Muhammad Kashif Iqbal
Dubai
Summary of Career
1. Ensure all technical aspects of the projects are strictly complied with and in conformity with Conditions of Contract, Particular Specifications, General Specifications, and Contract Drawings & BOQ.
2. Ensure all technical aspects of the projects are strictly complied with and in conformity with Conditions of Contract, Particular Specifications, General Specifications, and Contract Drawings & BOQ.
3. Responsible for managing a Staff/Labor in the project.
4. To evaluate the requirement of all project resources (materials, machinery, manpower) as per schedule and arrange for the availability of the same.
5. Planning and scheduling of resources (material, manpower etc.) Resources Mobilization.
6. Review of design drawings, Technical Co-ordination meetings, Minutes of meetings.
7. Lead the team of technicians and supervisors to effectively perform the projects
8. To ensure a successful completion of the Project within the budget and on time
9. .
10. .
Experience as Electrical Site Engineer
Paragon Constructors Pvt. Ltd Lahore.
01 June 2019
To date
Ensure all technical aspects of the projects are strictly complied with and in conformity with Conditions of
Contract, Particular Specifications, General Specifications, and Contract Drawings & BOQ.
Analyze drawings, specifications and statements of work in the preparation of activity networks for project
resource planning and scheduling.
Follow up with various departments within the company in all Project related matters of the operation of
the Project.
Responsible for managing a Staff/Labor in the project.
To evaluate the requirement of all project resources (materials, machinery, manpower) as per schedule
and arrange for the availability of the same.
Planning and scheduling of resources (material, manpower etc.) Resources Mobilization.
Review of design drawings, Technical Co-ordination meetings, Minutes of meetings.
Lead the team of technicians and supervisors to effectively perform the projects.
Installation of Main distribution boards (MDB’s), sub main distribution boards (SMDB’s),
Cable size calculation, continuity test, wire selecting & testing and rating of circuit.
To ensure a successful completion of the Project within the budget and on time.
Matric 01 July 2014
ScienceIntermediate 01 July 2014
PRE-ENGGBachelor 01 September 2020
Electrical Engineering PowerOther 15 February 2021
NEBOSH IGC