Jawed Ali
Electrical Engineer
Hyderabad
Summary of Career
1. A very Professional Electrical Engineer having experience in Project Management, Construction supervision, Erection, Execution, Installation electrical system in wind power plants, Building electrification work, Distribution Network & Underground 33 & 11 kV cable laying works etc and well versed in all phases of EPC projects; including drawing review, scheduling, contract review, engineering, material procurement, Quality control and Offered services in Pakistan & Bahrain with Client, Consultant
2. Plan and execute MEP works for restaurant outlets, 11 kV underground cabling works, Construction supervision & installation of 11 kV substations equipments and landscape lights installation works.
3. Responsible to ensure that all the works done accordance with the approved construction drawings, contract documents, project specifications and as per EWA/EDD rules and regulations.
4. Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
5. Attending weekly technical and progress meetings with the consultant /client's representative and give clarification on raised queries.
6. Directly responsible for the safety of all electrical personnel of the project by ensuring that the project execution will be done according to all applicable health, safety and environmental standards
7. Directly reporting to Project Manager regarding site progress and other works as required.
8. Construction supervision of project including installation, execution, erection, testing and commissioning of 132/33 kV substation and GW-82/1500 wind turbines and MEP works.
9. Review detailed drawings and design of 132/33KV substation and ensures that drawings are according to NTDCL & IEC standards.
10. Ensure the EPC contractor shall comply with Project Specifications, Standard and Quality Procedure.
Experience as Electrical Engineer
NASS Group & Corporation
15 January 2018
26 September 2018
Duties & Responsibilities Included:
Construction Supervision and Underground cabling works
Plan and execute MEP works for restaurant outlets, 11 kV underground cabling works, Construction supervision & installation of 11 kV substations equipments and landscape lights installation works.
Responsible to ensure that all the works done accordance with the approved construction drawings, contract documents, project specifications and as per EWA/EDD rules and regulations.
Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
Attending weekly technical and progress meetings with the consultant /client's representative and give clarification on raised queries.
Directly responsible for the safety of all electrical personnel of the project by ensuring that the project execution will be done according to all applicable health, safety and environmental standards.
Directly reporting to Project Manager regarding site progress and other works as required.
Experience as Electrical Engineer & Site Manager
ACT Group
26 November 2015
31 December 2017
Duties & Responsibilities Included:
Construction Supervision:
Construction supervision of project including installation, execution, erection, testing and commissioning of 132/33 kV substation and GW-82/1500 wind turbines and MEP works.
Review detailed drawings and design of 132/33KV substation and ensures that drawings are according to NTDCL & IEC standards.
Ensure the EPC contractor shall comply with Project Specifications, Standard and Quality Procedure.
Attending daily, weekly and monthly meeting with management and EPC contractor regarding QA/QC & project progress.
Supervision of earthing works for equipment foundations (Transformer Bays, Line Bays, C.B foundation, CT/PT foundation, Cable Trenches, Transformers and Tower Foundations Control House Building etc.).
Responsible for Erection of Equipment’s, Transformer, Control Panels, Relay Panels, AC/DC Panels and switchgears.
Responsible for the day to day running of the work schedule, Report Writing & keeping an eye on schedule.
Liaison with Contractors, Consultant, WTG Supplier, Independent Engineer etc
Directly reporting to Project Manager regarding allocation of resources on project site.
Key role to achieve reliability run test (RRT) and commercial operation date (COD) of the plant.
Operation & Maintenance:
Overall responsible for the operation (GW-82/1500, 1.5 *20 =30 MW) Wind farm.
Manage daily operation activities of plant, CCR activates in a safe, efficient and secure manner in accordance to the established reliability, safety procedures and guidelines to strive for continuous availability plant.
Ensure that daily events record, generation and interconnection data’s are entered and updated and required reports are prepared by control room operator.
Responsible for the Coordination with NPCC, RCC and NTDCL regarding shutdown and other purposes.
Complete Wind data analysis of both Up/Down stream wind masts and collection & calculation of all technical data (i.e. non project missed volume) regarding Monthly Invoicing to Power Purchaser (CPPA, NTDC).
Review and approve planned outages and commissioning program before giving it to control room for execution.
Ensure compliance to all safety rules and regulations and policies of NPCC and RCC.
Being a team leader attained daily, weekly and monthly meeting with O&M operator.
Experience as Site Electrical Engineer
M/s Zaffar Enterprise
02 July 2012
31 May 2014
Job Responsibilities:
Distribution Network Installation:
Plan, coordinate, manage electrical issues and installation activities of Aerial bundled cable (ABC) at site in mains, sub mains according to drawings.
Responsible to lead site personnel to execute and completion of job on time at site.
Responsible to submit daily site reports, survey reports, estimates and all applicable monitoring reports on regular basis or as required.
Responsible for the safety of all electrical personnel of the project by ensuring that the project execution will be done according to all applicable health, safety and environmental standards.
Any other as tasks assigned by Project Manager.
Experience as Assistant Engineer - Electrical
MAB Fire Protection Pvt. Ltd
10 January 2011
30 June 2012
Job Responsibilities:
Responsible for Inspection, testing, operation of Fire Alarm & Fire Fighting System.
Responsible to tackle emergency issues and provide on-spot solutions.
Resolve operating issues and perform regular periodic maintenance.
Responsible for corrective maintenance and preventive maintenance of system.
Bachelor 31 December 2010
B.E Electrical Engineering