Ahmad Aizat Aqmal Bin Hishamuddin

Mechanical Piping Engineer
Miri


Profile Views 209

Recommendations (0)

Skills
HSE Awareness Microsoft Office
  • Experience
    6 Years
  • U.A.E Experience
    --
  • Industry
    Oil , Gas & Energy
  • Nationality
    Malaysian
  • Visa status
    Others
  • Qualification
    Bachelor - Graduation Day on the October 3rd. Major: Mechanical Engineering Technology.
  • Driving License:
Other Matching Titles/Position
Industry Titles
Oil , Gas & Energy

Summary of Career

1. 6 years of continuous experiences across industries which are both oil & gas upstream and downstream, also in fabrication and construction work in Malaysia.


2. Highly Motivated and Enthusiastic mechanical engineer and possess excellent communication and teamwork skills coupled with solid multitasking abilities.


3. Experienced in dealing with clients in project management to deliver the project smoothly, in both construction, maintenance and operations while delivering data in accordance to agreed terms.


4. Detail design Engineering


5. Fabrication


6. Construction Engineering


7. Pre-Comm – Mechanical


8. Comm – Mechanical


9. Procurement Activities


10. Major & Minor Services


Work Experience (Employment History)

Experience as Mechanical Piping Engineer

  • Employer

  • From

    17 December 2018

  • To

    31 December 2019

  • Detail

    1. Long-Bolts Check Valve Passive Fire Protection at Bayan, Temana & D18 (EPCC)
    2. Monitor progress on Long-Bolts Check Valve Passive Fire Protection at D35, D21 & J4
    3. Work Scoping of Crude Oil Transfer Pump (COTP) Mechanical Seal Piping
    4. Pipe spool modification and replacement on changes of metering device/equipment at Temana C, T & W.
    5. Coordination of contractor manpower loading arrangement to mobilize to respective southern field at SKO for work scoping for maintenance, repair and replace activity and turn around.
    6. Involved in Mechanical Static equipment repairing and replace on damages part, i.e. Pressure Vessel, Scrubber Filter and Scrubber Vessel at D35 during Turn-Around Shutdown.
    7. Monitored and Supervised Work pack preparation by contractor and ensure all the procedure follow as per ASME, PTS and CSP accordingly.
    8. Involved during interface with other department. I.e. Piping, MCI and etc.
    9. Involved and reviewed in Mechanical Static equipment repaired and replaced on damages part, i.e. Compressor Hex (cooler) at Tukau.
    10. Involved and reviewed in Mechanical Static equipment work pack preparation for repairing and replace on damages part, i.e. Pressure Vessel Nozzle repair and recalibration of relief valve at West Lutong.
    11. Reviewed work pack & procedures, get advice and approval by Technical Authority from Mechanical department and approval from Inspection Test Plan (ITP) from MCI department for turn around and maintenance activity.
    12. Involved and reviewed in Mechanical Static equipment repairing and replace on damages part, i.e. Pressure Vessel (V-400) at West Lutong.
    13. Joined site visit and discussed with third (3rd) Party / contractor on the future target date maintenance activity.
    14. Coordinated with contractor on the planning maintenance activity.
    15. Ensure contractor has established lifting plan.
    16. Fabrication of Piping spool – Material selection
    17. Witnesses and Verified of receiving material.
    18. Ensure all the preparation of mechanical equipment such as piping and vessel as per AFC/IFC drawings.
    19. Reviewed ITP and ensure for WPS, WQT, painting, etc. and ITP is approved by QAQC or MCI TP/TA.
    20. Reviewed hydro test pack submitted by contractor, ensure pressure as per project specification.
    21. Ensure all the flanges connection is align during the installation.
    22. Reviewed Hydro Testing procedure. Ensure test pressure, holding pressure, equipment
    for hydro testing setup as per project requirement or PTS/CSP require.
    23. Ensure flushing of the mechanical equipment completed prior to hydro testing and make sure no debris material occurs during hydro testing.
    24. Ensure contractor blow dry using air prior to pre-commissioning or commissioning and perform preservation.
    25. Ensure contractor develop preservation plan.

