Unnikrishnan Govindapillai

Project Planning Manager/Lead /Sr.Planner
Doha, Qatar


Profile Views 35

Recommendations (0)
Last Seen: 26 January 2023 9:55 PM

Skills
Primavera P6 (All Versions) Microsoft Excel Microsoft Word Microsoft Power Point MS Power B I EOT Analysis MS Project AutoCAD FIDIC Asta Powerproject TILOS 4D Scheduling Project Planning Project Management Earned Value Management (EVM) CPM Scheduling Prog
  • Experience
    More than 15 Years
  • U.A.E Experience
    7 Years
  • Industry
    Contracting /Construction
  • Nationality
    Indian
  • Visa status
    Others
  • Qualification
    Master - MBA in Project management
  • Driving License: UAE, QATAR, India
Other Matching Titles/Position
NULL
Industry Titles
Contracting /Construction
Contracting /Construction
Contracting /Construction

Summary of Career

1. Prepare Cost, Resource and Quantity loaded the Contractual construction program and performs Critical Path Analysis


2. Review Design Deliverables prepared by the Design Consultant and review design program / Review design Progress


3. Prepare All Reports for the Engineer and Internal for Civil, Infrastructure and MEP & Review all reports prepared by Planning engineers and Junior Planners


4. Review and Approve Subcontractors Programs for Process (Oil Refinery, Sugar Refinery, Rice Processing), Civil, Infra and MEP


5. Update project schedule for weekly & monthly report for Project Management reporting , Analyze report against current Baseline schedule, Prepare Presentation for the Client and Higher Management


6. Prepare S-Curve and Manpower Histogram , Establish and Monitor Project Controls KPI’s , Providing Look Ahead Schedules on a regular basis and analyze the Delay


7. Procurement planning for short and long lead items and analyze the status reports against the Construction Schedules and review them with the Team


8. Progress Measurement System (PMS), Dashboard and analyzing the progress daily, weekly & monthly for the management & to the client., Develop Action and Recovery Plans to support project delivery on time , Earned Value Management and analyzing CPI & SPI


9. Perform Project EOT Analysis using TIA and Time Slice Windows Analysis


10. Liaise with Quantity Surveyor in respect of monitoring cash flow and preparation and updating of cash flow forecasts, Evaluating Subcontractors invoices and issue payment certificates


Work Experience (Employment History)

Experience as Marketing Executive

  • Employer

    Broose & Brooske Pvt Ltd

  • From

    10 April 1995

  • To

    10 March 1996

  • Detail

    Marketing of mechanical products. Companies visited are Titan Industries and HAL

Experience as Production Engineer

  • Employer

    Harsha Wheel Movers Pvt Ltd

  • From

    09 April 1996

  • To

    10 March 1997

  • Detail

    Supervision, quality checking & inspection of the mechanical & fabrication works of Hi-tech buses and other wheel movers body building

Experience as Software Engineer /Customer Support Engineer

  • Employer

    Absolute Infotech Pvt Ltd

  • From

    10 June 1997

  • To

    10 January 1999

  • Detail

    Software development for different clients using VB 5.0/ 6.0, ASP, SQL Server 6.0/7.0,2000, MS Access

Experience as Mechanical Engineer

  • Employer

    Chithaary Constructions

  • From

    10 March 1999

  • To

    10 September 2002

  • Detail

    • Prepare the project schedule in Excel and monitor the progress
    • Prepare all Reports for Management and Client

Experience as Planning Engineer

  • Employer

    Sensaire Electromechanical LLC (Now Horizon gulf)

  • From

    10 March 2003

  • To

    05 May 2005

  • Detail

    Responsibilities

    • Update the approved Contractual construction program on regular basis and assess the delay against the Baseline
    • Develop recovery & revised schedules
    • Prepare All weekly & Monthly Reports for the Engineer, Client, and Management
    • Prepare S-Curve, Manpower Histogram & KPI’s

Experience as Planning Engineer

  • Employer

    Dutco Balfour Beatty LLC

  • From

    10 May 2005

  • To

    05 August 2008

  • Detail

    Projects:
    1. Downtown, Jebel Ali, 2B+G+2P+15 floors, 4 Commercial
    Buildings
    2. Gold Crest Views Plot C2, JLT, 5B+G+41 floor residential
    & Commercial tower)
    3. WS Atkins office building project, 7 floors
    4. DUTCO Headquarters building project, 12 floors
    5. Jadaf Residential Building Project, 8 floors
    6. Gold Crest Residential Tower V2, 4B+G+40 floors
    7. Millennium Tower, 60 floor residential building + 8 floors
    (16 level) parking

