Lutufullah
Control Room Operator
Ghotki
Summary of Career
1. Gas Turbines Operations
2. Steam Turbine Operations
3. HRSG Operations
4. Water Treatment Operations
5. Cooling Tower Operations
6. Fuel Gas Stations Operations
7. 500Kv,220Kv,11Kv,6.6Kv,440Volt Breaker Operation
8. Diagnose process problems brought in the notice of Shift engineer mention in log book and prepare detail work requests for rectification through SAP work request system.
9. Responds safety in an manner during process upset conditions especially in trip & blackout condition of the plant and responsible to ensuring actions are carried out in accordance with agreed black out Procedure.
10. Coordination with Load Dispatch Center for Load Variations
on 06 Feb 2017 in FFBL Power Company Karachi Awarded from The president of Pakistan Mr Manoon Hussain to perform Best Efforts of Errection & Commisioning of Powerplant.
Experience as Field Operator
27 July 2010
03 February 2013
OPERATOR SKILL
? Line up, isolation, normalization, priming, start-up, shutdown operation of the plant system.
? Handled system issues from field area & Support to CCR Operator in Case of Trouble shooting Activities & Normal Plant Activities. .
? Good command on flow and process diagrams of power plant system.
? Working of critical conditions such as station blackout, power supply failure, and hazardous material leakage.
? Addition of different types of chemicals by monitoring plant condition and water condition.
? Reading of different API's
.
Experience as Field Supervisor Operation
13 March 2013
14 December 2015
Responds safety in an manner during process upset conditions specially in trip & blackout condition of the plant and responsible to ensuring actions are carried out in accordance with agreed black out Procedure.
Diagnose process problems brought in the notice of Shift engineer mention in log book and prepare detail work requests for rectification through Maximo work request system.
Monitor and operate safely (Gas turbine, Steam Turbine, HRSG, Pretreatment system, Demin plant) through Mark-Vie control HMI & Honey well DCS Operation.
Coordination with National power control center for Load Variations.
Coordination with OGDCL for fuel gas system.
Coordination of other department in case of Maintenance jobs.
Switching of 220kv system for Breaker Operation.
.
Experience as Supervisor Operation
12 January 2016
25 July 2017
Responds safety in an manner during process upset conditions specially in trip & blackout condition of the plant and responsible to ensuring actions are carried out in accordance with agreed black out Procedure.
Diagnose process problems brought in the notice of Shift engineer mention in log book and prepare detail work requests for rectification through Maximo work request system.
My Job Responsibilities is Startup / Shutdown of Following
GE Steam Turbines:
This Section has 02 “GE Thermodyne France” Steam Turbines Rated power (2*24MW) Condensing Steam Turbines & 02 “GE Nevono pignino Italy” Steam Turbines One is Condensing Steam Turbine Rated power (60MW) for supply power to K-Electric & One is Back pressure Steam Turbine Rated Power (10MW) & 200 Ton/hr Steam Flow Supply to FFBL Process Plant.
CIRCULATING FLUDIZIED BED (CFB) BOILER:
This Section has 02 Coal Fired “Hyundai CFB Boiler Korea” Rated Capacity (Flow=2*250 Ton/hr, Pressure=92bar, Temperature=510c)
Coordination with Load Dispatch Center for Load Variations.
Coordination of other department in case of Maintenance jobs.
Switching of 132kv system for Breaker Operation.
Experience as Control Room Operator
25 December 2017
16 July 2018
Responds safety in an manner during process upset conditions specially in trip & blackout condition of the plant and responsible to ensuring actions are carried out in accordance with agreed black out Procedure.
Diagnose process problems brought in the notice of Shift engineer mention in log book and prepare detail work requests for rectification through Maximo work request system.
Start-up & Shutdown of 02 Frame 9HA Gas Turbine 430 MW With Dry Low Nox 2.6+ Combustion System & Generator Having Hydrogen Cooling System.
Startup Shutdown of 02 Alstom High Pressure HRSG (Pressure=178bar Temprature= 585c Flow= 500 Ton/hr).
Startup Shutdown of Alstom Steam Turbine 415 MW Having (HP= 28 stages, IP=17 Stages, LP= 10 Stages) & Generator Having Hydrogen Cooling System.
Switching Of 11KV Breakers For Plant Supply.
Operation Of Cooling Water Pumps Having 3.5 MW Power & Cooling Tower System.
Operation Of Water Treatment Plant Such as Clarifier, RO, Ion Exchange System.
Matric 05 April 2005
Science SubjectsIntermediate 10 May 2007
Pre-Engineering SubjectsBachelor 10 April 2009
Bachelor of Science (Physics,Chemistry,Mathematics)Master 10 January 2012
Master of Arts in English LitreacturesOther 15 September 2015
Diploma of Associate Engineer in Electrical Subjects