Amer
Structural Engineer
Lahore
Summary of Career
1. Structural Design of Steel and concrete high rise buildings
2. Structural design of infrastructure works
3. Structural design of long span bridges
4. Structural design of retaining walls, culverts etc
5. Proefficient on CSI SAP, Bridge, ETABS
6. Proefficient in TEKLA structural designer and Structures
7. Proefficient in Bentley STAAD Pro and RAM connection
8. Proeficient in Non destructive testikng
9. Carried out site supervision of buildings and bridges
10. Familiar with US codes including but not limited to ACI and AASHTO
Experience as Structural Engineer
01 March 2018
31 August 2009
? Performed structural design review of 224 MW HUBCO power plant Pakistan including Powerhouse, Tankfarm, Administration Building, Unloading Station, Cooling area and Air cooled Condenser.
? Performed condition assessment of different building in Packages Industry Lahore Pakistan.
Experience as Senior Structural Engineer
NESPAK
01 September 2009
26 December 2019
? Analysis and Design review and estimation of bridges of Preliminary design of Pakistan Railway Main Line –I (CPEC) from Karachi to Peshawar Pakistan.
? Estimation of structure and subgrade quantities of Preliminary design of Pakistan Railway Main Line –I (CPEC) from Karachi to Peshawar Pakistan.
? Coordination with other divisions and preparation reports like level crossings of Preliminary design of Pakistan Railway Main Line –I (CPEC) from Karachi to Peshawar Pakistan.
? Analysis and design of pre-stressed bridges (14+ Numbers) of span varying from 20 to 25 meters on 134 Km Motorway M9 Pakistan.
? Analysis and design of rehabilitation and connection with existing pre-stressed bridges (20+ Numbers) on 134 Km Motorway M9 Pakistan.
? Analysis and design Steel Pedestrian bridges of span ranging from 10 to 20 meters including but limited to Steel Motorcycle ramps and staircases on 134 Km Motorway M9 Pakistan.
? Analysis and design Steel Toll Plaza at Karachi on 134 Km Motorway M9 Pakistan USING STAAD PRO.
? Analysis and design of steel single and double flag signboards &VMS gantries on 134 KM Motorway M9 Pakistan.
? Analysis and design review of pre-stressed bridges, RCC culverts, retaining walls, rehabilitation and connection with existing pre-stressed bridges, steel pedestrian bridges, steel overhead gantries, steel single and double flag signboards &VMS gantries on 134 KM Motorway M9 Pakistan.
? Analysis and design of RCC frame structure (G+15) for Energy Center building in PKLI Hospital Lahore Pakistan using ETABS.
? Analysis and design of RCC frame structure (G+10) for administration Hostel building in Islamia University Bahawalpur Pakistan using ETABS.
? Analysis and design of RCC frame structure with block masonry for Masjid in KPK Pakistan using ETABS.
Master 01 August 2016
MSc Building StructuresBachelor 01 March 2008
Building and architectural engineering