Unnikrishnan Govindapillai
Project Planning Manager/Lead /Sr.Planner
Doha, Qatar
Summary of Career
1. Prepare Cost, Resource and Quantity loaded the Contractual construction program and performs Critical Path Analysis
2. Review Design Deliverables prepared by the Design Consultant and review design program / Review design Progress
3. Prepare All Reports for the Engineer and Internal for Civil, Infrastructure and MEP & Review all reports prepared by Planning engineers and Junior Planners
4. Review and Approve Subcontractors Programs for Process (Oil Refinery, Sugar Refinery, Rice Processing), Civil, Infra and MEP
5. Update project schedule for weekly & monthly report for Project Management reporting , Analyze report against current Baseline schedule, Prepare Presentation for the Client and Higher Management
6. Prepare S-Curve and Manpower Histogram , Establish and Monitor Project Controls KPI’s , Providing Look Ahead Schedules on a regular basis and analyze the Delay
7. Procurement planning for short and long lead items and analyze the status reports against the Construction Schedules and review them with the Team
8. Progress Measurement System (PMS), Dashboard and analyzing the progress daily, weekly & monthly for the management & to the client., Develop Action and Recovery Plans to support project delivery on time , Earned Value Management and analyzing CPI & SPI
9. Perform Project EOT Analysis using TIA and Time Slice Windows Analysis
10. Liaise with Quantity Surveyor in respect of monitoring cash flow and preparation and updating of cash flow forecasts, Evaluating Subcontractors invoices and issue payment certificates
Experience as Marketing Executive
Broose & Brooske Pvt Ltd
10 April 1995
10 March 1996
Marketing of mechanical products. Companies visited are Titan Industries and HAL
Experience as Production Engineer
Harsha Wheel Movers Pvt Ltd
09 April 1996
10 March 1997
Supervision, quality checking & inspection of the mechanical & fabrication works of Hi-tech buses and other wheel movers body building
Experience as Software Engineer /Customer Support Engineer
Absolute Infotech Pvt Ltd
10 June 1997
10 January 1999
Software development for different clients using VB 5.0/ 6.0, ASP, SQL Server 6.0/7.0,2000, MS Access
Experience as Mechanical Engineer
Chithaary Constructions
10 March 1999
10 September 2002
• Prepare the project schedule in Excel and monitor the progress
• Prepare all Reports for Management and Client
Experience as Planning Engineer
Sensaire Electromechanical LLC (Now Horizon gulf)
10 March 2003
05 May 2005
Responsibilities
• Update the approved Contractual construction program on regular basis and assess the delay against the Baseline
• Develop recovery & revised schedules
• Prepare All weekly & Monthly Reports for the Engineer, Client, and Management
• Prepare S-Curve, Manpower Histogram & KPI’s
Experience as Planning Engineer
Dutco Balfour Beatty LLC
10 May 2005
05 August 2008
Projects:
1. Downtown, Jebel Ali, 2B+G+2P+15 floors, 4 Commercial
Buildings
2. Gold Crest Views Plot C2, JLT, 5B+G+41 floor residential
& Commercial tower)
3. WS Atkins office building project, 7 floors
4. DUTCO Headquarters building project, 12 floors
5. Jadaf Residential Building Project, 8 floors
6. Gold Crest Residential Tower V2, 4B+G+40 floors
7. Millennium Tower, 60 floor residential building + 8 floors
(16 level) parking
Experience as Senior MEP Planning Engineer
Al Naboodah Construction Group LLC
10 August 2008
01 October 2009
Projects
1. Different contracts in Dubai World Central International (Al Maktoum International Airport) Airport Project
2. Dubai Police Force Staff Accommodation, G+5 floor ,11
buildings
3. Parallel Road 3B & Contract 4, Al Khail Road Widening
4. Global Village District Cooling, Infrastructure
Experience as Senior Planning Engineer
Rotary /Hastie (JV)
10 October 2009
03 June 2010
Projects:
1. Aircraft Wash Apron – CP10, Qatar Civil Aviation
2. Robotic Centre, Qatar Foundation
3. Traders Hotel, West Bay, Doha
Responsibilities
• Prepare & Update the Contractual construction program
• Develop recovery & revised schedules
• Prepare All weekly & Monthly Reports for the Engineer, Client, and Management
• Prepare S-Curve, Manpower Histogram & KPI’s
Experience as Senior Project Planner
Construction Development Company (CDC)
10 June 2010
10 September 2017
Project #01: Hamad Port HPP47– Centralized Customs Inspection Area
Project Description: The CCIA of Hamad Port comprises state-of-art inspection facilities with automated entry and exit gates with high-end container scanning technology that radically reduces the processing time for each container
18 buildings, 10 utility buildings (total building area- 73819 M2), Infrastructure Wet & Dry Utilities, Roadworks & Landscaping (310,890 M2)
Project#02: QF Offsite Warehouse & Distribution Centre Project
Project Description: Design (of the Pre-engineered structure), Procurement, Construction, Testing and Commissioning of the State-of-the-Art Warehouse and related facilities,
Scope of Work: The Medical Warehouse (Warehouse 1) ,The General Warehouse (Warehouse 2) ,The Common Facilities, Ancillary Facilities / Buildings, Landscaping Works
Project #03: St:Regis Hotel & Residential Tower ,West Bay Doha
Project Description: Construction, Commissioning and Hand Over of A Circular Residential Tower (B+G+M+20), Twin Residential Towers(B+G+M+18), A 5-star Hotel (B+G+M+12)
Scope of Work: 175,000 m2 Buildings and 65,000 m2 Common Basement Car Park
Experience as Project Planning Manager/Lead/Senior Planner/ Delay Analyst
Al Jaber Engineering
27 December 2017
14 January 2023
Project 1: Diar Ras Al Hadd Development Project, OMAN
Project Description: Construction of Hospitality Development of 200 Keys 5* Luxury Hotel, 50 Keys Chedi Villas, Luxury Spa, Beach Club and Associated Infrastructure Works
Project 2: Central Doha & Corniche Beautification –Package -2A
Project Description: Design and Construction of Ø3000 Storm water Micro Tunnel Construction of Storm water Attenuation Tank and Pump Station, New Sea Outfall Structure, Rising Main, Construction of Pedestrian Underpass and other Dry and Wet utilities, Road works includes granite works.
Project 3: Hamad Port NPP0085– Strategic Food Security Facility
Project Description: The project consists of specialized facilities for processing, manufacturing and refining rice, raw sugar, and edible oils. and conveyance equipment, in addition to fundamental structures equipped for the associated operations of handling, processing, packaging, reloading and transport. These products will be available for local, regional, and global use. The project also includes bulk storage silos with the associated infrastructure works.
Total building area- 178221 M2(74 Buildings), 300,000 M2 (Infrastructure Wet & Dry Utilities, Roadworks & Landscaping)
Project # 4: Hamad Airport HIAEP 0014– Remote Transfer Baggage Facility Building
Project Description: The Remote Transfer Baggage Facility (RTBF) is planned to accommodate baggage-handling requirements with a transfer time of more than 3 hours. The baggage meeting these criteria will be temporarily stored in the RTBF to minimize congestion in the terminal building
Total building area- 27,000 M2 & Infrastructure Works
Master 10 August 2017
MBA in Project managementBachelor 10 August 1996
Bachelor of Engineering in Mechanical EngineeringUPDA
Expert Certified Construction Delay Analyst
Project Management Professional (PMP)