Salman Ahmed Khatti
Sr. Terminal Engineer
Karachi
Summary of Career
1. Coordinated maintenance, QHSE, and project schedules to ensure operational compliance
2. Developed and enforced QHSE SOPs, maintaining ISO certifications for QMS, EMS, and OHSMS.
3. Managed CAPEX and OPEX budgets, conducting quarterly reviews to ensure financial efficiency
4. Led safety trainings and mock drills, enhancing safety awareness and emergency preparedness.
5. Supervised procurement processes, negotiated with suppliers, and ensured job quality and completion.
6. Reviewed engineering documents for compliance with standards like API, ASME, and NFPA.
7. Supervised fabrication, installation, and commissioning, maintaining quality control in construction projects.
8. Developed quality management systems and conducted audits
9. Managed well production monitoring, drilling, and work-over projects
10. Conducted inspections, monitored welding processes, and ensured compliance with ASME and API standards
Experience as Quality Control Enggineer
Petrocon Pvt Limited
10 March 2008
20 April 2010
● Study of approved drawings & design (Piping plan and P &ID, Isometric).
● Review the applicable codes and specification for tanks and piping.
● Witness of procedure qualification and welder qualification.
● Allocation of WPS on Isometric drawings.
● Review the WPS & WQT as per ASME IX and Review the NDT procedures.
● Review the consumables control procedure.
● Welding monitoring as per WPS, study of applicable drawings and specifications.
● Inspection of welding as per approved procedure.
● Interpretation of radiograph as per relevant codes specification ASME B31.3, API- 650, ASME VIII Div 1, ASME SEC IX.
● Visual and dimensional inspection piping.
● Witness of hydro test and pneumatic test.
● Inspection of sand blasting painting & holiday testing.
● Witness of PT of welding.
● Inspection of steel structure as per D1.1.
● Final documentation.
Experience as Petroleum Engineer
OGDCL
01 April 2010
30 April 2011
● Worked on OGDCL Drilling Rig-307 and work-over project of 05 oil wells with Krakow rig K-750(T) and Poland rig Cramco,
● Carried out 01 oil well completion with the provision of Jet pump artificial lift system.
● Investigation for mechanical failures of tubing.
● Optimize artificial lift wells (jet pumps) through optimum use of existing equipment.
● Handle, retrieve and redress down hole jet pumps performance monitoring and analysis.
● Installed/retrieved Backpressure Valve by utilizing lubricator.
● Developed good understanding on Wire line logging and silk Wire line jobs.
● Carry out day-to-day monitoring of production and injection/disposal.
● Maintain well records and prepare completion & work over report.
● Updated reserves of a gas field using Excel sheets.
● Daily Crude oil and gas dispatch and marketing.
● Evaluate well and field Performance by using PDMS (Production Data Management System) Software.
● Visit each well in the field on daily routine basis.
● Calculate Individual well production rates.
● Field Production dispatches to refineries.
● Graph, monitor and review daily, weekly and production data to determine trends and abnormalities.
● Observe installation of surface facilities and its working.
● Prepare list of materials used at each field.
Experience as Sr. QA/QC Engineer
ENAR Petrotech Services Pvt Ltd
26 December 2011
28 August 2015
Projects:
1. Feed Study for Mehar Plant Condensate & LPG Transportation-OMV.
2. Concept Evaluation & Selection Study Mehar LPG Extraction Facility-OMV.
3. Tajjal-01&04 Well Head Compression Project-OMV.
4. Saqib-3 Wellhead Development Project. –OMV.
5. Rehmat-4 Flowline & Wellhead Surface Facilities Development Project –OMV.
6. Sawan north Horizontal -1wellhead Development Project-OMV.
7. Sawan CPP Condensate Handling & Storage Capacity Adequacy Check & Proposed Engineering
Solution project-OMV.
8. Jhal Magsi Gas Plant Facility Project- OGDCL
9. White Oil Pipeline Motor Gasoline Project (WOPMP)- PAPCO.
Responsibilities:
● Assist in developing the Project Quality Management system by establishing procedures, plans and work instructions as n
● Monitor implementation of the Asset/Project/Function Quality Management System through regular audits and reviews.
