Syed Ashraf Ali Rizvi
Mechanical Engineer
Ghotki
Summary of Career
1. Preparing Monthly Schedules of works to be carried out at site.
2. Coordinating with Consultant and Client regarding approval of materials.
3. Proper issuance, checking of direct/indirect/consumables material to their respective item codes and cost center (Materials include Electrodes, Disks cutting & Grinding and Equipment’s).
4. Coordination with subcontractors in Mechanical works.
5. Coordination with subcontractors in Mechanical works.
6. Preparation of daily targets for supervisors.
7. Updating project progress in primavera project planner on daily basis.
8. Preparing Minutes of meeting for weekly meeting with client.
9. Making and Checking of (B.O.Q) & (B.O.M) as per drawing for supply of Equipment’s & Materials.
10. Assist colleagues whenever necessary.
Experience as TRAINEE ENGINEER MECHANICAL
AKC Engineering (Pvt.) Limited
01 January 2018
09 December 2019
Projects:
ANNUAL TURN AROUND OF OGDCL QADIRPUR GAS FIELD.
FABRICATION & INSTALLATION OF CHILLED WATER PIPING.
ANNUAL TURN AROUND OF GTP TNB LIBERTY POWER PLANT QADIRPUR.
Experience as INTERNEE ENGINEER
PAKISTAN ORDINANCE FACTORIES
01 June 2017
30 June 2017
Weapon Factory
Power House
NC Plant at Havellian
Experience as INTERNEE ENGINEER
TNB Liberty Power Limited
01 June 2016
30 July 2016
Power Generation System
Gas Turbine (Brayton cycle)
Steam Turbine (Rankine cycle)
HRSG Heat recovery Steam Generator Gas Treatment Plant (GTP)
Water Treatment Plant
Matric 01 April 2011
SCIENCEIntermediate 01 May 2013
PRE-ENGINEERINGBachelor 12 December 2017
MECHANICAL ENGINEERING