Experience as Senior MEP Planning Engineer

  • Employer

    Al Naboodah Construction Group LLC

  • From

    10 August 2008

  • To

    01 October 2009

  • Detail

    Projects
    1. Different contracts in Dubai World Central International (Al Maktoum International Airport) Airport Project
    2. Dubai Police Force Staff Accommodation, G+5 floor ,11
    buildings
    3. Parallel Road 3B & Contract 4, Al Khail Road Widening
    4. Global Village District Cooling, Infrastructure

Experience as Senior Planning Engineer

  • Employer

    Rotary /Hastie (JV)

  • From

    10 October 2009

  • To

    03 June 2010

  • Detail

    Projects:
    1. Aircraft Wash Apron – CP10, Qatar Civil Aviation
    2. Robotic Centre, Qatar Foundation
    3. Traders Hotel, West Bay, Doha
    Responsibilities
    • Prepare & Update the Contractual construction program
    • Develop recovery & revised schedules
    • Prepare All weekly & Monthly Reports for the Engineer, Client, and Management
    • Prepare S-Curve, Manpower Histogram & KPI’s

Experience as Senior Project Planner

  • Employer

    Construction Development Company (CDC)

  • From

    10 June 2010

  • To

    10 September 2017

  • Detail

    Project #01: Hamad Port HPP47– Centralized Customs Inspection Area
    Project Description: The CCIA of Hamad Port comprises state-of-art inspection facilities with automated entry and exit gates with high-end container scanning technology that radically reduces the processing time for each container
    18 buildings, 10 utility buildings (total building area- 73819 M2), Infrastructure Wet & Dry Utilities, Roadworks & Landscaping (310,890 M2)
    Project#02: QF Offsite Warehouse & Distribution Centre Project
    Project Description: Design (of the Pre-engineered structure), Procurement, Construction, Testing and Commissioning of the State-of-the-Art Warehouse and related facilities,
    Scope of Work: The Medical Warehouse (Warehouse 1) ,The General Warehouse (Warehouse 2) ,The Common Facilities, Ancillary Facilities / Buildings, Landscaping Works
    Project #03: St:Regis Hotel & Residential Tower ,West Bay Doha
    Project Description: Construction, Commissioning and Hand Over of A Circular Residential Tower (B+G+M+20), Twin Residential Towers(B+G+M+18), A 5-star Hotel (B+G+M+12)
    Scope of Work: 175,000 m2 Buildings and 65,000 m2 Common Basement Car Park

Experience as Project Planning Manager/Lead/Senior Planner/ Delay Analyst

  • Employer

    Al Jaber Engineering

  • From

    27 December 2017

  • To

    14 January 2023

  • Detail

    Project 1: Diar Ras Al Hadd Development Project, OMAN
    Project Description: Construction of Hospitality Development of 200 Keys 5* Luxury Hotel, 50 Keys Chedi Villas, Luxury Spa, Beach Club and Associated Infrastructure Works

    Project 2: Central Doha & Corniche Beautification –Package -2A
    Project Description: Design and Construction of Ø3000 Storm water Micro Tunnel Construction of Storm water Attenuation Tank and Pump Station, New Sea Outfall Structure, Rising Main, Construction of Pedestrian Underpass and other Dry and Wet utilities, Road works includes granite works.

    Project 3: Hamad Port NPP0085– Strategic Food Security Facility
    Project Description: The project consists of specialized facilities for processing, manufacturing and refining rice, raw sugar, and edible oils. and conveyance equipment, in addition to fundamental structures equipped for the associated operations of handling, processing, packaging, reloading and transport. These products will be available for local, regional, and global use. The project also includes bulk storage silos with the associated infrastructure works.
    Total building area- 178221 M2(74 Buildings), 300,000 M2 (Infrastructure Wet & Dry Utilities, Roadworks & Landscaping)

    Project # 4: Hamad Airport HIAEP 0014– Remote Transfer Baggage Facility Building
    Project Description: The Remote Transfer Baggage Facility (RTBF) is planned to accommodate baggage-handling requirements with a transfer time of more than 3 hours. The baggage meeting these criteria will be temporarily stored in the RTBF to minimize congestion in the terminal building
    Total building area- 27,000 M2 & Infrastructure Works

Academic Qualification

Master 10 August 2017

MBA in Project management

Bachelor 10 August 1996

Bachelor of Engineering in Mechanical Engineering
Certifications

UPDA

  • Duration
    3
  • Description
    UPDA Grade A

Expert Certified Construction Delay Analyst

  • Duration
    Not applicable
  • Description
    ECCDA (UK)

Project Management Professional (PMP)

  • Duration
    3 years
  • Description
    PMP
Recommend Unnikrishnan Govindapillai
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: ACCOUNTANT
Current City: ABU DHABI

Profession: Planning Engineer
Current City: Dubai

Profession: Electrical Engineer
Current City: Karachi

Profession: civil engineering(degree)
Current City: abhu dabhi

Profession: Engineer
Current City: dubai

Profession: Sr.Document Controller
Current City: Dubai