Summary of Career
Experience as
01 September 2008
30 April 2009
? Inspected various mechanical rotating and static equipments like chillers, boilers & pumps
? Was liable for the scheduled maintenance for the plant production
? Responsible for the scheduled preventive maintenance for smooth plant operation
? Closure of punch list items and checks during schedule maintenance
Experience as
05 May 2009
06 May 2011
? Communicated with Aramco PMT and quality personnel for inspection
? Ensured availability of the required material for the job
? Supervised A/G and U/G piping as per IFC drawings and material requirement for gas, oil and water well head
? Inspected scaffolding for the construction work with approved licensed
? Taking the work permit for all construction for the well head
? Commissioned with pre & final punch listing for the project
Experience as
15 July 2011
31 January 2012
? Implemented IFC drawings and conducted inspection for HVAC and Fire fighting system as per scope
? Worked on water treatment plant, construction of water well, fuel tanks, structure, HVAC, plumbing and drainage system according to project standard and specification
? Completed the erection and installation of batching plant
? Reviewed the submissions as per BOQ requirement prior to the actual submission
? Prepared the execution plan for the site work with managing man power and logistics
? Conducted daily construction meetings and assigned personal on site
? Ensured the quality of work was according to the client’s standard and specifications
Experience as
11 May 2012
17 June 2015
? Looked after construction activities of 150 km long cross-country gas pipelines
? Ensured project schedule was on track
? Attended weekly meetings and resolved on-going construction and quality related issues
? Checked and verified contractor claims
? Generated daily and weekly progress reports and provided comments/feedback on technical reports?????
? Closed punch list items
? Worked on Hydro test packages and completed the pre commissioning of 44'' lean & rich gas pipe line
Experience as
25 May 2016
27 July 2017
? Responsible for project functions included but not limited to Project Management, Site Management, Project Control Management, Procurement, Construction Management, etc. are all coordinated and properly staffed to meet the project(s) goals. Prepare Daily progress report as per project reuirement
? Ensure accurate and timely reporting standards are maintained throughout the project(s)
? Ensure safety and QA/QC programs are established by all parties,maintained and conduct reviews of detailed design drawing and specifications
? Monitor engineering progress against budget and forecasted schedule
? Participate in and lead risk assessments and actively manage the risks of the projects and the business
? Prepare project estimates, budget, schedules ,execution plans and cost verses revenue for the project