Muhammad Ibrahim

Engineer
Abu Dhabi


Profile Views 259

Recommendations (0)

Skills
Good at absorbing information analyzing problems and coming up with ideas. Ability to travel over the globe and work in mobile areas/fields. Have the drive confidence and resilience to get things done. Self-motivated and committed to continual improveme
  • Experience
    8 Years
  • U.A.E Experience
    --
  • Industry
    Oil , Gas & Energy
  • Nationality
    Pakistani
  • Visa status
    Visit Visa in UAE
  • Qualification
    Bachelor - Metallurgical & Materials Engineering
  • Driving License: Yes UAE
Other Matching Titles/Position
Industry Titles
Oil , Gas & Energy

Summary of Career

1. Well experience in Controlling, Operating and monitoring, Testing and Commissioning of mechanical Equipment’s and Performance test.


2. Having good experience of covering Process and Utility Piping, Pipeline, Storage Tanks, Welding,


3. Onshore installations both in new construction as well as in maintenance inspection


4. Extensive quality management experience in Oil & Gas within multinational work environments.


5. Extensive experience of inspection at vendors works to ensure that equipment’s and material Is manufactured as per specified requirements and is delivered as per schedule.


6. Possess good interpersonal skills combined with the ability to communicate at all levels together with A flexible ‘hands on’ approach to problem solving, whilst retaining a strong management approach to


7. Plans/schedule and coordinate in Maintenance of the Mechanical System, Fire Fighting, HVAC works as Per companies & Manufacture’s standard.


8. Preparation of Material take offs (MTO) along with Technical specification & relevant codes & standards During Breakdown maintenance of equipment has & allied system, Process said MTO’s to procurement Department.


9. Inspection and supervision of project work team, contractors in punch listing, loop testing, pre- Commissioning, Commissioning & hand over


10. inter-discipline coordination, administration and resource planning. Holds the distinction of executing numerous prestigious projects of large magnitude within a strict time schedule and cost & quality control.


Work Experience (Employment History)

Experience as Mechanical Engineer

  • Employer

  • From

    10 January 2013

  • To

    31 December 2013

  • Detail

    Supervise and control of the status and progress of the installation activities and of the related documents.
    Preparing and monitoring of work instructions ensuring quality work attained from assigned staff.
    Immediately inform of any observed hazards, injuries or dangerous occurrences, which become apparent
    Create and promote a continuous improvement approach among the team members.
    Performs other responsibilities associate with this position during construction.
    Familiar with different international standards and specifications.
    P&ID check for system readiness for mechanical completion, punch list, co-ordination of mechanical completion i
    Accordance with the procedures.
    Review of “As built” drawing to reflect changes implemented during commissioning activities also compilations
    & confirming of completed Punch List items, participate in demonstration handover/ acceptance of system to the
    Operation group (Client).
    Supervising various discipline technicians in completing the commissioning activities which promoting safe
    Working practice in line with the safety management system
    Ensure compliance with QA/QC procedures, ITP and Method Statements and ensure all tests are carried out as
    Per Contract requirements.
    Review method statements & procedures as per the Job Specification/ Client / Code requirements.
    Witnessing of Welder Performance Qualification Test (WPQT) and Preparation of welders certificate and
    Checking for consistency with piping and instrument diagram (P&ID).
    Inspection of equipment is according to the specification, types, direction, tag number and size of valves, flow instruments, orifice, etc.
    Responsible for Piping erection operations and pipe supports installation in accordance with schedule, Procedures, Specifications and Priorities.
    Ensure the Productivity and subordinates Coordinate with other Disciplines at site maintain Quality.
    Carrying out final P&ID check of installed piping systems in the module.
    Carry out hydro testing, leak testing, and pneumatic testing.
    Supervise pre-commissioning work such as pressure testing, flushing, cleaning and air blowing etc.
    Supervise and inspect chemical cleaning work(cleaning ,flushing, greasing )
    `
    Muhammad Ibrahim Page 5 of 5
    Organizes plans for execution of Pre-commissioning / commissioning activities.

