Sabari Suran S
abu dhabi
Summary of Career
1. Electrical Engineer with more than 8 year experience in MEP industry with Industrial commercial and residential projects in government as well as private sector
2. Primarily focused on implementation of all electrical system in Industrial projects as well as commercial and residential buildings and ensure compliance with contract requirements and authority regulations and specs.
3. Check up all Tender Drawings, BOQ and Specifications
4. Prepare, schedule, coordinate and monitor the assigned engineering projects
5. Submitting the method statement for consultant approval
6. Software exposure Auto CAD Electrical CAD MS Office
7. Overall project coordination for bus bar, lights, fire alarm, BMS, power system installation
8. Submitting the material samples for consultant approval
9. Prepare comparison sheets
10. Interact daily with the clients to interpret their needs and requirements and represent them in the field
Experience as Site engineer
15 June 2011
31 May 2013
Project : 60MW HYDRO ALTERNATOR ERECTION.
Client: K.S.E.B
Role across the tenure:
Ensure the Man power & material arrangements with all suppliers
Overall project coordination for installation of bus bars , cable tray
Overall project coordination for laying of power cables, cable glanding and termination
Overall project coordination for installation of heat exchanger and pipes
Overall project coordination for installation and welding of stator and rotor winding
Conducting thermal test for stator windings
Daily & Weekly Project Reports of projects
Experience as PROJECT ENGINEER
25 July 2013
01 August 2015
Project : ALCOA-MAADEN ALUMINIUM SMELTER MEP MAINTANANCE WORK
Client : ALCOA-MAADEN ALUMINIUM
Role across the tenure:
Arranging safety meeting awareness before starting the work
Overall project coordination for installation of the low voltage panels ,ware house roller
shutter motors,
Overall project coordination for laying of power cables, cable glanding and termination
Overall project coordination for sewage and water pumps installation
Overall project coordination for mechanical valves and pipes installation
Monitoring the site activity as per the progress schedule
Conducting site walk rounds, Inspection and meeting with the client representative
Experience as PROJECT ENGINEER
10 January 2016
08 April 2018
A) Project: MERAAS – THE BEACH POWER UPGRADING WORK
Client: MERAAS
B) Project: DEIRA CITY CENTRE- MEP, UPGRADING WORK
Client : MAJID AL FUTTAIM
Role across the tenure:
Designing the single line diagram for the MCC,SMDB,FDB
Preparing load schedule for the MCC,SMDB,FDB
Forwarding the drawings to the consultant for approval.
Attending the meetings for the site progress with the consultant Engineers.
Overall project coordination for the PUMPS, VALVES ,DB, MDB, Meter Cabinet & ONU
installation
Ensure the complete Installation & testing commissioning of LV, Power, Lighting,
Conducting site walk rounds, Inspection and meeting with the consultant complying
DEWA regulation and the Project specification (Material Submittal, Method statements,
Check list, IR, MIR, Shop drawings, RFI and the Daily & Weekly Project Reports
Commissioning (IR test, Earth resistance Breaker trip test )
Erection and installation of the fire alarm and EML Panels
Ensure the complete Installation & testing commissioning of LV Power, Lighting,
Earthing system,
Conducting site walk rounds, Inspection and meeting with the consultant complying
DEWA regulation and the Project specification (Material Submittal, Method statements,
Check list, IR, MIR, Shop drawings, RFI and the Daily & Weekly Project Reports
Experience as ASSISTANT MANAGER - PROJECT
26 June 2018
31 January 2019
Project: VSERVE
Client: VSAFE
Role across the tenure:
Initiated a maintenance department Electrical safety inspection protocol.
Responded to a wide variety of maintenance requests.
Completed general building repair duties as well as preventative maintenance.
Investigated aging building infrastructure to recommend repair or replacement to
supervisory staff.
Ordered supplies on an as needed basis and recorded them in the inventory as well as
maintained
Ensure all electrical wiring conforms to the latest safety standards.
Supervise maintenance associates on assigned shifts.
Schedule regular maintenance on all electrical equipment.
Experience as PROJECT ENGINEER
10 February 2019
Project: EXPOLINK 20-20 METRO PROJECT
Client: RTA
Role across the tenure:
Prepare, schedule, coordinate and monitor the assigned engineering projects
Check up all Tender Drawings, BOQ and Specifications
Prepare quantity take-off of MDB's, CB's, Final DB's, cables, ELV systems and wire
accessories.
Sending inquiries to subcontractors and suppliers to getting quotations to ensure that only
fair and reasonable pricing is recommended for approval
Prepare comparison sheets
Submitting the material samples for consultant approval.
Submitting the method statement for consultant approval.
Overall project coordination for bus bar, lights, fire alarm, BMS, power system installation
Overall project coordination for AHU, chilled water pipeline, Dampers installation
Overall project coordination for water and drainage pipe line system
Conducting inspection for the site installation with consultant team
Ordering the materials required for the site.
Monitor compliance to applicable codes, practices, QA/QC policies, performance standards
and specifications
Interact daily with the clients to interpret their needs and requirements and represent them in
the field
Perform overall quality control of the work (budget, schedule, plans, personnel’s
performance) and report regularly on project status
Bachelor 10 June 2011