Create and update records and databases in AMS Health Machinery.
Experience as Rotating Equipment Engineer
15 August 2012
20 November 2013
• Carried out Vibration Measurements of more than 300 Machineries in every month.
• Performed vibration measurement techniques and tests (Bump test, Run up and coast down test).
• Review equipment technical reports and follow up with the maintenance team the correction procedures to achieve reliability for rotating equipment.
• Work experience in troubleshooting, overhauling and repair of all plant rotating equipment’s.
• Acted as technical consultant for planners, maintenance supervisors and operation supervisors in developing methods for maintenance work execution and/or planning such work.
Experience as Rotating Equipment Commissioning Supervisor
11 June 2009
18 July 2012
• Executed gas Turbine Erection & Installation Preparation works for PP12 Combine Cycle Project. Duties include control and monitoring, Installation and alignment of Rotating Equipment such as Turbine, Centrifugal, compressors, Reciprocating compressors, Centrifugal pumps, Blowers, and drivers. Inspect, evaluate and arrange field installation and recommend design modification to eliminate machine or system malfunctions.
• Knowledge and experience in the inspection, performance testing and engineering, pre-commissioning and start-up of rotating equipment’s. Knowledge of International Standards such as ASTM, ANSI, API standards associated with rotating equipment, installation, alignment methods, tolerances and basic engineering practices.
• Check / review vendor documents, P & ID’s, PEFS, ISO drawing, technical specification, engineering drawings and method statements preparation to ensure project execution in accordance with Project requirements .
Experience as Planning Engineer
11 January 2014
22 February 2015
Prepared the project scope statement, work break down structure.
Prepared work progress schedule based on client releases schedule.
Prepared daily progress report both for internal management and for client.
Understand contractual matter. Earned value method, familiar with scope management and change control.
Prepared weekly progress report for progressive invoicing, budgeted manpower, and material consumption and keeping track on overall trend of the project.
Prepared the manpower and equipment histogram for project (weekly/monthly)
Experience as Rotating Equipment Engineer
08 April 2015
25 May 2016
Involved in installation, testing & commissioning, troubleshooting, vibration Analysis-offline and online monitoring of rotating machines.
Peakvue analysis especially for antifriction bearings defects of rotating equipment’s. FFT and Phase Analysis.
Lube oil analysis of rotating equipment using Anton Par, Q1100, and Fluid scan.
Lead & work with others (Operations, Maintenance, Electrical & Instrumentation, Inspections, Technologists, Manufacturer, specialists and Contractors) in search of root cause(s) of RE failures.
Develop and improve RE preventive maintenance policy & strategy by working with reliability engineers employing RCM.
Experience as Condition Monitoring Engineer
14 June 2016
28 December 2016
Offline and online monitoring of rotating machines using CSI 2130. Getting Data from BENTLY NEVADA 3500 online system. Performing vibration measurement techniques and tests (Bump test, Run up and coast down test)
Installation of rotating & static equipment, testing, commissioning, and troubleshoots. Lube oil analysis, responsible for preparing daily, weekly and monthly reports.
Assisting RCM in project implementation Mean Time between Failures (MTBF), Mean Time to Repair (MTTR)
Review Bad actor list of rotating, analyze the problem and provide the recommendation.
Experience as Rotating Equipment Engineer
09 February 2017
17 December 2018
• Managed all the plant maintenance activities including condition monitoring and vibration analysis of rotating equipment’s using Bentley Nevada Scout 100 and its ASCENT v-13.7 software, participating in RCA, and RCFA
• Responsible for the planning and execution of major overhauls on Turbines, Compressors, Pumps and other plant rotating equipment.
• Coordinate with OEM to resolve the problems and enhance the equipment’s reliability.
• Prepare specifications and provide technical recommendations for procurement of major equipment.
• Responsible for preparation of bid packages for major overhauls, pre-qualification of contractors, Scopes of work and parts requirement.
• Provide recommendations on spare requirement, to secure the most reliable operation and economic level of maintenance.
Experience as Sr. Integarated Machinery Inspection
17 February 2018
A Checked the Critical equipment online & offline connected to System1 & AMS Suit software & participating in RCA & troubleshooting of rotating equipment’s and handles the Vibration Measurements & analysis recording by CSI-2140 supporting by AMS Machinery Manager 5.6 software.
Recycle Gas Compressors, Gas Turbines GE frame 5, Steam Turbines, Back Pressure Steam Turbines, Motors, Centrifugal / Reciprocating / High speed Pumps, Centrifugal/Reciprocating Compressors, Blowers, Induces / Forced Draft Fans, Gear Boxes, etc. as company follows predictive maintenance program,UE1500 system.
Prepare vibration severity reports for deteriorating equipment’s, which includes the history, analysis and recommendation which are unacceptable by ISO vibration Severity Standard 10816-3.
Participated in the project implementation Mean Time between Failures (MTBF), Mean Time to Repair (MTTR).
Review Bad actor list of rotating equipment, analyze the problems/issues and provide recommendations. Conduct trouble shooting for any rotating equipment problem to improve the performance and bring equipment back in services.
Bachelor 13 June 2012
Mechanical EngineeringIntermediate 10 June 2009
Diploma in Mechanical engineering