Sabari Suran S


abu dhabi


Profile Views 161

Recommendations (0)
Last Seen: 12 March 2020 9:02 AM

Skills
auto cad ms office ms project
  • Experience
    8 Years
  • U.A.E Experience
    4 Years
  • Industry
    Engineering
  • Nationality
    Indian
  • Visa status
    Employment Visa in UAE
  • Qualification
    Bachelor - Electrical and electronics engineering
  • Driving License: saudi arabia
Other Matching Titles/Position
electrical engineer
project engineer
electrical site engineer
Industry Titles
Engineering

Summary of Career

1. Electrical Engineer with more than 8 year experience in MEP industry with Industrial commercial and residential projects in government as well as private sector


2. Primarily focused on implementation of all electrical system in Industrial projects as well as commercial and residential buildings and ensure compliance with contract requirements and authority regulations and specs.


3. Check up all Tender Drawings, BOQ and Specifications


4. Prepare, schedule, coordinate and monitor the assigned engineering projects


5. Submitting the method statement for consultant approval


6. Software exposure  Auto CAD  Electrical CAD  MS Office


7. Overall project coordination for bus bar, lights, fire alarm, BMS, power system installation


8. Submitting the material samples for consultant approval


9. Prepare comparison sheets


10. Interact daily with the clients to interpret their needs and requirements and represent them in the field


Work Experience (Employment History)

Experience as Site engineer

  • Employer

  • From

    15 June 2011

  • To

    31 May 2013

  • Detail

    Project : 60MW HYDRO ALTERNATOR ERECTION.
    Client: K.S.E.B

    Role across the tenure:
     Ensure the Man power & material arrangements with all suppliers
     Overall project coordination for installation of bus bars , cable tray
     Overall project coordination for laying of power cables, cable glanding and termination
     Overall project coordination for installation of heat exchanger and pipes
     Overall project coordination for installation and welding of stator and rotor winding
     Conducting thermal test for stator windings
     Daily & Weekly Project Reports of projects

Experience as PROJECT ENGINEER

  • Employer

  • From

    25 July 2013

  • To

    01 August 2015

  • Detail

    Project : ALCOA-MAADEN ALUMINIUM SMELTER MEP MAINTANANCE WORK
    Client : ALCOA-MAADEN ALUMINIUM
    Role across the tenure:
     Arranging safety meeting awareness before starting the work
     Overall project coordination for installation of the low voltage panels ,ware house roller
    shutter motors,
     Overall project coordination for laying of power cables, cable glanding and termination
     Overall project coordination for sewage and water pumps installation
     Overall project coordination for mechanical valves and pipes installation
     Monitoring the site activity as per the progress schedule
     Conducting site walk rounds, Inspection and meeting with the client representative

Experience as PROJECT ENGINEER

  • Employer

  • From

    10 January 2016

  • To

    08 April 2018

  • Detail

    A) Project: MERAAS – THE BEACH POWER UPGRADING WORK
    Client: MERAAS

    B) Project: DEIRA CITY CENTRE- MEP, UPGRADING WORK
    Client : MAJID AL FUTTAIM

    Role across the tenure:
     Designing the single line diagram for the MCC,SMDB,FDB
     Preparing load schedule for the MCC,SMDB,FDB
     Forwarding the drawings to the consultant for approval.
     Attending the meetings for the site progress with the consultant Engineers.
     Overall project coordination for the PUMPS, VALVES ,DB, MDB, Meter Cabinet & ONU
    installation
     Ensure the complete Installation & testing commissioning of LV, Power, Lighting,
     Conducting site walk rounds, Inspection and meeting with the consultant complying
    DEWA regulation and the Project specification (Material Submittal, Method statements,
    Check list, IR, MIR, Shop drawings, RFI and the Daily & Weekly Project Reports
     Commissioning (IR test, Earth resistance Breaker trip test )
     Erection and installation of the fire alarm and EML Panels
     Ensure the complete Installation & testing commissioning of LV Power, Lighting,
    Earthing system,
     Conducting site walk rounds, Inspection and meeting with the consultant complying
    DEWA regulation and the Project specification (Material Submittal, Method statements,
    Check list, IR, MIR, Shop drawings, RFI and the Daily & Weekly Project Reports

Experience as ASSISTANT MANAGER - PROJECT

  • Employer

  • From

    26 June 2018

  • To

    31 January 2019

  • Detail

    Project: VSERVE
    Client: VSAFE

    Role across the tenure:
     Initiated a maintenance department Electrical safety inspection protocol.
     Responded to a wide variety of maintenance requests.
     Completed general building repair duties as well as preventative maintenance.
     Investigated aging building infrastructure to recommend repair or replacement to
    supervisory staff.
     Ordered supplies on an as needed basis and recorded them in the inventory as well as
    maintained
     Ensure all electrical wiring conforms to the latest safety standards.
     Supervise maintenance associates on assigned shifts.
     Schedule regular maintenance on all electrical equipment.

Experience as PROJECT ENGINEER

  • Employer

  • From

    10 February 2019

  • To

  • Detail

    Project: EXPOLINK 20-20 METRO PROJECT
    Client: RTA

    Role across the tenure:
     Prepare, schedule, coordinate and monitor the assigned engineering projects
     Check up all Tender Drawings, BOQ and Specifications
     Prepare quantity take-off of MDB's, CB's, Final DB's, cables, ELV systems and wire
    accessories.
     Sending inquiries to subcontractors and suppliers to getting quotations to ensure that only
    fair and reasonable pricing is recommended for approval
     Prepare comparison sheets
     Submitting the material samples for consultant approval.
     Submitting the method statement for consultant approval.
     Overall project coordination for bus bar, lights, fire alarm, BMS, power system installation
     Overall project coordination for AHU, chilled water pipeline, Dampers installation
     Overall project coordination for water and drainage pipe line system
     Conducting inspection for the site installation with consultant team
     Ordering the materials required for the site.
     Monitor compliance to applicable codes, practices, QA/QC policies, performance standards
    and specifications
     Interact daily with the clients to interpret their needs and requirements and represent them in
    the field
     Perform overall quality control of the work (budget, schedule, plans, personnel’s
    performance) and report regularly on project status

Academic Qualification

Bachelor 10 June 2011

Electrical and electronics engineering
Certifications
Recommend Sabari Suran S
Related UserList of Members
Mentor
Muhammad Israr

HSE
Abu Dhabi

Last Login: 27 February 2020 7:13 AM
Profile Answers
Related Professionals
Profession: Mechanical Engineer
Current City:

Profession: Mechanical / Maintenance Engineer
Current City: Dubai

Profession:
Current City: Jhelum

Profession: BSc Electrical Engineer
Current City: Alkhor

Profession:
Current City: 0

Profession: 3D Artist
Current City: 0