● Assist in developing and monitoring implementation of the Asset Integrity Verification Scheme throughout the Define and Execute Phases.
● Participate and provide input into technical QHSE and integrity reviews.
● Establish and monitor Key Performance Indicators (KPIs) to measure quality performance in different areas of work development and at various project Phases.
● Develop and ensure QA requirements are incorporated into Tender Documents, Contracts and Purchase Order.
● Monitor and report on compliance and nonconformities and maintain relevant records.
● Promotes Quality Awareness among project team members, contractors and vendors.
● Identify and manage risks that could impact achieving quality objectives.
● Follow up on action items and maintain status register.
● Develop and maintain QA/QC lessons learned register.
● Prepare monthly quality report. Contribute to the annual Management Review
Experience as Sr. Terminal Engineer
Be Energy Pakistan Ltd
07 March 2016
To date
Head Office Based Role:
• Coordinated maintenance, QHSE, and project schedules with location I/Cs to ensure compliance.
• Developed and enforced QHSE SOPs and records.
• Compiled and analyzed monthly maintenance and QHSE reports.
• Reviewed technical scopes, BOQs, and provided technical solutions for various jobs.
• Processed purchase requisitions and approvals, managed contractor bills, and monitored job quality and completion.
• Managed CAPEX and OPEX budgets, and conducted quarterly budget reviews.
• Conducted monthly performance review meetings with all locations.
• Achieved and maintained ISO certifications (IMS, ISO 9001:2015, ISO 14001:2015, ISO 45001:2018).
QHSE:
• Developed QHSE SOPs and ensured compliance across all locations.
• Prepared monthly QHSE reports and analysis.
• Conducted monthly performance review meetings focusing on QHSE metrics.
• Achieved and maintained ISO certifications for IMS, QMS, EMS, and OHSMS.
• Conducted safety trainings and mock drills to enhance safety awareness and emergency preparedness.
• Maintained QHSE documents according to ISO requirements.
Procurement:
• Managed the procurement process from requisition to approval.
• Obtained competitive price quotations and negotiated with suppliers.
• Ensured suppliers received identical information to provide fair and competitive quotes.
• Coordinated with the procurement department for bidding and contract awards.
• Processed contractor bills and ensured job quality and completion.
Engineering Design:
• Reviewed detailed engineering documents and ensured compliance with standards such as API, ASME, and NFPA.
• Coordinated with procurement for contract awards and responded to technical queries.
• Managed project schedules and ensured contractual compliance.
Construction:
• Prepared and monitored MS-Project schedules and progress reports.
• Supervised contractors' work on fabrication, installation, and commissioning of equipment, ensuring compliance with drawings and standards.
• Monitored progress, approved contractor invoices, and maintained quality control.
Maintenance:
• Supervised all terminal maintenance activities and prepared preventive maintenance schedules.
• Managed spare parts inventory and ensured compliance with international standards.
• Maintained maintenance history, recalibrated equipment, and prepared BOQs and cost estimates for projects.
• Conducted safety drills and trainings, ensuring compliance with safety procedures.
Matric 31 December 2000
Matriculation in Science. passing year 2000, Board is. BISE Hyderabad Sindh PakistanIntermediate 31 December 2002
Intermediate (Fsc) in Pre-Engineering. passing year 2002, Board is. BISE Hyderabad Sindh PakistanBachelor 31 December 2007
B.E Petroleum & N.Gas Engineering. passing year 2007, from Mehran University of Engineering and Technology Jamshoro Sindh, PakistanProject Quality Management
Certificate Of “Well Operations Crew Resource Management”
Certificate Of Level-01 Program
Participate In 5 Days ISO 9001:2008 Lead Auditor Course
Internal Audit Techniques
Awareness To ISO 9001:2008 QMS, ISO 14001:2004 EMS & OHSAS 18001:2007
HITRA Awareness (Hazards Identification And Task Risk Assessment),