Experience as Mechanical Engineer

  • Employer

  • From

    01 February 2014

  • To

    28 February 2015

  • Detail

    Review day-to-day site work in coordination with the EPC contractor; provide a daily log of site activities, Work Progress, problems and issues needing resolution.
    P&ID check for system readiness for mechanical completion, punch list, co-ordination of mechanical
    Completion in accordance with the procedures.
    Compiling “As built” drawing to reflect changes implemented during commissioning activities also
    Compilations & confirming of completed Punch List items, participate in demonstration handover/
    Acceptance of system to the Operation, group (Client).
    Involved in joint inspection with client in order to satisfy the project standard, safety, performance &
    Legislative Requirement before ready for start up
    Supervising various discipline technicians in completing the commissioning activities which promoting safe Working practice in line with the safety management system
    Review ITP & procedures as per the Job Specification/ Client / Code requirements.
    Witnessing of Welder Performance Qualification Test (WPQT) and Preparation of welder’s certificate and ID.
    Checking for consistency with piping and instrument diagram (P&ID).
    Inspection of equipment is according to the specification, types, direction, tag number and size of valves, Flow Instruments, orifice, etc.
    Preparation of TQs/Comments on the Vendor Documents (Equipment Drawing, Spring Support Drawing

Experience as Mechanical Engineer

  • Employer

  • From

    01 March 2015

  • To

    30 May 2015

  • Detail

    Train-1 Major Shut down GASCO ASAB- 1&2 Abu Dhabi UAE.
    Pre inspection (inspection findings) of equipment’s upon opening of (Heat Exchanger, Vessels, Drums, Columns, Air fan coolers, Tanks, Boilers, Filters)
    Post cleaning inspection after Hydro jetting and mechanical cleaning or any cleaning method.
    Hydro-jetting Inspection as per required pressure.
    Hydro Testing of Heat exchangers, (shell side, tube side, shell side with test ring) Air fan coolers
    Vessels, Columns, Tanks internal inspection (Demisters, Trays, man ways, and internals)
    Box up clearance certification from process, inspection and operations after completions of all inspections of Equipment’s.
    Piping modification (Cut & weld job, Valve replacement)
    WPS & PQR preparation, Approvals, and implementations.

Experience as Mechanical Engineer

  • Employer

  • From

    01 June 2015

  • To

    31 August 2016

  • Detail

    Commissioning of mechanical equipment (Rotating & Static) with respect to project approved
    Schedule.
    Resolve problems and issues along the worksite. Ensure that acceptable level of safety, quality
    & productivity is maintained on the worksite and assure that project requirements are achieved.
    Review engineering documents, method statements, and design changes as per ADCO
    Specifications & International standards. Assist; participate as a focal person on system final
    Walk down.
    Checking the preliminary alignment of motor-machine for rotating equipment’s when the
    Machinery is installed on the foundation, before the grouting. Ensuring that strains imposed by
    The piping on the machinery are minimized and are in accordance with the contract
    Specifications, vendor’s requirements or with the API 686 tolerance.
    Installation/Erection of all types of Pumps i.e. centrifugal, vertical, positive displacement.
    Inspection graphical alignment and verticality level of all equipment
    Supervised & Inspection of all alignment phases of rotating equipment.
    Alignment of pump and motor (driver and driven), compressors recommended alignment
    Methods.
    Checking/monitoring Coupling & coupling guard Installation.
    Ensuring the proper connectivity of required associated piping as per P & ID.
    Checking the suction and discharge lines as per P & ID. Seal system & Lube oil system check.
    Ensuring and inspection of strainers and valves associated with the rotary equipment.
    Kick off Meeting holding with rotating equipment manufacturer.
    Ensure that all activities are carried out as per approved drawings and project specifications
    & procedures.
    Provide technical support for all engineering/Construction activities to facilitate continuous
    Improvement of maintainable assets, following Safety Guidelines defined for the relevant system. Participations on trainings and several technical meeting.
    Inspection of package skid leveling, centering check, Elevation check
    Having a Good approach of Measuring and Precession Tools.
    Review & approval of Method Statements.
    Performing Audit on contractor & Subcontractor.
    Regular meetings with Contractor & Subcontractors.
    Verify the availability of material records & quality certificates.
    Operations Support Activities:
    Analyzing the problem accruing during operations of rotary equipment for troubleshooting.
    Troubleshooting of machinery issues along with ADCO maintenance team.
    Supervised routine preventive maintenance in ADCO compression stations i.e. cs-1, 2, 3.
    Support to ADCO operations process team for commissioning & start-up of new constructed

