ahmad rizwan

quality control engineer / inspector
Dubai


Profile Views 134

Recommendations (0)
Last Seen: 08 August 2020 6:29 PM

Skills
MANAGEMENT/QUALITY CONTROL/ QUALITY ASSURANCE/ INSPECTION/ TESTING/ DOCUMENTATION COMMUNICATION & COORDINATION
  • Experience
    More than 15 Years
  • U.A.E Experience
    12 Years
  • Industry
    Contracting /Construction
  • Nationality
    pakistan
  • Visa status
    Employment Visa in UAE
  • Qualification
    Bachelor - civil engineering and technology
  • Driving License: yes
Other Matching Titles/Position
QA QC engineer
inspector
inspection engineer
Qc Engineer
Manager
Industry Titles
Contracting /Construction

Summary of Career

1. enusre of Implement procedures according to (MS, ITP, checklists, IR, MIR), drawings, and technical submittals


2. ensure of Material inspection (MAR & MIR) for incoming material. Ensure proper storage of material


3. ensure of stage wise inspection (IRs) from start to finish and follow up for approval


4. Governing the various sites as well as laboratory tests to maintain the strict Quality Control


5. Reporting to management and conduct internal quality meeting and attend client quality meeting


6. Raising & Report (NCR &CAR) to related material or workmanship, and monitor action until closeout


7. Ensure tool box talk conducted prior to start activity to avoid any rejection and proper workmanship.


8. Follow up and & preparation of final hand over documents(SNAG,DESNAG, PUNCHLIST) and submission of quality related documents


9. Conduct internal Audits to ensure continuous compliance with the contractual & ISO requirements


10. Ensure that the daily site reports, weekly monthly report and test results are recorded and all technical documents relative to site quality control are up to date and submitted to client


Work Experience (Employment History)

Experience as site engineer

  • Employer

  • From

    15 May 2005

  • To

    15 March 2008

  • Detail

    Execution of works with approved drawings
     Effective Coordination with the Sub contractors
     Continuous supervision of Works to obtain Maximum Productivity
     Achieving Targets given by the project manager
     Efficient Usage of materials, tools and equipment available
     Pre planning of the consequent activities which is to be performed on next day
     Maintaining quality in the works involved
     Requirement of safety in works proceeding
     Timely Delivery of materials to the sub-contractors to avoid delays
     Awareness of MEP Services in every stages of Works

Experience as quality supervisor

  • Employer

    Bauer Abu Dhabi UAE

  • From

    16 May 2008

  • To

    15 March 2010

  • Detail

    as above

Experience as senior level quality control engineer

  • Employer

  • From

    15 May 2010

  • To

    15 April 2018

  • Detail

    as above

Experience as senior level quality control engineer

  • Employer

  • From

    15 May 2015

  • To

    15 March 2018

  • Detail

    as above

Experience as senior level quality control engineer

  • Employer

  • From

    15 May 2018

  • To

    To date

  • Detail

    Monitor the implementation of approved Project Quality Plan and coordinate with all Project Team on all quality issues and ensure that the quality related site activities
     Review IFC drawing, specs, shop drawing with MEP drawings
     Prepare and Implement procedures(MS, ITP, checklists, IR, MIR), drawings, and technical submittals,
     Submission and assurance of stage wise inspection (IRs) from start to finish and follow up for approval
     Give direct guidance to the project engineer with regard to daily in-house inspection
     Completion of necessary documentation to verify the work Performed.
     Submission and raise inspection (MAR & MIR) for incoming material. Ensure proper storage of material
     Liaise with third party/ client inspection on witness of site inspection, and approval
     Governing the various sites as well as laboratory tests to maintain the strict Quality Control
     Raising & Report (NCR &CAR) to related material or workmanship, and monitor action until closeout
     Analyze non-conformances and preventive actions implemented at site
     Monitoring and reporting project metrics to the management
     Attend client quality meeting and discussed quality matters, follow up and solutions
     Coordinate with site team and provide guidance for implementations of site inspection and control
     Confirm and analyze that the installer’s / subcontractors quality control procedures are carried out
     Submitting Measuring score card and KPI’s. MBO
     Reporting to management and conduct internal quality meeting
     Maintain all quality records in a retrievable manner.
     Ensure that the daily site reports, weekly monthly report and test results are recorded and all technical documents relative to site quality control are up to date and submitted to client
     Ensuring latest and proper controlled documents and drawing, procedures are being used at site
     Ensure tool box talk conducted prior to start activity to avoid any rejection and proper workmanship.
     Conduct internal Audits to ensure continuous compliance with the contractual & ISO requirements
     Follow up and & preparation of final hand over documents(SNAG,DESNAG, PUNCHLIST) and submission of quality related documents

Academic Qualification

Bachelor 15 September 2011

civil engineering and technology

Other 15 September 2000

Diploma of associate engineering and technology civil
Certifications
Recommend ahmad rizwan
Related UserList of Members
Mentor
MaryuM

FM managment ,Administration , Customer Services
Dubai

Last Login: 04 October 2020 11:24 AM
Profile Answers
Related Professionals
Profession: Project management
Current City: India

Profession: ELECTRICAL ENGINEER
Current City: ABU DHABI

Profession: Electrical Engineer
Current City: Dubai

Profession: Civil Engineer
Current City: Dubai

Profession: civil engineer
Current City: karama

Profession:
Current City: Sharjah