Abdul Majeed
Abu dhabi
Summary of Career
1. Review the ITB Document
2. Prepare the Scope of Work
3. PRepare the RFQ
4. Coordination with Vendor
5. Check the Vendor offer as per spceification
6. Make the Log of RFQ and Vendors
7. Make the Cost Estimates
8. Make the Proposal
9. Attend the Meetings with Clients and Vendors
10. Coordinates with the Different departments and Companies
Experience as Eelctrical Engineer
Heavy Industries Taxila
03 March 2010
31 December 2012
• Manufacturing and assembling of Power Transformer(132 KV/22KV/33KV/6.6KV)
• Performing High Voltage Tests, Routine tests of Power transformer
• Maintenance Work of Power Transformer i.e. 10/13, 20/26 MVA.
• T/F Core manufacturing supervision on George CNC used for cutting of silicon steel used in core of transformers.
• Winding and Insulation Manufacturing and installation
• Supervision of Final assembly of all parts of Transformers (Core, Windings, LV,HV and RV Connections)
• Substation control and maintenance of electrical systems.
• Drawing modification support to engineering and design
• Maintenance work in workshops, fault finding and its rectification
• Coordination and Supervision/monitoring of ongoing tasks in practical Labs
• Coordination with the Customer and Other departments for the smooth manufacturing and testing of transformers.
Experience as Senior Engineer E&I
Descon Engineering Services & Technology (Private) Limited
01 February 2013
31 December 2018
• Lead the Site team of Engineers/Supervisors and Technicians as Area In charge
• Daily plan the activities and set the priority, assign the job to the right people and follow up the execution of the job.
• Work with the department manager to provide the required technical support for the team to solve the daily site problems.
• Recommend the necessary tools to the department manager to facilitate the job executions.
• Support the department manager to maintain the required material daily E&I activities plan achievements.
• Check and monitor the field instruments installed in plants and report to the department manager the status
• Coordination with other department and Suggest solutions and replacement plans for achievements of targets and clear the defects
• Engage with the projects activities (design phase, implementation, FAT, SAT and hand over.
• Meeting with the client site team for daily targets, System completion and Technical queries
• Preparation of Documents like MS,JSA,TQ and progress reports
• Leading the Control system installation and Commissioning in CCR and Substations like SCADA/PLC,DCS/ESD,SWGR and F&G
• Leading the installation and commissioning of various instruments and control systems.
• Installation of instrument as per Layouts and typical installation on the compressors and Gas Compressors for utilities packages, Flare Gas skids, Fuel Gas, Booster Compressors, turbines, Slug Catcher and well heads.
• Calibration of Field instruments including FF type, Stroke testing of Valves, Fire and Gas instrument on compressors and Gas Compressors, Flare Gas skids, Fuel Gas Skids, Booster Compressors and turbines and testing and commissioning support with Vendors.
• GTG work package completion as per vendor recommendation and drawings for cable termination and installation of instruments inside Module technical room.
• Loop checking and trouble shooting of various loops with aggressive approach to meet targeted dates.
• Modification of DCS IO List, Instrument List, Cable Schedule, Logic & Loop Diagram
• Supervise the maintenance activities of the equipment used at the plants to ensure to maintain efficiency, production and reliability during shutdown period.
• Installation and Maintain the control system installed in Plant to ensure the proper functionality of the SCADA systems and plant control platforms.
• Pre assemble Units work, Pre assemble module and Pre assemble racks work completion like F&G system, lighting and earthing system.
• Modification of the pre-installed instrument like fire and Gas after the approval of Operation Engineers with complete procedure of isolation with PTW.
• Daily site Visit with HSE teams for the Safety Walk down for the compliance of safety rules and Plant safety.
• Coordination with Mechanical and commissioning teams for the Operation of activities
• Daily TBT with site team and Plant Operation team for the HSE policies compliance.
Experience as Senior Engineer E&I
Contracting and Trading
01 January 2019
• Review the ITB (Invitation to Bid) documents submitted in the proposals stage, issue inquiry requisitions, review techno-commercial vendor offers, prepare equipment, material and man-hour estimates.
• To liaise with consultants, clients and contractors on the progress of Electrical work.
• To supervise and ensure works are in accordance to the contract drawings and specifications.
• Preparing method statement, shop drawings, installation / T&C check sheets, work progress report and other relevant documents for Electrical related works.
• Coordinate with contractors and consultants in preparation of technical submissions.
• Assist the Technical Manager in all Electrical matters including preparing Electrical works Master Construction and T&C Schedule.
• Hold technical discussions with various stakeholders to resolve technical / site issues.
• Liaise and work with relevant authorities on shop drawings / equipment submissions, inspections, testing requirements and commissioning.
• Sound understanding of Engineering practices, design methods & calculations.
• Interpret & prepare applicable technical information & suggest design or process changes to ensure functional and cost effective results.
• DCP,ETS, substations, Oil and Gas field Proposal preparation for EIT SOW
• Review contract requirements for project EIT SOW execution, organize the preparation of the Technical Document Register (TDR), identify requirements and scope of work
• Verify and conceptualize the most optimum work route. Identify a clear scope of work/supply and accordingly plan/schedule the engineering activities and manpower resource for E&I.
• Identify and quantify total number of engineering deliverables, man-hour allocation, and format of delivery, time schedules and other requirements for execution of the work.
• Engage with the projects activities (design phase, implementation, FAT, SAT and hand over)
• Coordinate with projects and planning on project time schedules, establish target completion dates, ensure target dates are achieved.
• Coordinate the preparation of Purchase Requisitions for the procurement of equipment and materials. Ensure materials are obtained within scheduled timeframes and budgeted costs.
• Interface and regularly meet with client and vendor representatives, conduct internal staff meetings, ensure the progress of project in accordance to schedule, allotted man hours and budgeted costs.
• Direct and monitor Material Take off (MTO) activities, identify irregularities and shortfalls, take corrective action as required.
• Interact with Quality Assurance for quality issues; strictly ensure compliance with Company’s ISO Quality procedures. Coordinate Internal and Client audit requests; facilitate audit procedures of engineering systems within the department.
• Interface and provide clarification and guidance and technical support to construction sites and commissioning engineers, provide start up assistance as required.
• Supervise and lead more than one project activities (if assigned as a Group leader) within the discipline and interact with the designated engineer and the Direct Supervisor.
• Provides technical product support and guidance through project life cycle from tender phase through design, manufacture, assembly, test and installation.