Summary of Career
1. Capacity Building of workers at site
2. Inspection of QA/QC procedures of client/consultant
3. Conduct daily surveillance and civil works inspection in accordance to approved plans and standards
4. Check and monitoring all incoming materials utilization with approvals as per client’s standard
5. Prepare a request for inspection (RFI) and checklist in accordance to approved inspection technical procedures prior to commence of work
6. Preparing Daily Report and Biweekly schedule
7. Quality test reports of materials, concrete and Asphalt mix design reports submitted to Project Engineer for approval of concrete and Asphalt work
8. Review of the specification, approved drawings, quality control documents and work method during the works
9. To calculate quantity of materials as per approved drawings and details
10. Clearing the punch list and preparation of As built drawings
Experience as Civil Engineer
01 December 2010
03 October 2011
• Study project and evaluate the requirement of resources. And utilize project resources as efficiently as possible to conserve on total project budget.
• Prepare work schedule,
• Planning and works execution,
• Coordination and liaison with consultant,
• Getting approval of main elements of the project including materials,
• Selection and coordination with sub-contractors.
• Ensure that works are carried out according to specification and drawings
• Ensure quality control as per Saudi ARAMCO Engineering Standards and Specification
• Supervision for all construction activities including estimating costing for steel and concrete works.
Experience as Civil Site Engineer
07 November 2011
11 November 2014
• Inspection activities on civil works accordance to the approved quality assurance plan
• Inspection of QA/QC procedures of client/consultant.
• Conduct daily surveillance and civil works inspection in accordance to approved plans and standards.
• Check and monitoring all incoming materials utilization with approvals as per client’s standard.
• Prepare a request for inspection (RFI) and checklist in accordance to approved inspection technical procedures prior to commence of work.
• Inspection of concrete as per SEC Engineering standards and specifications.
• Witnessing the backfilling, earth works, concreting and grouting on construction sites.
• Preparing Daily Report and Biweekly schedule
• Inspection and checking of elevations as per approved plans.
• Quality test reports of materials, concrete and Asphalt mix design reports submitted to Project Engineer for approval of concrete and Asphalt work.
• Inspection of concrete before pouring as per required standard.
• Review of the specification, approved drawings, quality control documents and work method during the works.
• To calculate quantity of materials as per approved drawings and details
• Selection and supervising Subcontractor
• Clearing the punch list
• Preparation of As built drawings
Experience as Civil Site Engineer
20 November 2014
10 February 2018
• Inspection activities on civil works accordance to the approved quality assurance plan
• Inspection of QA/QC procedures of client/consultant.
• Conduct daily surveillance and civil works inspection in accordance to approved plans and standards.
• Check and monitoring all incoming materials utilization with approvals as per client’s standard.
• Prepare a request for inspection (RFI) and checklist in accordance to approved inspection technical procedures prior to commence of work.
• Inspection of concrete as per SEC Engineering standards and specifications.
• Witnessing the backfilling, earth works, concreting and grouting on construction sites.
• Preparing Daily Report and Biweekly schedule
• Inspection and checking of elevations as per approved plans.
• Quality test reports of materials, concrete and Asphalt mix design reports submitted to Project Engineer for approval of concrete and Asphalt work.
• Inspection of concrete before pouring as per required standard.
• Review of the specification, approved drawings, quality control documents and work method during the works.
• To calculate quantity of materials as per approved drawings and details
• Selection and supervising Subcontractor
• Clearing the punch list
• Preparation of As built drawings
Experience as Civil Engineer
Socio Engineering Consultant
25 May 2018
28 November 2019
• Orientation to PTC on new construction in Govt Schools ( Class Room, Group latrine & Boundary wall)
• Capacity building of PTC on construction activities
• To provide technical assistance to PTC
• To guide PTC on different construction activities as per approved design
• To assure quality of material & work done and inspect construction activities on different stages of construction during visits to schools
• To assure quantity of work as per BOQ
Bachelor 24 December 2009
B.Tech in Civil Engineering Technology