Mohsin ali
Electrical engineer
karachi pakistan
Summary of Career
1. Commissioning of 7700 TPD line three of power Cement ltd by flsmidth.
2. Planning & scheduling of Preventive & Predictive Maintenance
3. Inspection of motors (DE & NDE), finding out the reasons of high vibration, abnormal sounds and high temperature in motors.
4. Shutdown Planning as per condition monitoring and inspected reports
5. Ensure that maintenance schedules generated from CMMS MICROSOFT SOFTWERE are implemented accordingly
6. Inspection of Electrostatic precipitator
7. Co-ordinate & co-operate sagely with other departments to resolve problems and Troubleshooting at plant
8. Data Recording and analysis of daily and weekly inspection reports
9. Execute the planned tasks
10. Assest manegement
Commissioned the 7700 TPH cement plant. performed the first oil filling before the targeted time. Managed the team for shutdowns.
Experience as Trainee engineer
Power Cement Limited
01 July 2019
To date
I am currently serving in PPMD (preventive planning and maintenance department) as inspector.
Matric 23 August 2012
Science groupIntermediate 29 August 2014
pre-engineeringBachelor 25 December 2019
Electrical engineering