1. Work as a Site Engineer/Area Planner according to the nature of the Project.
2. Supervise all the documentation of the Project and also Lead the execution team.
3. Attend meetings with client and discuss the look ahead plan, changes in site conditions and daily progress report.
4. Site Visits with Client's Project Incharge and Electrical Personnel for LOTO, Queries, and Progress at Site.
5. Review the Job Safety Analysis with Client's Safety Personnel.
6. Prepare and Submit RFI (Request For Inspection) Reports.
7. Responsible for all the Work Permits at Site.
8. As a Trainee Engineer at Multan Electric Power Company, Monitor all the activities in their associated departments and learn the testing, inspection, protection and instrumentation of various equiments.
9. As a Trainee Engineer at NTDC, 500 K.V. Grid Station Multan, Monitor all the activities in grid yard, visit the control room and note the readings, visit battery room. Learn all the activities according to the Single Line Diagram of the grid station.
10. As a Trainee Engineer at Thermal Power Plant Muzaffargarh, Check and monitor all the on-going activities in the field and control room. Learn the whole process of power generation step by step.
Appreciation Award from DESCON ENGINEERING QATAR L.L.C for safe and successful execution of Qafco UPS Project.
Appreciation Award from DESCON ENGINEERING QATAR L.L.C for successful completion of QATARGAS Train 3/SRU-02 Shutdown
Experience as Engineer
17 February 2019
13 December 2019
Started New job with DESCON Engineer Qatar LLC. No position of Trainee or Assistant Engineer was available at that time so I was hired PTW Coordinator to work as an Engineer irrespective of the Designation granted.
Worked as Site Engineer/Area Planner with the following companies:
QATARGAS North.
SIEMENS Qatar.
Qatar Fertilizer Company.
Gained the professional experience by working with Mega Industry. Familiar with the Safety, PTW, LOTO, RFI's, and all documentation.
Experience as Internee/Trainee Engineer
Multan Electric Power Company
17 September 2018
09 November 2018
Completed 2 months practical training at MEPCO Multan.
During the training worked in 4 departments.
1) Protection and Instrumentation
2) Metering and Testing
3) Testing and Inspection
4) Substation and Transmission
Learnt about the testing, protection and measurement of various equipment.
Monitor power transmission and all process at the substation.
Made Single line diagram and other wiring diagrams.
Gained professional experience in Working of Meters and their respective testing and Testing of cables, panels and transformers.
At the end of the training, prepare and submit training report.
Experience as Internee/Trainee Engineer
NTDC, 500 K.V. Grid Station, Multan, Pakistan
08 July 2017
08 August 2017
Completed 01 month training at NTDC, 500 K.V. Grid Station Multan.
Worked as an Internee/Trainee Engineer.
Monitor all the on-going activities in the grid station.
Gained professional experience in working of electrical devices and their respective protection and instrumentation.
Learn reading of Single line diagrams.
Visit the control room and battery room.
Discuss the whole process and other electrical terminologies with Senior Engineer.
Isolation and De-Islolation.
At the end of the training, prepare and submit training report.
Experience as Internee/Trainee Engineer
Thermal Power Plant, Muzaffargarh, Pakistan
14 July 2016
15 August 2016
Completed 01 month practical training at Thermal Power Plant Muzaffargarh.
During the training worked in Unit#04 of the power plant.
Monitor all the on-going activities in the field and learn all the process of power generation.
Visit the control room and check field activities and note their values.
Gained professional experience in Working of Steam turbines, cooling towers and draft fans.
Monitor power transmission in the yard.
Make diagrams according to the whole process of the power plant.
At the end of the training prepare and submit the training report.
Matric 31 July 2011
Completed Matriculation in Science (BIOLOGY) with 83% marks.Intermediate 07 August 2013
Completed Intermediate/FSc (Pre-Engineering) with 68% marks.Bachelor 03 July 2018
Completed Bachelor of Science in Electrical Engineering with 3.02/4 CGPA. Major Subjects: Power