MUHAMMAD SHAHZAD SABIR

PROFESSIONAL ENGINEER
DUBAI


Profile Views 169

Recommendations (0)

Skills
Projects Management Maintenance Management Production Management CAPEX Management Installation & Commissioning Process Management Overall Plant Maintenance Plant Operations
  • Experience
    15 Years
  • U.A.E Experience
    --
  • Industry
    FMCG
  • Nationality
    PAKISTAN
  • Visa status
    Visit Visa in UAE
  • Qualification
    Bachelor - B.E MECHATRONICS AND CONTROL ENGINEERING WITH MAJOR PROJECTS MANAGEMENT (F & B)
  • Driving License: VALID UAE DRIVING LICENCE
Other Matching Titles/Position
Industry Titles
FMCG

Summary of Career

1. Project Management ( Have delivered several projects worth USD $ 30 MIO)


2. Maintenance Management (Overall responsible of plant Maintenance)


3. Value stream Mapping & Production Management (Work place effectiveness solutions)


4. Process Management (Expert in various processes like liquid e.g water, juice, carbonated water, ketchup, chocolate making and packaging, powder process like wheat flour, semolina, sugar, cocoa powder etc.)


5. FRCA & Maintenance Management (Preventive & Break Down)


6. Team Management & Engagement (Managing Technical Team of Engineering Professionals, Supervisors and Technicians)


7. WBS analysis and Triple constraint Management (Cost, Quality & Timeline)


8. KPI’s defining, Tracking and re-assessment (Key Performance indicators of the projects)


9. Modern Manufacturing Principles (CI, TPM, LEAN, Six Sigma Etc.)


10. Continuous Improvement (Kaizen)


Work Experience (Employment History)

Experience as IN CHARGE PRODUCTION AND ASSEMBLY DIVISIONS

  • Employer

  • From

    30 November 2004

  • To

    31 December 2007

  • Detail

    Sayyed Engineers (Pvt) Ltd. Pakistan (NOV 30th, 2004 to DEC 31st, 2007)
    Designation: Engineer / In charge Production and Assembly divisions.
    Sayyed Engineers Limited pioneered ballpoint pen manufacturing in South Asia. In addition to being the largest producer of writing instruments in Pakistan, they are also exporting their quality products to over 25 countries worldwide.

    Main Responsibilities included:
    •Review production schedules, engineering specifications, and related information to ensure that the production targets are met on daily basis.
    •Recommend methods for improving utilization of personnel, material, and utilities.
    •Direct workers engaged in product measurement, inspection, and testing activities to ensure quality control and reliability.
    •Effectively communicate management and user personnel to develop certain project standards.
    •Provide quality engineering support to ensure implementation and compliance standards are met.
    •Preventive maintenance schedule implement at regular intervals to avoid the unexpected breakdown in Injection Molding and Assembly departments.
    •Install the new EDM (Electric Discharge Machine) for making the new molds, giving access to new designs.
    •Timely meet production schedules and targets with set quality parameters.
    •Provide associate team development through assessment, coaching and training programs.
    •Lead the calibration activities and maintain the record.
    •Maintain standard operating procedures/programs for areas of responsibility.
    •Support operational troubleshooting, problem solving and reduce the down time by effective maintenance management techniques.
    •Ensure a safe working environment for everybody and every day.
    •Set and monitor product standards, examining samples of raw products or direct testing during processing to make sure finished products are of prescribed quality.
    •Coordinate and recommend procedures for facility and equipment maintenance or modification, including the replacement of machines.

Experience as TECHNICAL SERVICES MANAGER

  • Employer

  • From

    24 January 2008

  • To

    28 February 2010

  • Detail

    My duties included:
    •Develop scope, budget, schedules, and plans for various projects.
    •Establish standards and methods for installation, testing, modification, inspection and maintenance according to engineering principles.
    •Managed more than 125 skilled workers, 14 Supervisors, in 11 Engineering & Technical Departments to get as low as 2% Down Time.
    •Evaluate the outcomes of the project as established during the planning phase.
    •Direct maintenance of machinery, equipment, plant, building and coordinate requirements and activities for new designs, carrying out surveys and maintenance schedules.
    •Design mechanical components, process parameters, machine and plant layouts and recommend modifications for optimum workforce and materials utilization.
    •Ensure the operational procedures are followed and products meet the set quality standards
    •Direct installation of new machinery, facility upgrades, repairs and replacement of machinery, assist maintenance team, design and upgrade of control systems.

