Ali Baqar
HVAC Project Engineer
Lahore
Summary of Career
1. Coordination/Management of all HVAC Projects
2. Develop HVAC Conceptual Design
3. Preparing design documents including HVAC Layout drawings and overall scheme of system.
4. Performing detailed cooling/heating load calculations on Carrier HAP Program based on design criteria
5. Duct design and Pipe Size
6. Creating a technical report regarding suggested HVAC systems according to requirements, and carrying out analysis based on Project capital and recurring costs, among different HVAC Systems.
7. Equipment selection and preparation/Management of equipment schedules
8. Preparation of HVAC design drawings.
9. Making of technical specification of the selected equipment.
10. Quantity surveying, Billing & verification,Preparation of HVAC Drawings (Coordination, Shop & As Built) for Different Projects *Checking of Submittal & shop drawings
Experience as HVAC Engineer
Mecatech Pvt Limited
27 May 2009
31 July 2012
Job Responsibilities:
-Review ITB (Invitation to Bid) documents during the proposals / Tender Bidding stage, issue inquiry requisitions, review techno-commercial offers
-Project execution and project monitoring
-Project Planning and scheduling.
-Ensuring the timely and smooth flow of information among disciplines to execute associated design activities.
-Ensuring issuance design deliverable as per agreed project schedule.
-Quantity surveying of different on-going projects.
-Preparation of equipment purchase specifications coordination with various discipline engineers.
-Strategizing timely design complete related to key project milestones & long lead items.
-Checking of Materials and workmanship quality at site work.
-Preparation of HVAC Cost Estimation and Rate Analysis.
-Review of Shop & As-Built Drawings
-Review of Technical Submittals.
Projects Handled:
PTET Telecom Tower, Islamabad 2240 TR Capacity Based on Central Plant
THE CENTAURUS TOWER, ISLAMABAD 3600 TR capacity Based on Central Plant
SUPARCO, Lahore 320 TR Capacity Based on Central Plant
JINNAH HOSPITAL BURN CENTER LAHORE 1010 TR Capacity Based on Central Plant
Fauji Foundation Teaching Hospital Rawalpindi 300 TR Capacity Based on Central Plant
NADRA Johar Town Lahore 200 TR Capacity Based on Central Plant
Experience as HVAC Design Engineer
03 September 2012
Responsibilities:
-Review ITB (invitation to Bid) documents during the proposals stage, issue inquiry requisitions,
review techno-commercial offers.
-Preparation of Design Concept reports.
-Coordination Drawings to incorporate HVAC System requirements in Architectural Design.
-Data Take off from Architectural Drawings
-Cooling and Heating Load Calculations on HAP software.
-HVAC Ducting and Piping design.
-Preparation of Design Drawings.
-Pump Head Calculation
-External Static Pressure Calculation
-System Volume Calculation
-Preparation of Equipment Schedules / Data Sheets.
-Preparation of Bill of Quantities / Material Take off
-Engineer’s Cost Estimate preparation.
-Review of shop drawings.
-Review of Technical Submittals.
-Verification of Contractor’s Bills
-Preparation of Equipment Purchase specifications, coordinating with various discipline Engineers.
-Preparation of RFQ’s and technical evaluation of Vendor proposals.
-Follow-up with vendors and preparing/summarizing technical bid evaluation.
-Reviewing post order vendor documents by internal technical coordination between various
disciplines to ensure vendor equipment design in accordance with discipline detail design.
-Assessing Customer requirements, by review and interpretation from the Client’s Technical Specification.
-Reviewing bids and preparing technical evaluations, considering technical compliance and cost effectiveness.
-Defining and distribution of interface information.
-Review, evaluation and approval of equipment/package vendor documentation.
-Preparation of engineering schedule and man hour’s estimation.
-The exchange of information and communication with the vendor Projects Handled:
BAPCO MODERNIZATION PROGRAM BUILDING
WORKS FOR MEP PACKAGE
Different Type of Substation & Rack Rooms (Around 48
No’s) Based On HVAC Central Plant
ADCO Tie Ins South East 28 Passive Cooling Shelter at Various Well Heads
FERTIL Bagging facility (100 TR capacity based on VRF System)
HAWL – Alloy Rim Plant, Karachi (250 TR capacity based on VRF Units)
UCH-II 400 MW Power Plant (600 TR Capacity on Roof Top Packaged Units)
Parco Refinery Substation (600 TR Capacity on Roof Top Packaged Units)
National Refinery Project (300 TR Capacity on AHU with Condensing Units)
Rack Room-Pakistan Arab Refinery Project
(30 TR Capacity on AHU with Condensing Units)
ASHMORE Beverage Can Plant (500 TR capacity based on Ducted AC Units & Plant
Ventilation)
Substation at national refinery limited (150 TR capacity based on Packaged Units Karachi)
ICI Morinaga Formula Milk Plant,
SHEIKHUPURA 1460 TR Capacity Based on Central Plant
Bachelor 04 March 2010
B-Tech Pass & B-Tech Honour (HVAC)