Abdul basit
Electrical & Instrumentation Engineer
Islamabad
Summary of Career
1. Testing and commissioning of control system and power-up of control system. Testing of electrical and control panels and create as built drawing according to the field installed equipment’s & instruments. • Point to point testing
2. Configuration of I/O devices on DCS system Experion PKS 431.1. Configurations of assets. Import, exports and resorting of points. Creating custom display pages on an Experion system.
3. Inspection and verification of electrical & instruments field installations and testing of equipment including MV and LV Switchgears (Siemens Sivacon ), Power and Control cables, Grounding, Lighting
4. Calibration, Testing and commissioning of Fire and gas System
5. Create Instrument master index, I/O list, Instrument cable schedule, Instrument termination drawing, Instrument Junction boxes schedule, Instrument loop drawings, Field JB termination drawings, Hook up drawings, Main cable layout, Instrument trench and tray, layout, Instrument location layout
6. • Supervise and monitoring of Panel termination, field instrument termination and field Junction Box termination. • Also supervise & monitoring of Gas turbine driven compressor unit control panel, Load sharing management and Emergency shutdown panel. • Supervise and monitoring in the cold and hot loops testing of instrument and control cables. • Involved in pre commissioning and commissioning activities of Electrical and Instruments.
7. • Conducting daily progress meeting and its status with client. • Having good knowledge of plant safety rules & regulations. • Good knowledge about Permit to work systems (PTW). • Familiarity about several kind of Perilous involved in work area and essential safety measure to be done for the safe work.
8. Provide Technical assistance to Project team. Preparation and compilation of daily progress report.
9. CERTIFICATE IOSH Managing Safely UK From World Institute of Safety and Health (WISH) Islamabad
10. CERTIFICATE OSHAcademy (Occupational Safety & Health Training)in General Industry Safety and Health From World Institute of Safety and Health (WISH) Islamabad
Experience as Trainee Engineer
02 December 2014
28 February 2015
During my tenure in Zishan Engineering, I worked / familiar for the design of:
Instrument master index, I/O list, Instrument cable schedule, Instrument termination drawing, Instrument Junction boxes schedule, Instrument loop drawings, Field JB termination drawings, Hook up drawings, Main cable layout, Instrument trench and tray, layout, Instrument location layout, Control room equipment layout, Control room cabling layout, Hazardous area classification, Instrument data sheet, BOQ
Power and cable route layout, lighting layout, Earthing layout, Hazardous area classification layout, Single line diagram, Cable schedule, data sheet etc. Electrical equipment sizing i.e. Cable sizing, UPS sizing calculations, Generators sizing calculations, Transformer sizing, Earthing system calculations, Cable tray calculation.
Experience as Instrument & Control Engineer
Solutions Engineering Private Limited Lahore
15 March 2015
09 January 2016
Worked as Instrument and control Engineer on Dakhni Oil & Gas Field OGDCL Fire & Gas System installation.
Main responsibilities supervision of Installation of cable trays, laying and termination of cables from instrument to JB to Marshalling cabinet, Installation of H2S, HC, SO2, IR Flame detectors and Smoke detectors, Preparation of cable laying and cutting plan, Provide Technical assistance to Project team. Preparation and compilation of daily progress report.
Experience as E&I Engineer
01 February 2016
07 September 2017
Worked as Electrical and Instrument Engineer with NEW JCM at KPD-TAY Project Oil & Gas Field OGDCL.
Main responsibilities supervision and commissioning of Gas turbine driven Compressor are.
• Inspection and verification of electrical & instruments field installations and testing of equipment including MV and LV Switchgears (Siemens Sivacon ), Power and Control cables, Grounding, Lighting, Cable Trays work.
• Calibration of field instruments including pressure, temperature, level and flow transmitters etc.
• Involved in material inspection and handovering.
• Supervise and monitoring in Installation of all type of field instruments, devices & cables related to E&I and Fire and Gas System such as Transmitters, Indicators, Detectors, Alarms Beacons and manual call point Junction Boxes.
• Supervise and monitoring of Panel termination, field instrument termination and field Junction Box termination.
• Also supervise & monitoring of Gas turbine driven compressor unit control panel, Load sharing management and Emergency shutdown panel.
• Supervise and monitoring in the cold and hot loops testing of instrument and control cables.
• Involved in pre commissioning and commissioning activities of Electrical and Instruments.
Ensure that all activities on the site meet the environment and HSE standards applicable at the site.
• Reviewing of Schematic drawings, Layout Drawings & other construction drawings and Coordinate with client and consultant to resolve site technical issues.
• Preparing daily log sheets of gas turbine driven compressor and made daily Site Reports and circulate to client.
Experience as E&I Engineer
14 September 2017
30 September 2018
Worked as Electrical and Instrument Engineer with HBP China at NASHPA Project Oil & Gas Field OGDCL.
Main responsibilities supervision and commissioning of Gas processing Plant.
• Worked with Honeywell team on configuration of I/O devices on DCS system Experion PKS 431.1. Configurations of assets. Import, exports and resorting of points. Creating custom display pages on an Experion system. Calibration of HART devices on FDM (Field Device Management) system.
• Calibration, Installation and Commissioning of all the types of field instruments as per specification.
• Performing loop check, logic check, Cause & Effect check and Control Narrative checks.
• To implement and test a wide range of I/O in HART and Foundation field bus communications via Modbus, Profibus etc. control function, interlocks, sequences, operator interface and other control components on DCS, PLC and ESD.
• Inspection and verification of electrical & instruments field installations and testing of equipment including MV and LV Switchgears, Power and Control cables, Grounding, Lighting, Cable Trays work.
• Installation, calibration and Commissioning of Fire & Gas instruments (Toxic gas detectors, Flammable gas detectors, etc.)
• Conducting daily progress meeting and its status with client.
• Having good knowledge of plant safety rules & regulations.
• Good knowledge about Permit to work systems (PTW).
• Familiarity about several kind of Perilous involved in work area and essential safety measure to be done for the safe work.
Experience as Engineer I
16 November 2018
22 January 2019
Advance Technology Group Plant Automation (ATGPA)
Working as Instrument and Control Engineer at Techno Auto Glass Factory.
Main responsibilities testing and commissioning of control system and power-up of control system.
• Testing of electrical and control panels and create as built drawing according to the field installed equipment’s & instruments.
• Point to point testing.
• Online remote and soft I/O testing of PLC 5/20 PLC 5/80 and SLC 5/04.
• Established communication between PLC and system by using different protocols Ethernet TCP/IP ,
RS232, DH+ and Serial communication.
• Troubleshooting of controls systems & electrical wiring.
• Working knowledge of 24 V DC, 240V AC, 120V AC, and 480V AC electrical circuits.
• Conducting daily progress meeting and its status with team Leader.
• Having good knowledge of plant safety rules & regulations.
• Good knowledge about Permit to work systems (PTW).
Bachelor 27 June 2014
I have done my BS Electrical Engineering with 2.78/4.00 CGPA from HITEC University (Heavy Industries Taxila Education City) Taxila Pakistan