Sohail Kamran

Production Facilities Engineer
Rawalpindi


Profile Views 233

Recommendations (0)

Skills
production Facility Design Operational Maintenance Integrity Management Process Optimization Risk Management Preventive Maintenance Risk Base Inspection Pipeline Artificial Lift Static Equipment HYSYS PIPESIM Shutdown & Turnaround Planning API & ASME Code
  • Experience
    8 Years
  • U.A.E Experience
    --
  • Industry
    Oil , Gas & Energy
  • Nationality
    Pakistani
  • Visa status
    Not Applicable
  • Qualification
    Bachelor - Bachelor of Mechanical Engineering, College of E&ME ( NUST), Islamabad
  • Driving License: Valid (Pakistan)
Other Matching Titles/Position
Industry Titles
Oil , Gas & Energy

Summary of Career

1. Manage project feasibility studies and prepare job packages for new production facilities installations, repair and modification of existing production facilities including their technical evaluation, specifications and materials for modifications together with process diagrams and cost estimates.


2. Manage the production of conceptual, front-end (FEED) and detailed engineering for assigned projects, including cost estimates, terms of references, and project schedules.


3. Manage design team in the preparation of necessary drawings, engineering design calculations and Hydraulic analysis, project specifications, data sheets/material requisitions, and ensure correctness, completeness and compliance with industry and company standards and specifications.


4. Ensure compliance to all relevant quality, health, safety and environmental management procedures and controls to guarantee employee safety, compliance, delivery of high quality and a responsible environmental attitude.


5. Monitor and supervise the activities and work of inspectors to ensure that all work within a specific area of the inspection activity is carried out in an efficient manner which is consistent with production facilities operating procedures and applicable API/ ASME Codes.


6. Review and establish frequency of static equipment inspection schedules using Risk Base Inspection methodology and formulate inspection policies and procedures.


7. Regularly monitor inspectors’ reports to estimate service life of equipment’s fitness for service and ensure integrity and quality standards are maintained in line with API & ASME Codes.


8. Participate in detailed turnaround/ shutdown planning for inspection/facilities modification jobs including reviewing engineering design documents, preparations of scope of work of inspection activities, extent of inspection for plant equipment.


9. Provide overall management for determination of overall project resourcing, identify risks and prepare contingency plans for the entire engineering projects portfolio to ensure that the goals are achievable within required schedules and budgets.


10. Participate in developing RFQ & Tender documents relevant to all engineering operations and participate in technical evaluation of contractors/consultants in tender process, while monitoring all contractual activities related to the project to ensure cost effective and quality services are obtained from vendors/Contractors.


Work Experience (Employment History)

Experience as Design / Inspection Trainee Engineer

  • Employer

    Attock Refinery Limited

  • From

    15 January 2012

  • To

    12 February 2013

  • Detail

    • Supervised the activities of Non-Degree Inspection and ensured all the duties are performed as per plan.
    • Worked as a team leader during plant Shutdowns/Turnarounds to carry out inspection of facilities static equipment units (Process Piping, Pressure Vessels, Heat Exchangers, Distillation Columns) using Non Destructive Examination (NDE) Techniques in compliance with inspection plan.
    • Conceptualized, designed and developed piping systems of requested jobs in conformance with API & ASME Standards, project’s scope of work & specifications.

Experience as Project Planning Engineer

  • Employer

    Public Works Department

  • From

    16 February 2013

  • To

    28 December 2015

  • Detail

    • Development/ Implementation of Project Configuration Management plan (Scope of Work, Budgeting, Design Reviews, and Reporting) to meet the requirements of project throughout its life cycle.
    • Development of Standards Operating Procedures (SOPs), baseline documents to meet requirements of each phase of project life cycle.
    • Reviews of design documents at define intervals with concerned stakeholders to ensure compliance with project goals.
    • Manage Change Control Management to incorporate changes in approved baseline documents to achieve desired project outcomes in timely & cost effective manner.
    • Prepare project status report on weekly basis for higher management review & necessary actions.

Experience as Production Facilities Engineer

  • Employer

    Oil & Gas Development Company Limited

  • From

    04 January 2016

  • To

    02 September 2019

  • Detail

    Key Responsibilities:
    • Manage project feasibility studies and prepare job packages for new production facilities installations, repair and modification of existing production facilities including their technical evaluation, specifications and materials for modifications together with process diagrams and cost estimates.
    • Manage the production of conceptual, front-end (FEED) and detailed engineering for assigned projects, including cost estimates, terms of references, and project schedules.
    • Manage design team in the preparation of necessary drawings, engineering design calculations and Hydraulic analysis, project specifications, data sheets/material requisitions, and ensure correctness, completeness and compliance with industry and company standards and specifications.
    • Ensure compliance to all relevant quality, health, safety and environmental management procedures and controls to guarantee employee safety, compliance, delivery of high quality and a responsible environmental attitude.
    • Monitor and supervise the activities and work of inspectors to ensure that all work within a specific area of the inspection activity is carried out in an efficient manner which is consistent with production facilities operating procedures and applicable API/ ASME Codes.
    • Review and establish frequency of static equipment inspection schedules using Risk Base Inspection methodology and formulate inspection policies and procedures.
    • Regularly monitor inspectors’ reports to estimate service life of equipment’s fitness for service and ensure integrity and quality standards are maintained in line with API & ASME Codes.
    • Participate in detailed turnaround/ shutdown planning for inspection/facilities modification jobs including reviewing engineering design documents, preparations of scope of work of inspection activities, extent of inspection for plant equipment.
    • Provide overall management for determination of overall project resourcing, identify risks and prepare contingency plans for the entire engineering projects portfolio to ensure that the goals are achievable within required schedules and budgets.
    • Manage to collect, validate and analyze information on project progress against plan to highlight key variances requiring cross-functional resolution in order to achieve all contractual milestones aligned with quality measures as per overall baseline schedules and within allocated budget.
    • Participate in developing RFQ & Tender documents relevant to all engineering operations and participate in technical evaluation of contractors/consultants in tender process, while monitoring all contractual activities related to the project to ensure cost effective and quality services are obtained from vendors/Contractors.
    • Ensure effective coordination and monitoring of contractor staff, endorse work carried out by contractors and thereby facilitate timely completion of tasks as per companies Quality and HSE standards.

Academic Qualification

Matric 01 June 2005

F.G Piffer High School Abbottabad

Bachelor 01 September 2011

Bachelor of Mechanical Engineering, College of E&ME ( NUST), Islamabad

Intermediate 01 July 2007

F.G Sir Syed College The Mall, Rawalpindi, Pakistan
Certifications
Recommend Sohail Kamran
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: QC Inspector
Current City: Abu Dhabi

Profession: Engineer
Current City: Karachi

Profession: ENGINEER
Current City: ABUDHABI

Profession: Instrument technician
Current City: Pind Dadan Khan

Profession: Engineer
Current City: Abu Dhabi

Profession: Mechanical engineering
Current City: