Furrukh Perwaiz
Electrical Engineering
Faisalabad Pakistan
Summary of Career
1. Heading the connections section (industrial/commercial) dealing with housing colonies, industries, plazas, and commercial markets
2. Practically handling all planning and design activities including Site surveys, sketch estimations, load verifications, load flow studies, financial analysis, and all formal paperwork relating to new connections, extensions/reductions of load, change of name, and shifting of connections
3. Working within the whole FESCO Company, comprising of 8 Districts, for capacity above 500 KW
4. Planning and Design of FESCO Energy Loss Reduction worth above 18 Billion Pakistani Rupees and FESCO Distribution of Power Projects worth over 6.8 Billion Pakistani Rupees
5. Streamlined the Connections Section of the Planning and Design Office FESCO to increase its efficiency by 50%
6. Supervise & Manage the overall status of connection section
7. Working with 6 subordinates including officers & officials
8. Managing the preparation of presentations and reports submitted by connection section
9. Assisting the Planning & Design Office wherever and whenever necessary.
10. Managing all correspondence (e-mail, letters, packages etc.) to & from, of the connection section.
Experience as Assistant Manager (Operations)
Faisalabad Electric Supply Company
12 November 2015
31 December 2021
Working under the direct command of the company’s highest management for distribution system operation and maintenance of the assigned sub-division office
Proper accounting and review of revenue inflows of divisions and subdivisions related to FESCO targets
Managing continuity of supply and smooth flow of revenues to the company
Identifying system constraints and removing them efficiently
Achieving all the targets set by authority (NEPRA and Ministry of Power) regarding line losses, targeted recovery, and billing accuracy up to 100%
Managing 100+ officials under the command
Dealing with all the Legal as well as administration issues of subdivision
Ensuring Safety protocols before, during, and after the work
Surveillance duties to eradicate pilferage of energy along with concerned authorities of the area including Police, Regional Task Force, Surveillance and Intelligence teams, etc.
Experience as Assistant Director (Planning & Design)
Faisalabad Electric Supply Company
03 January 2022
To date
• Heading the connections section (industrial/commercial) dealing with housing colonies, industries, plazas, and commercial markets
• Practically handling all planning and design activities including Site surveys, sketch estimations, load verifications, load flow studies, financial analysis, and all formal paperwork relating to new connections, extensions/reductions of load, change of name, and shifting of connections
• Working within the whole FESCO Company, comprising 8 Districts, for a capacity above 500 KW
• Planning and Design of FESCO Energy Loss Reduction worth above 18 Billion Pakistani Rupees and FESCO Distribution of Power Projects worth over 6.8 Billion Pakistani Rupees
• Streamlined the Connections Section of the Planning and Design Office FESCO to increase its efficiency by 50%
Bachelor 31 August 2014
Bachelor of Science in Electrical Engineering Institute: University of Engineering and Technology Lahore, Pakistan CGPA: 3.25/4.00 Specialization in Electric Power Distribution SystemsIntermediate 31 March 2010
Marks 946/1100 Superior College for Boys, Faisalabad Board of Intermediate and Secondary Education FaisalabadMatric 31 March 2008
Marks 748/850 La Salle High School, Faisalabad Board of Intermediate and Secondary Education Faisalabad