Atif Waheed
Electrical
Dubai
Summary of Career
1. Design and implementation of complex domestic, commercial and industrial Electrical system.
2. ATS/AMF, Auto Load Sharing/Synchronization Panels, ASD, DOL, VFD, PFI, LT Switchgear
3. Make BOQ of inquiry given by the contractor or client and technical sound.
4. Make SLD on AutoCAD according to standards
5. Calculation of Load, Size of Cable (Conductor) voltage drop in 1 phase & 3 phase also calculation of Breakers (MCB MCCB ACB's).
6. Initial cost evaluation of project including cost of components, Copper calculations
7. Bus Tie Duct (BTD) Calculation.
8. Calculation of Electrical Load
9. Responsible for incoming and outgoing mail, calls and respond to inquiries from clients and participants
10. Supervising administrative staff and dividing responsibilities to ensure performance.
Experience as Lab Supervisor
Lahore Leads University
01 September 2012
01 January 2018
• Trouble shooting and maintenance of electronic instruments.
• Demonstrate experimental procedure to collect realistic data.
• Maintains inventory by monthly physical count.
• Performing laboratory tests in order to produce reliable and precise data to support scientific investigations
• Management of time by day-to-day monitoring to meet deadlines
• Work directly under head coordinator in the planning & implementation for final year projects.
Experience as Electrical Engineer (Design and Estimation)
JEI Switchgear Pvt. Ltd
01 February 2018
17 January 2020
• ATS/AMF, Auto Load Sharing/Synchronization Panels, ASD, DOL, VFD, PFI, LT Switchgear
• Design and implementation of complex domestic, commercial and industrial Electrical system.
• Make SLD on AutoCAD according to standards
• Control and monitor the actual execution of all electrical related works of the project,
To ensure that the project will be done in accordance with all the approved construction drawings, contract documents. Specifications and all applicable standards.
• Make BOQ of inquiry given by the contractor or client and technical sound.
• Initial cost evaluation of project including cost of components, Copper calculations
• Bus Tie Duct (BTD) Calculation.
• Calculation of Electrical Load
• Responsible for incoming and outgoing mail, calls and respond to inquiries from clients and participants
Matric 10 May 2008
Matric (Science)Intermediate 01 June 2011
Diploma of Associate Engineer (D.A.E) in ElectronicsBachelor 07 September 2015
BS Electrical Technology (4 Years)