Experience as Mechanical Engineer

  • Employer

  • From

    05 September 2016

  • To

    30 September 2019

  • Detail

    Managed Quality control and Quality assurance activities of the project and detail elaborated.
    ADOC - Abu Dhabi Oil Company as the Lead Offshore Client Rep. for the installation of 10km
    Pipelines and 1 fiber optic power cable on-board the installation barge, Regina 250, for the
    Hail Surface Facilities EPS Project. Installation includes trenching/dredging of shore approaches
    6 shore pulls, mid water tie-ins, Mattress installation, back filling of shore approaches,
    As laid surveys and pre-commissioning (cleaning Gauging, hydro test, de watering) of Pipeline.
    Erection of 10 km Undersea pipeline 18”8”6” from Mubarraz island to Hail Island.
    Erection of Undersea piping 18” 8”6” for well pad and modules Inter connection.
    Erection of Aboveground piping 18” 8”6” for well pad and modules Inter connection.
    Installation of modules for inters connection piping from well Pad A & B.
    Monitoring the Modules inter connection fit up, welding, NDT, and Hydro test.
    Erection of steel structure for Well Pad A & B and its related piping inter connection.
    Erection of firewater tank for water storage and related inter connection Piping and Nozzle.
    Monitoring the Fire Water Tank inter connection fit up, welding and NDT.
    Inspection of Plumpness, peaking, banding, vacuum box test, winds Grader, Curb angle
    Erection of steel structure shelter for firewater pump.
    Monitoring firewater pump shelter activities and Monitoring overpass erection activities.
    Monitoring the different Chemical Injection skids (Xylene, corrosion inhibitor, methanol
    Demulsifier) during installation and inspection for functional/ Operational test
    Install the different static equipment -Vessel, close drain drum, pig launcher.
    Monitoring the welding & NDT activity for onshore pipeline works.
    Inspection of Valves, fittings & Pipes, Structure & Plates and verify MTCs of in-coming material in
    Ware house.
    Reviewing complete test packages as per P&ID and Isometric, welding summary, NDT reports, check
    List and all required attachments.
    Serve as primary interface with Contractor Vessel Superintendent.
    Responsible for on-vessel safety, quality, and incident response support.
    Daily communication with ADOC Offshore Manager with respect to offshore execution activities.
    Ensure Contractor work and safety management systems are followed.
    Ensure implementation of mitigation measures identified in Risk Assessments.
    Oversee contractor adheres to approved procedures and ensure MOC process is implemented.
    Steward implementation of site safety, quality, and emergency response plans.
    Monitor vessel condition/readiness Monitor contractor performance.
    KPI Dashboard, and Audit schedule, ITPs etc.
    Monitoring & Inspection of Offshore pipeline activities.
    Final review of dossiers with EPC Contractor Punch list.
    Final Inspection for overall Facility before hand over to client.

Academic Qualification

Bachelor 31 December 2012

Metallurgical & Materials Engineering
Certifications
Recommend Muhammad Ibrahim
Related UserList of Members
Mentor
Liaqat Ali

Instrument & Electrical Designer
Abu Dhabi

Last Login: 17 November 2024 11:27 AM
Profile Answers
Related Professionals
Profession: QHSE Manager
Current City: Abu Dhabi

Profession: Instrument Technician
Current City: Jubail

Profession: Health and Safety
Current City: Dubai

Profession: ELECTRICAL ASSOCIATE ENGINEER
Current City: DAMMAM SAUDI ARABIA

Profession: Welder
Current City: Abu Dhabi

Profession: qa/qc
Current City: Trichy