Experience as Mechanical Engineer

  • Employer

  • From

    05 February 2018

  • To

    14 December 2018

  • Detail

    Engineering
    • As a focal point for Mechanical Engineer – D28 Phase 1 & D18 Phase 2 Project.
    • Review on project specification and procedures.
    • Review and comments on Vendor drawing and documents.
    • Review and checking on Vendor Project Master Schedule and Project Deliverable Register.
    • Review and comments on Consultant on P&ID, TRP’s General Arrangement Drawing and etc.
    Procurement
    • Completed prepare and review the technical bid evaluations.
    • Interface with the procurement coordinator on the status of the technical package, inspection/test and vendor document requirements.
    • Coordinate a meeting or kick-off meeting with mechanical vendors for on all technical issues.
    • Reviewed, Commented, and approved all vendor documents. Incorporate client’s comments, if any.
    Construction & Installation
    • Monitored of EPCC sub-contractor's procurement of major mechanical equipment is in accordance with the agreed standard and specifications
    from clients.
    • Coordination’s with subcontractors and client on mobilization schedule and work progress
    • Reviewed and analyzed the designs of vendors or subcontractors providing specific equipment.
    • Interface with other disciplines (E&I, structural, process) and sub-contractor's Engineer as required for successful completion of projects.
    • Monitored and review the master G.A., P&ID, and equipment layout and etc. drawings on day by day basis to reflect work in progress and completed to reflect the as-built installation as the job progresses.
    • Monitor progress of onshore fabrication and installations works.
    • To assist with the coordination of onshore construction / installation works.
    • Performed line walk and check on the readiness of the Service Water Tank, Open Drain Tank, Crude Receiver and Closed Drain Vessel.
    • Monitored & reviewed lifting procedure and JHA reviewed, submitted the lifting procedure to client’s structural engineer for approval prior to lifting work.
    • Provide technical supports to fabrication team and to client’s package engineers.
    • Work closely with the project team in achieving common schedule/target of the project.
    • Interface fabrication works with other OMSB team members on all another aspect of the works like engineering, HSE, QA/QC and any other requirements to ensure smooth execution of the project.
    • Interface with fabrication team on daily fabrication activities.
    • Work closely with inspection team to meet QA/QC requirement as specified in the contract.

Experience as Mechanical & Commissioning Engineer

  • Employer

  • From

    14 November 2016

  • To

    02 February 2018

  • Detail

    Engineering
    • As a focal point for Mechanical Engineer – Anjung AJJT Project – A & E6 Development Project – A.
    • Review on project specification and procedures.
    • Review and comments on Vendor drawing and documents.
    • Review and checking on Vendor Project Master Schedule and Project Deliverable Register.
    • Review and comments on Consultant on P&ID, TRP’s General Arrangement Drawing and etc.
    • Participate in PDMS review.
    Procurement
    • Completed prepare and review the technical bid evaluations.
    • Interface with the procurement coordinator on the status of the technical package, inspection/test and vendor document
    requirements.
    • Coordinate a meeting or kick-off meeting with mechanical vendors for on all technical issues.
    • Reviewed, Commented, and approved all vendor documents. Incorporate client’s comments, if any.
    Construction & Installation
    • Monitored of EPCC and P&C sub-contractor's procurement of major mechanical equipment is in accordance with the agreed
    standard and specifications from clients.
    • Coordination’s with subcontractors and client on mobilization schedule and work progress
    • Reviewed and analyzed the designs of vendors or subcontractors providing specific equipment.
    • Interface with other disciplines (E&I, structural, process) and sub-contractor's Engineer as required for successful completion of projects.
    • Monitored and review the master G.A., P&ID, and equipment layout and etc. drawings on day by day basis to reflect work in progress and completed to reflect the as-built installation as the job progresses.
    • Monitor progress of onshore fabrication and installations works.
    • To assist with the coordination of onshore construction / installation works.
    • Performed line walk and check on the readiness of the HVAC, Pressure Vessel, Fresh Water Service Tank, and Chemical Injection
    skid.
    • Monitored & reviewed lifting procedure and JHA reviewed, submitted the lifting procedure to SSB’s structural engineer for approval prior to lifting work.
    • On-site verification of HVAC package mechanical work in progress and ensure contractors compliance to industry & SSB specifications and good construction workmanship.
    • On-site verification of chemical injection skids, pressure vessel package and fresh water service water tank mechanical work in progress and ensure contractors compliance to industry & SSB specifications and good construction workmanship.
    • Invited SSB personnel to performed and witness for an internal inspection for the chemical injection tanks skids, pressure vessels package and fresh water service water tank package prior to final closure and SAT.
    • Provide technical supports to fabrication team and to Shell’s package engineers.
    • Work closely with the project team in achieving common schedule/target of the project.
    • Interface fabrication works with other BDEWC team members on all another aspect of the works like engineering, contract,
    procurement, HSE, QA/QC and any other requirements to ensure smooth execution of the project.
    • Interface with fabrication team on daily fabrication activities.
    • Work closely with inspection team to meet QA/QC requirement as specified in the contract.
    Testing & Commissioning
    • Prepared and reviewed commissioning and precommissioning test procedures of mechanical equipment.
    • Liaise with HUC team regarding ITR A has to be done prior to pre-commissioning work.
    • Coordinated and performed a functional check on the system, endurance 4 hours of pumps for Chemical Injection and motor test
    prior to 72 hours endurance HVAC systems test.
    • Work closely with the contractor, review the needs for consumable and temporary equipment required for the commissioning work in onshore and offshore.
    • Completed on construction and pre – commissioning check sheet.
    • Conducted final line walk with HUC team to capture any outstanding construction and installation work prior to commissioning work.
    • Conducted and coordinated fabrication team for preservation once the commissioning works done. (Nitrogen blanketing)