    Key Projects:

    1:Installation, commissioning, testing till continuous running of ZILLI & Bellini RTD (Ready to Drink) Complete Line (Rinsing, Filling & Capping, Inter cooler, Final Cooler and Packaging).
    2:Installed Bosch Can Filling and Seaming machine. For canned products.
    3:Installed several liquid transfer pumps i.e ALFA LAVAL pumps installed for juice lines (7 pumps installed of various capacity), DESMI ROTAN pumps installed for Ketchup lines (4 pumps installed of various capacity)
    4:Installation, Commissioning, Testing till hand over of the KHS Filling Machine for the JAM Line.
    5:Installed the SOLLICH chocolate bar production line with the help of foreign Experts.
    6:Supervised the major overhauling maintenance of the CUMMINS Diesel Generator 1.1 M Watt.

Experience as PRODUCTION / PROJECTS MANAGER

  • Employer

  • From

    03 April 2010

  • To

    11 August 2013

  • Detail

    Key Projects:
    1:Complete installation and commissioning of BUHLER long cut pasta production line with inline packaging. (Project Worth USD 8.6 Mio)
    2:Complete installation and commissioning of BUHLER short cut pasta production line with inline packaging. (Project Worth USD 9.2 Mio)
    3:Merged the labor camp and warehouse into Production area and supply of air compressor line, hot and chilled water lines. (Project Worth USD 600k)
    4:Installed and Commissioned storage tanks (silos) for semolina and wheat flour of capacity 75 MT and 100 MT. (Project Worth USD 1.7 Mio)
    5:Installed and commissioned of two sets of boilers and chillers and monitored the performance through efficiency evaluation diagram. (Project Worth USD 1.5 Mio)

Experience as ENGINEERING PROJECTS MANAGER

  • Employer

  • From

    08 September 2013

  • To

    18 September 2019

  • Detail

    Key Projects:

    1:Installation, commissioning, testing till the final running of Fat melting grids, conches, Mixing vessels, Transfer pumps, flow meters for the Liquid Chocolate supply of 55 Tons / 8 hours shift etc. (Project Worth USD 15 Mio)
    2:Installed several Product transfer pumps (Centrifugal, Lobe Type etc), Temperature and Pressure sensors, Designed sequence of operations and parameters, Integration with PLC,s (Project Worth USD $ 1 Mio)
    3:Packaging line project Installation and Commissioning of three Flow wrapping machines for the molding lines. (Project Worth USD $ 3 Mio)
    4:Increased accountability and productivity of maintenance staff, reducing staffing requirements by 17 and improving equipment reliability.
    5:Kaizen team Manager delivering a 15% increase in productivity and reducing overall down time of the plant.
    6:Efficiently Managed USD 1 Mio annual maintenance budget and reduced by USD 100K equals 10% of the total previous USD 1.1 Mio.
    7:Introduced Technical spares consumption track record system and implemented 5S system.
    8:Installation, Commissioning and Testing for the pressurized water pipeline, Pump installation and automatic sprinkler system. (Safety Project Worth USD $ 200K)

Academic Qualification

Bachelor 24 February 2008

B.E MECHATRONICS AND CONTROL ENGINEERING WITH MAJOR PROJECTS MANAGEMENT (F & B)
Certifications
Recommend MUHAMMAD SHAHZAD SABIR
Related UserList of Members
Mentor
Liaqat Ali

Mechanical Enigeer
Abu Dhabi

Last Login: 22 December 2024 4:36 PM
Profile Answers
Related Professionals
Profession: Accountant
Current City: Bur Dubai

Profession: Internal Auditor
Current City: Dubai

Profession: Bussiness development officer
Current City: Abu dhabi

Profession:
Current City:

Profession: Sales Coordinator
Current City: Dubai

Profession: Merchandiser
Current City: Dubai