Summary of Career
Experience as : Electrical Engineer
20 September 2016
14 February 2018
• Involved in design and review of documents submitted by Vendor and Sub-contractor of Electrical System.
• Design and review of CP system Drawings and procedure.
• Review the documents of Instrumentation system.
• Review the Method statement and procedures of installation.
• Attend meeting with subcontractor & vendors of design issue and weekly progress.
• Observe & review the Progress measurement from Vendor/Subcontractor.
• Coordination on construction of Electrical system, CP System & Instrument System.
• Review the Daily, weekly and monthly reports.
• Approve the construction progress claim by vendor/subcontractor.
• Coordinate and resolve the issue in construction of vendors and subcontractors.
• Monitor daily progress of E & I construction on site.
• Attend meeting with client and report daily progress and construction issues.
• Invite and attend construction Inspection with client.
• Monitor, review and approve the construction documents (RFI, ITR, Redline drawings).
Experience as MEP Engineer
20 March 2018
• Monitoring all MEP networks aspects of the project to ensure compliance with approved and proper standards.
• Inspects and test MEP parts, assemblies and accessories prior to installation for conformance to specifications and quality standards.
• Liaising with the other Inspectors and Project Engineers to provide support and guidance as required.
• Review and monitor variations to the work to mitigate time and cost impacts for any required changes.
• Liaising with Client Representatives and Management to flag and rectify any issues which may arise.
• Inspection of works carried out by the contractor in respect of the works relative to MEP networks
• Manage safety aspects when dealing with MEP networks installations.
• Provide reports on the progress of the MEP networks aspects of the project.
• Expediting of NOCs from relevant authorities if they appear to be stalled or in delay.
• Expedition of approvals from the Project Engineer if it appears to be stalled or delaying the project.
• Monitor MEP installations to ensure that only approved materials are being used in the permanent works.
• Maintain registers of all submittals and testing, both on site and off site.
• Maintain full site records, including daily site diaries in an approved format, and formal monthly progress photography.
• Prepare reports related to inspections and quality of the works.
Bachelor 18 May 2009