Experience as Project Engineer

  • Employer

  • From

    02 November 2015

  • To

    11 November 2016

  • Detail

    1. Assigned as Project Engineer is responsible for the project aspect of the construction.
    2. To professionally perform site visit if and when required by the clients.
    3. Capability to communicate and reach an agreement with clients prior to project – smoothly.
    4. Ensure manpower, equipment, material and consumables are complete and functional prior to mobilization to the site.
    5. Ensure teams of machinist arrive at site timely as instructed by the client’s
    representatives.
    6. Lead machining activity at the site.
    7. Lead team for inspection to Company Representative.
    8. Liaised with technicians regards with the task given.
    9. Monitored and ensure technicians accomplished the task as client’s required.
    10.Liaised with QA/QC clients in resolving technical issues.
    11.Reviewed defects report from QA/QC client’s department.
    12.Liaised with clients Inspector from Velosi to proceed with the dye-penetrant test.

Experience as Production QC

  • Employer

  • From

    09 February 2015

  • To

    30 October 2015

  • Detail

    1. Assigned as Production QC is responsible to complete the task given during construction of the project.
    2. Assisted the QC inspector on documentation and hydro-testing as well as inspection for fit-up and visual for the pipeline.
    3. Reviewed all testing supporting documents such as leak test, hydro test package, reinstatement test package.
    4. Reviewed construction isometric drawing while witnessed and located the fabrication as well as installation process for the pipeline.
    5. Witness fabrication and installation for MVR, Fit-up, Visual Inspection and review all inspection report.
    6. Monitoring and maintain site quality including workshop fabrication, site
    installation and welding meet the project KPI and specification.
    7. Monitoring/witness for repair works.
    8. Review construction drawing (isometric/structure/NDE Drawing & matrix).
    9. Witness/monitoring testing and pre-commissioning works such as leak test, hydrotest, accessories installation, punch list prior commissioning.
    10.Review mechanical/piping check sheets and related supporting document meets the requirement, drawing and specification prior start up and commissioning.
    11.Reviewed and ensure piping check sheets specification prior start up and
    commissioning.
    12.Inspected, monitored and ensured site quality and daily progress including fabrication workshop, site installation process and welding spread meets client’s specification.
    13.Responsible for Health, Safety and Environment for platform topside works.

Experience as Field Engineer

  • Employer

  • From

    03 November 2014

  • To

    06 February 2015

  • Detail

    Participated in tender preparation and documentation for;
    1. Non-Metallic Pipe for Offshore Pipeline and Riser. Provision of Pipeline Tie-in and Precommissioning.
    2. PETRONAS RAPID Project (Refinery and Petrochemical Integrated Development).
    3. Pre-Qualification exercise – provision of transportation and installation services for guntong-c to tapis-q pipelay (2016) (ExxonMobil).
    4. LCOT Effluent Discharge Pipeline Replacement Project (SHAHPADU ENERGY AND ENGINEERING SDN.BHD).
    5. Pre-Qualification - Transportation and Installation of Offshore Facilities – KINABALU KNPG-B Module 6 (PETRONAS CARIGALISDN.BHD).

Experience as Production QC

  • Employer

  • From

    07 February 2011

  • To

    31 August 2011

  • Detail

    1. Assigned as Production QC is responsible to complete the task given during construction of the project.
    2. Assisted the QC inspector on documentation and hydro-testing as well as inspection for fit-up and visual for the pipeline.
    3. Reviewed all testing supporting documents such as leak test, hydro test package, reinstatement test package.
    4. Reviewed construction isometric drawing while witnessed and located the fabrication as well as installation process for the pipeline.

Academic Qualification

Bachelor 03 October 2015

Graduation Day on the October 3rd. Major: Mechanical Engineering Technology.
Certifications
Recommend Ahmad Aizat Aqmal Bin Hishamuddin
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Engineering
Current City: 0

Profession: MECHANICAL ENGINEER
Current City: ABU DHABI

Profession: Project coordinator - Document Controller
Current City: Abu Dhabi

Profession: Mechanical Engineer
Current City:

Profession: Chartered Accountant
Current City: Dubai

Profession:
Current City: Karachi